Difference between revisions of "2100"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
m
m
 
Line 52: Line 52:
|EROSION CONTROL MATERIALS
|EROSION CONTROL MATERIALS
|-
|-
|[[2114]]
|[[2114]] / (902 OP)
|TEMPORARY SEDIMENT BARRIERS
|TEMPORARY SEDIMENT BARRIERS / TEMP EROSION & POLLUTION PREVENTION
|-
|-
|
|

Latest revision as of 11:18, 16 January 2024

MATERIALS FOR ROADSIDE IMPROVEMENTS

2101 / (906 OP) TOPSOIL
2102 / (908 OP) PLANTS / TREE & SHRUB PLANTING & MAINTENANCE
2103 / (904 OP) SEEDS / SEEDING
15-21001 - SEEDS
2104 / (907 OP) SODS
2105 SOIL COMPOST
2106 NITROGEN FIXING BACTERIA
2107 AGRICULTURAL LIMESTONE
2108 FERTILIZERS
2109 PEAT MOSS
2110 MULCH
15-09003 - MULCHING
15-ER-1-R20 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015
2111 MULCH TACKING SLURRY
15-21002 - MULCH TACKING SLURRY
2112 WEED CONTROL FABRIC
2113 EROSION CONTROL MATERIALS
2114 / (902 OP) TEMPORARY SEDIMENT BARRIERS / TEMP EROSION & POLLUTION PREVENTION
15-ER-1-R22 - ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015