Difference between revisions of "File:V-13f.xlt"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
(spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.)
 
(Jearcher uploaded a new version of "File:V-13f.xlt": Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.)
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
[[Category:Phase V Exhibits]]

Latest revision as of 14:42, 3 June 2014

spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current14:42, 3 June 2014 (45 KB)Joe Archer (talk | contribs)Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
07:12, 19 April 2011 (33 KB)Joe Archer (talk | contribs)Spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.
06:23, 15 April 2010 (35 KB)Mike Ross (talk | contribs)spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.

There are no pages that use this file.