Difference between revisions of "Approved Materials - Bridge Items"

From PPM Wiki - City of Overland Park Projects and Procedures Manual Pages
Jump to navigation Jump to search
Line 2: Line 2:


== Abutment Strip Drain ==
== Abutment Strip Drain ==
{{Specification|SPEC=Overland Park Specification: Abutment Strip Drain<br>refers to<br>[http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/1706.pdf KDOT Section 1706]}}
{{Specification|SPEC=Overland Park Specification: Abutment Strip Drain<br>refers to [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/1706.pdf KDOT Section 1706]}}
*This item is covered under the KDOT Materials List as [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-42-0.pdf PQL-42.]
*This item is covered under the KDOT Materials List as [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burMatrRes/PQL/pql-42-0.pdf PQL-42.]



Revision as of 08:26, 13 February 2017

Return to Preapproved Materials

Abutment Strip Drain

Applicable Specification:

Overland Park Specification: Abutment Strip Drain
refers to KDOT Section 1706
  • This item is covered under the KDOT Materials List as PQL-42.

Bridge Backwall Protection System

Applicable Specification:

Overland Park Specification: Bridge Backwall Protection System
refers to
KDOT Section 1708
  • This item is covered under the KDOT Materials List as PQL-33.