Approved Materials - Bridge Items: Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
| m Irina Idelson moved page Preapproved Materials Bridge Items to Approved Materials - Bridge Items | |||
| Line 1: | Line 1: | ||
| == Abutment Strip Drain == | == Abutment Strip Drain == | ||
| {{Specification|SPEC=Overland Park Specification: Abutment Strip Drain refers to [[Media:1706.pdf|KDOT Section 1706]]}} | {{Specification|SPEC=Overland Park Specification: Abutment Strip Drain refers to [[Media:1706.pdf|KDOT Section 1706]]}} | ||
| *This item is covered under the KDOT Materials List as [ | *This item is covered under the KDOT Materials List as [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-42-0.pdf PQL-42], last updated on 03/24/2017. | ||
| == Bridge Backwall Protection System == | == Bridge Backwall Protection System == | ||
Revision as of 09:12, 27 March 2019
Abutment Strip Drain
Applicable Specification:
| Overland Park Specification: Abutment Strip Drain refers to KDOT Section 1706 | 
- This item is covered under the KDOT Materials List as PQL-42, last updated on 03/24/2017.
Bridge Backwall Protection System
Applicable Specification:
| Overland Park Specification: Bridge Backwall Protection System refers to KDOT Section 724 and KDOT Section 1708 | 
- This item is covered under the KDOT Materials List as PQL-33, last updated on 9/1/12.