Difference between revisions of "Approved Materials - Bridge Items"
Jump to navigation
Jump to search
Zach Matteo (talk | contribs) |
Zach Matteo (talk | contribs) |
||
Line 6: | Line 6: | ||
== Bridge Backwall Protection System == | == Bridge Backwall Protection System == | ||
{{Specification|SPEC=Overland Park Specification: Bridge Backwall Protection System<br>refers to<br>[ | {{Specification|SPEC=Overland Park Specification: Bridge Backwall Protection System<br>refers to<br>[http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/1708.pdf KDOT Section 1708]}} | ||
*This item is covered under the KDOT Materials List as [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-33-0.pdf PQL-33]. | *This item is covered under the KDOT Materials List as [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-33-0.pdf PQL-33]. |
Revision as of 08:24, 13 February 2017
Return to Preapproved Materials
Abutment Strip Drain
Applicable Specification:
Overland Park Specification: Abutment Strip Drain refers to KDOT Section 1706] |
- This item is covered under the KDOT Materials List as PQL-42.
Bridge Backwall Protection System
Applicable Specification:
Overland Park Specification: Bridge Backwall Protection System refers to KDOT Section 1708 |
- This item is covered under the KDOT Materials List as PQL-33.