Difference between revisions of "Bid item list"
Jump to navigation
Jump to search
Joe Archer (talk | contribs) |
Joe Archer (talk | contribs) |
||
Line 4: | Line 4: | ||
|- | |- | ||
! SECTION NUMBER | ! SECTION NUMBER | ||
! BID ITEM | |||
! UNIT | ! UNIT | ||
|- | |- | ||
| style="text-align: center;" | [[Media:Sec101.pdf|'''101]] || LS ||| | | style="text-align: center;" | [[Media:Sec101.pdf|'''101]] || MAINTENANCE BOND ||| LS | ||
|- | |||
| style="text-align: center;" | [[Media:Sec103.pdf|'''103''']] || PRE CONSTRUCTION SURVEY ||| EACH | |||
|- | |||
| style="text-align: center;" | [[Media:Sec104.pdf|'''104''']] || FORCE ACCOUNT ||| LS | |||
|- | |||
| style="text-align: center;" | [[Media:Sec201.pdf|'''201''']] || CLEARING AND GRUBBING ||| LS | |||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec202.pdf|'''202''']] || REMOVAL OF EXISTING STRUCTURES ||| LS | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec203.pdf|'''203''']] || TREE REMOVAL ||| EACH | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec205.pdf|'''205''']] || UNCLASSIFIED EXCAVATION ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec205.pdf|'''205''']] || EXCAVATION (UNSUITABLE) ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec205.pdf|'''205''']] || EXCAVATION (UNSTABLE) ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec206.pdf|'''206''']] || EMBANKMENT (CONTRACTOR FURNISHED) ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec207.pdf|'''207''']] || COMPACTION OF EARTHWORK (*) (**) ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec208.pdf|'''208''']] || LINEAR GRADING ||| LNFT | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec208.pdf|'''208''']] || SUBGRADE STABILIZATION ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec211.pdf|'''211''']] || AREA/SWALE GRADING ||| LS | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec303.pdf|'''303''']] || FLY ASH ||| TON | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec303.pdf|'''303''']] || MANIPULATION FOR FLY ASH TREATED SUBGRADE (*) ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec304.pdf|'''304''']] || AGGREGATE BASE COURSE (OP SPECIAL) (*) ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec305.pdf|'''305''']] - [[Media:Sec836.pdf|'''836''']] || AGGREGATE BASE (*) (**) ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec305.pdf|'''305''']] || AGGREGATE SHOULDER (*) (**) ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec309.pdf|'''309''']] || FOUNDATION STABILIZATION ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec315.pdf|'''315''']] || TYPE I STREET REPAIR ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec316.pdf|'''316''']] || TYPE II STREET REPAIR ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media: | | style="text-align: center;" | [[Media:Sec401.pdf|'''401''']] || KCMMB 4K CONCRETE (*) ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media:Sec401.pdf|'''401''']] || CONCRETE | | style="text-align: center;" | [[Media:Sec401.pdf|'''401''']] || KCMMB 5K CONCRETE (*) ||| CUYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media:Sec502.pdf|'''502''']] || PORTLAND CEMENT CONCRETE PAVEMENT | | style="text-align: center;" | [[Media:Sec502.pdf|'''502''']] || PORTLAND CEMENT CONCRETE PAVEMENT | ||
Line 129: | Line 135: | ||
| style="text-align: center;" | [[Media:Sec835.pdf|'''835''']] || RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP | | style="text-align: center;" | [[Media:Sec835.pdf|'''835''']] || RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP | ||
|- | |- | ||
| style="text-align: center;" | [[Media:Sec836.pdf|'''836''']] || | | style="text-align: center;" | [[Media:Sec836.pdf|'''836''']] || AGGREGATE BASE (*) (**) ||| SQYD | ||
|- | |- | ||
| style="text-align: center;" | [[Media:Sec840.pdf|'''840''']] || TEMPORARY SURFACING MATERIAL | | style="text-align: center;" | [[Media:Sec840.pdf|'''840''']] || TEMPORARY SURFACING MATERIAL |
Revision as of 09:35, 21 April 2020
This page is under construction. The below specification documents are under review and are not approved for use at this time. 4/16/2020
SECTION NUMBER | BID ITEM | UNIT |
---|---|---|
101 | MAINTENANCE BOND | LS |
103 | PRE CONSTRUCTION SURVEY | EACH |
104 | FORCE ACCOUNT | LS |
201 | CLEARING AND GRUBBING | LS |
202 | REMOVAL OF EXISTING STRUCTURES | LS |
203 | TREE REMOVAL | EACH |
205 | UNCLASSIFIED EXCAVATION | CUYD |
205 | EXCAVATION (UNSUITABLE) | CUYD |
205 | EXCAVATION (UNSTABLE) | CUYD |
206 | EMBANKMENT (CONTRACTOR FURNISHED) | CUYD |
207 | COMPACTION OF EARTHWORK (*) (**) | CUYD |
208 | LINEAR GRADING | LNFT |
208 | SUBGRADE STABILIZATION | CUYD |
211 | AREA/SWALE GRADING | LS |
303 | FLY ASH | TON |
303 | MANIPULATION FOR FLY ASH TREATED SUBGRADE (*) | SQYD |
304 | AGGREGATE BASE COURSE (OP SPECIAL) (*) | SQYD |
305 - 836 | AGGREGATE BASE (*) (**) | SQYD |
305 | AGGREGATE SHOULDER (*) (**) | SQYD |
309 | FOUNDATION STABILIZATION | CUYD |
315 | TYPE I STREET REPAIR | SQYD |
316 | TYPE II STREET REPAIR | SQYD |
401 | KCMMB 4K CONCRETE (*) | CUYD |
401 | KCMMB 5K CONCRETE (*) | CUYD |
502 | PORTLAND CEMENT CONCRETE PAVEMENT | |
503 | CONCRETE COLLAR | |
600 | OVERLAND PARK SUPERPAVE ASPHALTIC CONCRETE SURFACE AND INTERMEDIATE COURSE | |
608 | BITUMINOUS SURFACE TREATMENT | |
612 | METHODS OF MILLING OPERATIONS | |
613 | ULTRATHIN BONDED ASPHALT SURFACE (UBAS) | |
614 | ASPHALTIC CONCRETE OVERLAY OPERATIONS | |
615 | STREET SWEEPING | |
616 | POTHOLE REPAIR | |
617 | METHODS OF TEXTURING OPERATIONS (MACROTEXTURE SPECIFIED) | |
618 | ASPHALTIC BASE REPAIR | |
619 | ASPHALTIC PATCHING (SPECIFIED DEPTH)/PARTIAL DEPTH PATCHING | |
620 | ASPHALT SIDEWALK CONSTRUCTION | |
703 | DRILLED SHAFTS | |
704 | STEEL PILES | |
711 | REINFORCING STEEL | |
715 | PRESTRESSED CONCRETE BEAMS | |
721 | HANDRAIL | |
724 | BRIDGE BACKWALL PROTECTION SYSTEM | |
725 | ABUTMENT DRAINAGE SYSTEMS | |
726 | CONCRETE MASONRY COATING | |
735 | PRECAST REINFORCED CONCRETE BOX CULVERT | |
745 | BRIDGE NUMBER PLAQUE | |
746 | BRIDGE DECK CONSTRUCTION | |
802 | CONTRACTOR CONSTRUCTION STAKING | |
805 | TRAFFIC CONTROL | |
809 | CONCRETE SAFETY BARRIER | |
815 | STORM SEWER INLETS, MANHOLES AND JUNCTION BOXES | |
816 | ADJUSTMENT OF MANHOLE AND VALVES | |
817 | STORM SEWERS | |
820 | SLOPE DRAIN | |
822 | PIPE UNDERDRAIN | |
824 | CONCRETE SIDEWALK AND SIDEWALK RAMP CONSTRUCTION | |
825 | CONCRETE CURB CONSTRUCTION | |
827 | GUARDRAIL, STEEL PLATE (GALVANIZED) | |
828 | FENCING | |
829 | STONE RIPRAP | |
831 | CONCRETE DITCH LINING | |
833 | CONCRETE PAVEMENT PATCHING | |
835 | RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP | |
836 | AGGREGATE BASE (*) (**) | SQYD |
840 | TEMPORARY SURFACING MATERIAL | |
843 | FLOWABLE FILL | |
847 | MAILBOX ADJUSTMENTS | |
850 | GEOTEXTILE | |
855 | CONCRETE PAVER STONES | |
856 | BRICK PAVERS | |
860 | CONCRETE MEDIAN NOSE | |
861 | SAWING | |
863 | SERVICE WATER LINE RELOCATION | |
864 | STORMWATER TREATMENT UNITS | |
865 | SANITARY SEWERS | |
866 | SANITARY SEWER ENCASEMENT | |
868 | PROJECT SIGN | |
869 | LAND CORNER MONUMENT BOX | |
870 | BENCHMARK MONUMENT | |
871 | PROPERTY CORNERS | |
878 | CRACK SEALING | |
879 | PEDESTRIAN PUSH BUTTON MODIFICATION | |
880 | GUARDRAIL MODIFICATIONS | |
882 | INTEGRAL SIDEWALK RETAINING WALL | |
883 | WALL FORM LINER TREATMENT | |
884 | CONCRETE PATCHING | |
885 | RESIDENT TRANSPORTATION SERVICE | |
901 | STORMWATER POLLUTION MANAGEMENT | |
902 | TEMPORARY EROSION AND POLLUTION CONTROL | |
904 | SEEDING | |
906 | TOPSOIL | |
907 | SODDING | |
908 | TREE AND SHRUB PLANTING AND MAINTENANCE | |
914 | LAWN SPRINKLER SYSTEM | |
917 | PRUNING | |
1000 | STREETLIGHTING INSTALLATION | |
1020 | TRAFFIC SIGNAL INSTALLATION | |
1021 | LOOP DETECTOR | |
1040 | FIBER OPTIC COMMUNICATION SYSTEM INSTALLATION | |
1060 | PERMANENT TRAFFIC CONTROL SIGNING | |
1061 | ILLUMINATED OVERHEAD STREET NAME SIGNS | |
1062 | ARTERIAL DYNAMIC MESSAGE SIGNS | |
1063 | RECTANGULAR RAPID FLASHING BEACON INSTALLATION | |
1064 | TUBULAR DELINEATOR | |
1080 | TEMPORARY PAVEMENT MARKINGS | |
1081 | INTERIM PAVEMENT MARKINGS | |
1082 | COLD PLASTIC PAVEMENT MARKINGS | |
1083 | METHYL METHACRYLATE (MMA) PAVEMENT MARKINGS | |
1084 | PATTERNED COLD PLASTIC PAVEMENT MARKINGS | |
1085 | PREFORMED THERMOPLASTIC PAVEMENT MARKINGS | |
1086 | THERMOPLASTIC PAVEMENT MARKINGS | |
1087 | URETHANE ACRYLATE PAVEMENT MARKINGS | |
1088 | WATERBORNE PAINT PAVEMENT MARKINGS | |
1089 | INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS | |
1104 | AB-3 OVERLAND PARK MODIFIED |