Recent changes
Jump to navigation
Jump to search
Track the most recent changes to the wiki on this page.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
7 June 2024
11:35 | Approved Materials - Traffic Signals diffhist −94 Brian Geiger talk contribs →Power Transfer Switches: Updated from SPH-302 to SPH-303 bypass switch. |
|
11:34 | (Upload log) [Brian Geiger (2×)] | |||
|
11:34 Brian Geiger talk contribs uploaded a new version of File:TRF PQL TS MEM Clary PowerTransferSwitch.pdf (File uploaded with MsUpload) | ||||
|
11:34 Brian Geiger talk contribs uploaded a new version of File:TRF PQL TS CAT Clary PowerTransferSwitch.pdf (File uploaded with MsUpload) |
6 June 2024
15:29 | User rights log Dan Hurley talk contribs changed group membership for Tiesha Morgan from (none) to administrator and bureaucrat |
15:14 | User creation log User account Tiesha Morgan talk contribs was created by Dan Hurley talk contribs |
m 09:48 | Approved Materials - Traffic Signals diffhist +85 Brian Geiger talk contribs →Power Transfer Switches: Notes about discontinuation of SPH-302 with Jim Cole on a phone call with Hightower. |
31 May 2024
14:59 | Phase V - Construction diffhist +12 Alisha Holcomb talk contribs →Task No. 14 - On-Going Contractor Payments |
10:17 | Phase IV - Pre-Construction diffhist +1 Alisha Holcomb talk contribs →Task No. 2 - Selection of Material Testing Firm |
10:17 | Upload log Alisha Holcomb talk contribs uploaded File:IV-2g Testing Services Agreement - rev 5-31-24.docx |
29 May 2024
15:27 | Phase IV - Pre-Construction diffhist 0 Alisha Holcomb talk contribs →Task No. 5 - Notice to Contractors/DBE Firms |
15:23 | Upload log Alisha Holcomb talk contribs uploaded File:IV-5f Traffic Signal Streetlight-Fiber Equipment 5-29-24.docx |
22 May 2024
|
15:16 | Approved Materials - Specialty Items 2 changes history +873 [Brian Geiger (2×)] | |||
|
15:16 (cur | prev) −93 Brian Geiger talk contribs →LED Lamps: Updated Keystone Info | ||||
|
15:13 (cur | prev) +966 Brian Geiger talk contribs Added Outline for Keystone LED Lamps in Decorative Globe Fixture Downtown |
|
15:15 | (Upload log) [Brian Geiger (2×)] | |||
|
15:15 Brian Geiger talk contribs uploaded File:TRF PQL SI CAT Keystone LEDLampInGlobe.pdf (File uploaded with MsUpload) | ||||
|
15:15 Brian Geiger talk contribs uploaded File:TRF PQL SI MEM Keystone LEDLampInGlobe.pdf (File uploaded with MsUpload) |
14:39 | Approved Materials - Pavement Marking diffhist −800 Brian Geiger talk contribs Removed Integrated Multipolymer HPS-8 from APL due to poor performance on concrete pavement |