Search results

Jump to navigation Jump to search
  • == Task No. 15 - On-Going Change Orders == ...act time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Ref
    47 KB (7,234 words) - 09:01, 16 June 2023
  • ...ltiplying factor included in the calculations to account for factors which change in time after the initial installation of the streetlighting system. This ...the control center can be relocated to a better position, make the design change. If not, ask KCP&L to provide an estimate to the City for the cost associa
    134 KB (20,478 words) - 12:33, 13 December 2023