<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://ppm.opkansas.org/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Jackie+Clark</id>
	<title>PPM Wiki - City of Overland Park Projects and Procedures Manual Pages - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://ppm.opkansas.org/wiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Jackie+Clark"/>
	<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php/Special:Contributions/Jackie_Clark"/>
	<updated>2026-10-12T01:09:44Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.43.1</generator>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Main_Page&amp;diff=21972</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Main_Page&amp;diff=21972"/>
		<updated>2025-05-05T14:37:20Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{| class=&amp;quot;wikitable&amp;quot; border=&amp;quot;0&amp;quot; width=100%  cellpadding=&amp;quot;20&amp;quot;&lt;br /&gt;
|- style=&amp;quot;height: 80px;&amp;quot; &lt;br /&gt;
| bgcolor=&amp;quot;#8D4352&amp;quot;|&amp;lt;font size=&amp;quot;6&amp;quot; face=&amp;quot;garamond&amp;quot; color=&amp;quot;white&amp;quot;&amp;gt;&#039;&#039;&#039;Overland Park Project Procedures Manual&#039;&#039;&#039;&amp;lt;/font&amp;gt;&lt;br /&gt;
|}&lt;br /&gt;
{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
== Overview ==&lt;br /&gt;
&lt;br /&gt;
[[Introduction]]&lt;br /&gt;
&lt;br /&gt;
[[List of Initials and Acronyms]]&lt;br /&gt;
&lt;br /&gt;
[[Project Development Procedures for Non-NHS Projects - Checklist]]&lt;br /&gt;
&lt;br /&gt;
[[Revision History]]&lt;br /&gt;
&lt;br /&gt;
[[References]]&lt;br /&gt;
&lt;br /&gt;
== Phases ==&lt;br /&gt;
&lt;br /&gt;
[[Phase I - Vision]]&lt;br /&gt;
&lt;br /&gt;
[[Phase II - Preliminary Design]]&lt;br /&gt;
&lt;br /&gt;
[[Phase III - Final Design]]&lt;br /&gt;
&lt;br /&gt;
[[Phase IV - Pre-Construction]]&lt;br /&gt;
&lt;br /&gt;
[[Phase V - Construction]]&lt;br /&gt;
&lt;br /&gt;
[[Phase VI - Retrospect]]&lt;br /&gt;
&lt;br /&gt;
== Traffic Engineering Information ==&lt;br /&gt;
[[Approved_Materials|&#039;&#039;&#039;Approved Materials List&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;[[Pavement Marking Design Manual]]&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;[[Streetlight Design Manual]]&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;[[Traffic Sign Design Guidelines]]&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
== Special Pages ==&lt;br /&gt;
[[Special:ListFiles|File Listing]]&lt;br /&gt;
&lt;br /&gt;
[https://en.wikipedia.org/wiki/Wikipedia:Tools#Importing_(converting)_content_to_Wikipedia_(MediaWiki)_format Converting content to Wikipedia (MediaWiki) format]&lt;br /&gt;
&lt;br /&gt;
Consult the [http://meta.wikimedia.org/wiki/Help:Contents User&#039;s Guide] for information on using the wiki software.&lt;br /&gt;
&lt;br /&gt;
== Getting started ==&lt;br /&gt;
* [http://www.mediawiki.org/wiki/Manual:Configuration_settings Configuration settings list]&lt;br /&gt;
* [http://www.mediawiki.org/wiki/Manual:FAQ MediaWiki FAQ]&lt;br /&gt;
* [https://lists.wikimedia.org/mailman/listinfo/mediawiki-announce MediaWiki release mailing list]&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=18542</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=18542"/>
		<updated>2020-06-30T21:24:35Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 15 - On-Going Change Orders */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Phase V Checklist]] ==&lt;br /&gt;
&amp;lt;!--&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
--&amp;gt;&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing when required.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Prior to Notice to Proceed, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Prior to Notice to Proceed, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department.&lt;br /&gt;
&lt;br /&gt;
See [[Phase_II_-_Preliminary_Design#Task_No._6_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29|&#039;&#039;&#039;Phase II, Task No. 6&#039;&#039;&#039;]] for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Copies of the Contract Documents need to be prepared for the Contractor’s execution.  The Agreement, Performance Bond, Maintenance Bond, Statutory Bond and/or Labor and Material Payment Bond, and Appointment of Service Agent are partially filled out by the Contract Specialist and provided to the Contractor for execution.  The Appointment of Service Agent is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State.  The Contract Specialist will obtain this information through the Kansas Secretary of State’s office.  &lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents.  The Contractor must have all insurance certificates, bonds and Appointment of Service Agent filled out, sealed, with Power of Attorneys attached.  The Contract Specialist will review the insurance certificates to ensure compliance with the requirements set forth in the Instructions to Bidders. &lt;br /&gt;
&lt;br /&gt;
After review by the Contract Specialist, the Contract Documents are submitted to the Law Department for review and &amp;quot;approval as to form.&amp;quot;  After Law Department review, they are submitted to the City Clerk&#039;s office for signature by the Mayor and attestation by the City Clerk.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|V-4a.dot|No. V-4a| is a sample transmittal letter to KDOT}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-4b Sample Transmittal Letter to Contractor.docx|No. V-4b| is a sample transmittal letter to the Contractor}}.&lt;br /&gt;
&lt;br /&gt;
Upon return of the signed copies by the City Clerk, three fully executed sets are given to the Contractor (one is to be forwarded to the Contractor’s surety company and one to their insurance company), one is given to the consultant, one is kept in the Public Works file, and one goes to the City Clerk with the award/reject letters.  The remaining sets are provided to various other agencies as needed (i.e.: for CARS projects the City must submit to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of signed and sealed Construction Plans along with a CD containing a .&#039;&#039;pdf&#039;&#039; version of the executed Contract Documents and Construction Plans.)  The County also requires a list of CARS non-participating items with the transmittal.  The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project.&lt;br /&gt;
For a letter detailing the CARS requirements see [[media:III-9c.pdf|&#039;&#039;&#039;Exhibit No. III-9c&#039;&#039;&#039;.]]&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-4c CARS Notice to Proceed.pdf|No. V-4c| is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-4d Contract Documents and Plan Distribution.docx|No. V-4d| is a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans}}.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed for KDOT projects, the Project Manager will request from the contractor copies of all DBE subcontracts and at least one randomly selected non-DBE subcontract. The Project Manager will verify that each of these subcontracts contain FHWA 1273 documents.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-4e.dot|No. V-4e|is a sample transmittal letter to prime contractor requesting a copy of each signed DBE subcontract.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see [[Media:II-14.xlt|&#039;&#039;&#039;Exhibit No. II-14&#039;&#039;&#039;]].  The Project Manager shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will provide a sales tax exemption number form from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects.  The request will be made on-line at KDOR&#039;s Customer Service Center.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-5a.pdf|No. V-5a| - new requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-5b Sample Project Exemption Certificate and cover letter.pdf|No. V-5b| - is a sample transmittal letter from the Division of Taxation with Exemption Certificate}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-5c Sample Transmittal to Contractor with Tax Exemption Certificate.docx|No. V-5c|is a sample transmittal letter to the contractor regarding Exemption Certificate}}.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from [[Phase_IV_-_Pre-Construction#Task_No._2_-_Selection_of_Material_Testing_Firm|&#039;&#039;&#039;Phase IV, Task No. 2&#039;&#039;&#039;]]. The firm with the most qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:[[Media:V-6a.pdf|&#039;&#039;&#039;Exhibit No. V-6a&#039;&#039;&#039;]] &#039;&#039;is a sample letter to selected material testing lab&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:[[Media:V-6b.pdf|&#039;&#039;&#039;Exhibit No. V-6b&#039;&#039;&#039;]] &#039;&#039;is a sample letter to material testing companies not selected&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
An agreement will be provided to the testing firm by the Contract Specialist. Once it is executed by the testing firm and insurance certificates are received, the agreement will be executed by the City according to &#039;&#039;&#039;[http://opnet2.opkansas.org/download/city_policies/cop/COP-247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|When scheduling meeting in Google calendar, in order to avoid conflicts with utility meetings, CH-PW Utilities (found under Rooms tab) shall be &amp;quot;invited&amp;quot; as an attendee to pre-bid conferences, pre-construction conferences or any meetings that require utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
*review the plans, special provisions and specifications for the project; &lt;br /&gt;
&lt;br /&gt;
*meet the Contractor’s assigned Superintendent; &lt;br /&gt;
&lt;br /&gt;
*meet the Sub-Contractor(s); &lt;br /&gt;
&lt;br /&gt;
*receive/discuss the Contractor’s schedule; &lt;br /&gt;
&lt;br /&gt;
*confirm City’s payment schedule;&lt;br /&gt;
 &lt;br /&gt;
*status report/confirmation of utility relocations; &lt;br /&gt;
&lt;br /&gt;
*review/presentation of City’s pre-construction checklist; &lt;br /&gt;
&lt;br /&gt;
*answer contractor questions; &lt;br /&gt;
&lt;br /&gt;
*distribute contractors submittal checklist (see exhibit below) and review requirements;&lt;br /&gt;
&lt;br /&gt;
*distribute SWPPP Notebook to Contractor, review requirements and obtain signature for Contractor&#039;s Certification Form (included in the SWPPP);  &lt;br /&gt;
&lt;br /&gt;
*distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity; &lt;br /&gt;
&lt;br /&gt;
*distribute &#039;&#039;&#039;[[Approved_Materials|Approved Materials List]]&#039;&#039;&#039;; &lt;br /&gt;
&lt;br /&gt;
*determine if a City Field Building Permit is required by the Contractor; &lt;br /&gt;
&lt;br /&gt;
*introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
*remind all contractors that they must comply with all Equal Employment Opportunity (EEO) requirements. For KDOT projects the Contractor&#039;s current EEO policy and subcontractor&#039;s policies must be on file with KDOT and submitted annually. For EEO compliance resource see KDOT&#039;s &amp;lt;u&amp;gt;[http://www.ksdot.org/Assets/wwwksdotorg/bureaus/divAdmin/Documents/EEOContractComplianceManual.pdf &#039;&#039;&#039;Contractors EEO Compliance Manual&#039;&#039;&#039;]&amp;lt;/u&amp;gt;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7a contractor submittal checklist.xlsx|No. V-7a| is a contractors submittal checklist}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7b.dot|No. V-7b| is an Excellence in Construction information document}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7c.xlsx|No. V-7c| is an Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;)}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-7e Sign in sheet.docx|No. II-7e| is a meeting sign in sheet}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7d.dot|No. V-7d| is a sample pre-construction invitation attendance letter}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Pre-construction agenda.docx|No. V-7e| is a sample pre-construction agenda}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7f.pdf|No. V-7f| is the City’s standard pre-construction meeting checklist}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7g.pdf|No. V-7g| is a sample of a City’s Field Building Permit for electrical work}}.&lt;br /&gt;
&lt;br /&gt;
:[[Media:SWPPP-Contractor&#039;s Certification Form.pdf|&#039;&#039;&#039;Exhibit No. V-7h&#039;&#039;&#039;]] &#039;&#039;is a Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity&#039;&#039;.&lt;br /&gt;
 &lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable, coordinate date and location), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, an LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7i.pdf|No. V-7i| is a LPA Preconstruction Conference guidelines}}.&lt;br /&gt;
&lt;br /&gt;
{{Note|An address must be established for each streetlight control center and traffic signal location for EVERGY billing and reference purpose}}.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC, the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Complete Contractor Permits ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Project Manager will obtain [https://dw.opkansas.org/public/FileCabinets/2fa13812-70a3-4126-848b-3a20df7175c3/Documents/9362/FileDownload?targetFileType=Auto&amp;amp;keepAnnotations=false &#039;&#039;&#039;Land Disturbance Permit&#039;&#039;&#039;] from Permit Services, Planning &amp;amp; Development Services.&lt;br /&gt;
&lt;br /&gt;
Direct the Contractor to obtain a Right-of-Way Permit from the City. Download [https://dw.opkansas.org/public/FileCabinets/2fa13812-70a3-4126-848b-3a20df7175c3/Documents/124/FileDownload?targetFileType=Auto&amp;amp;keepAnnotations=false &#039;&#039;&#039;Right-of-Way Permit Application&#039;&#039;&#039;] from City&#039;s website. The Right-of-Way permit exempts the roadway contractors working for the City from the restrictions placed on them by the noise ordinance.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager shall schedule the 3rd Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project and discuss the schedule. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, who to contact (Contractor’s employees) during the normal work day and during the night and weekends. The importance of safety during the project construction time period will be stressed. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects the Notice of Public Information Meeting must be published in [http://www.kssos.org/pubs/pubs_kansas_register.asp &#039;&#039;&#039;Kansas Register&#039;&#039;&#039;] and [http://www.thelegalrecord.net &#039;&#039;&#039;The Legal Record&#039;&#039;&#039;].&lt;br /&gt;
 &lt;br /&gt;
See &#039;&#039;&#039;[[Phase_II_-_Preliminary_Design#Task_No._15_-_Schedule_First_Public_Information_Meeting|Phase II, Task No. 15]]&#039;&#039;&#039; for list of invitees.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-9a Public Meeting Invitation Open House.pdf|No. V-9a| is an example Invitation Letter to property owners (open house format).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-9b Notice of Public Meeting.pdf|No. V-9b| is an example Notice of Public Information Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-9c Public Meeting Handout.pdf|No. V-9c| is an example meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-36b public meeting sign-in sheet.docx|No. II-36b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.  The KDOT&#039;s Equal Opportunity and Civil Rights Information brochure in [[Media:Title VI Brochure English.pdf|&#039;&#039;&#039;English&#039;&#039;&#039;]] and [[Media:Title VI Brochure Spanish.pdf|&#039;&#039;&#039;Spanish&#039;&#039;&#039;]] is to be made available at all public meetings.}}&lt;br /&gt;
&lt;br /&gt;
For those who wish to use a Blue Valley School District facility for the public meeting, an on-line [https://district.bluevalleyk12.org/Community/Pages/FacilityRental.aspx &#039;&#039;&#039;Facility Rental Reservation Request&#039;&#039;&#039;] is available. Once the request is submitted, the BVSD Facility Scheduling Office will send a confirmation if the requested space is available.&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and the Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the Notice to Proceed.  This notice shall state the date the work is to begin, intermediate completion dates if applicable, and the date the work is to be completed.  The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP. &lt;br /&gt;
&lt;br /&gt;
Prior to issuing the Notice to Proceed, the Project Manager will verify that copies of all DBE subcontracts and at least one randomly selected non-DBE subcontract have been received and that they contain &#039;&#039;&#039;FHWA 1273&#039;&#039;&#039; documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a Notice to Proceed from the Johnson County Director of Infrastructure before issuing Notice to Proceed.   See &#039;&#039;&#039;[[Phase_V_-_Construction#Task_No._4_-_Distribute_Executed_Contract_Documents|Phase V, Task No.4]]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Notice to Proceed.docx|No. V-10|is a sample Notice to Proceed to the contractor.}}&lt;br /&gt;
&lt;br /&gt;
At this time project photos/videos should begin and should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items. If possible, the photos should be taken from the same vantage points throughout construction to best depict progress.  The Project Manager may utilize drone services to provide photo and video project documentation. Drone services are provided by the outside consultants.&lt;br /&gt;
&lt;br /&gt;
Example project photos taken by drone [[media:Metcalf at 167th before during after.pdf|&#039;&#039;&#039;Metcalf Avenue at 167th Street  looking north&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the &#039;&#039;&#039;[[Approved_Materials|Approved Materials List]]&#039;&#039;&#039;, they can complete the &#039;&#039;&#039;[[Project_Submittal_Forms|Project Submittal Forms]]&#039;&#039;&#039;. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-7a contractor submittal checklist.xlsx|No. V-7a|is a contractor submittals checklist.}} &lt;br /&gt;
{{Exhibit|V-11a.dot|No. V-11a|is a storm sewer structure shop drawing checklist.}}&lt;br /&gt;
{{Exhibit|V-11b.dot|No. V-11b|is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter (for non-KCMMB mixes).}}&lt;br /&gt;
{{Exhibit|V-11c Submittal Cover letter.docx|No. V-11c|is a transmittal letter to the contractor for completed submittals review.}}&lt;br /&gt;
{{Exhibit|V-11d Sample Transmittal Letter.pdf|No. V-11d|is a sample transmittal letter to the contractor.}}&lt;br /&gt;
&lt;br /&gt;
The submittal response is to be copied to the following:&lt;br /&gt;
&lt;br /&gt;
:Contractor&#039;s Project Manager;&lt;br /&gt;
:Contractor&#039;s Superintendent;&lt;br /&gt;
:Project Inspector(s);&lt;br /&gt;
:Project Design Engineer.&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, the Project Manager shall verify that submittals meet the requirements for Control of Materials, as listed in [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/106.pdf &#039;&#039;&#039;Section 106&#039;&#039;&#039;] of KDOT Standard Specifications.&lt;br /&gt;
&lt;br /&gt;
== Task No. 11a - Coordinate Removal of Streetlights Purchased from Evergy (KCP&amp;amp;L) ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If applicable, complete the removal of streetlights, that were purchased from Evergy (KCP&amp;amp;L). See [[media:V-11a Removal Procedure During Construction.pdf|&#039;&#039;&#039;Removal of Existing Streetlight Procedure&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
*See [[media:Sample Release to Construction letter to Black &amp;amp; McDonald.pdf|&#039;&#039;&#039;sample letter to Black &amp;amp; McDonald&#039;&#039;&#039;]] releasing the removal of streetlights to construction.&lt;br /&gt;
&lt;br /&gt;
*See [[media:Sample Letter to KCP&amp;amp;L.pdf|&#039;&#039;&#039;sample letter to Evergy&#039;&#039;&#039;]] informing them that the streetlights have been removed and for them to adjust their billing information.&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable:&lt;br /&gt;
&lt;br /&gt;
*See [[media:V-12 Electrical Service Permit Procedures for Streetlighting Controllers or Traffic Signal Constrollers.pdf|&#039;&#039;&#039;Electrical Service Procedures for Streetlighting Controllers or Traffic Signals Controllers.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
*See [[media:V-12 Sample KCP&amp;amp;L Electrical Service Request Form.docx|&#039;&#039;&#039;Sample Electrical Service Request Form&#039;&#039;&#039;]].&lt;br /&gt;
{{Note|On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).}}&lt;br /&gt;
&lt;br /&gt;
The inspector(s) shall create and maintain the field books in accordance with [http://www.ksdot.org/burconsmain/Connections/ConstManual/documentationtindex.asp &#039;&#039;&#039;KDOT&#039;s Documentation Manual&#039;&#039;&#039;].&lt;br /&gt;
&lt;br /&gt;
There are sections for each type of work that provide examples on how the books are to be organized. The pages in the field book shall be numbered and any mistakes/erroneous entries shall be clearly marked and initialed. &#039;&#039;&#039;&amp;lt;font color=red&amp;gt;NEVER ERASE ANYTHING IN A FIELD BOOK !&amp;lt;/font&amp;gt;&#039;&#039;&#039; All inspectors that make entries into the field books must sign and initial on the first page.&lt;br /&gt;
&lt;br /&gt;
The checklists for various types of work are available under the [http://www.ksdot.org/burconsmain/Connections/ConstManual/checklistindex.asp &#039;&#039;&#039;Construction Checklist&#039;&#039;&#039;] link.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-12a.xlsx|No. V-12a|is a copy of the City&#039;s Daily Inspection Report (excel format).}}&lt;br /&gt;
{{Exhibit|V-12b.dot|No. V-12b|is a copy of the City&#039;s Daily Inspection Report in (word format).}}&lt;br /&gt;
{{Exhibit|V-12c.xlt|No. V-12c|is a copy of the City&#039;s Concrete Inspection Guidelines.}}&lt;br /&gt;
{{Exhibit|V-12d.dot|No. V-12d|is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).}}&lt;br /&gt;
{{Exhibit|V-12e.xlt|No. V-12e|is a copy of the City&#039;s Sidewalk Ramp Inspection Form.}}&lt;br /&gt;
:[[Media:PW ESC Inspection Report.pdf|&#039;&#039;&#039;Exhibit No. V-12f&#039;&#039;&#039;]] &#039;&#039;is a copy of Public Work&#039;s SWPPP Inspection form.&#039;&#039;&lt;br /&gt;
:[[Media:PW ESC Inspection Report Final.pdf|&#039;&#039;&#039;Exhibit No. V-12g]] &#039;&#039;is a copy of the City&#039;s Final Inspection of Erosion and Sediment Control Form&#039;&#039;.&lt;br /&gt;
{{Exhibit|V-7b.dot|No. V-7b|Excellence in Construction information document.}}&lt;br /&gt;
{{Exhibit|V-7c.xlsx|No. V-7c|Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).}}&lt;br /&gt;
&lt;br /&gt;
[[media:as-built plan process flow chart.pdf|&#039;&#039;&#039;As-Built Plan Process Flow Chart&#039;&#039;&#039;]] is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can perform construction audits on City Administered Projects at any time. See [[media:LPASiteVisitChecklist KDOT.docx|&#039;&#039;&#039;KDOT Construction Oversight Questionnaire&#039;&#039;&#039;]] for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
Control of the work should follow instructions provided in [http://www.ksdot.org/burconsmain/Connections/ConstManual/index.asp &#039;&#039;&#039;KDOT Construction Manual&#039;&#039;&#039;], Sections 2.07 through 2.13.&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the [http://www.ksdot.org/burconsmain/Connections/ConstManual/index.asp &#039;&#039;&#039;KDOT Construction Manual&#039;&#039;&#039;], Part V, Section 5.2.2.2&lt;br /&gt;
 &lt;br /&gt;
See [[media:IV-2f.pdf|&#039;&#039;&#039;Exhibit No. IV-2f&#039;&#039;&#039;]] for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-13b.docx|No. V-13b|is an example of a transmittal letter and the City&#039;s Project Data Sheet.}}&lt;br /&gt;
{{Exhibit|V-13c.xlt|No. V-13c|is the City&#039;s Material Testing Log Sheet (excel format).}}&lt;br /&gt;
{{Exhibit|V-13d.dot|No. V-13d|is the City&#039;s Material Testing Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13e.dot|No. V-13e|is the City&#039;s Material Testing Recap Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13f.xlt|No. V-13f|is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.}}&lt;br /&gt;
{{Exhibit|V-13g.xls|No. V-13g|is a spreadsheet used to generate random numbers for Earthwork testing.}}&lt;br /&gt;
{{Exhibit|V-13h.xls|No. V-13h|is a spreadsheet used to generate random numbers for Fly Ash testing.}}&lt;br /&gt;
{{Exhibit|V-13i.xls|No. V-13i|is a spreadsheet used to generate random numbers for Asphalt testing.}}&lt;br /&gt;
{{Exhibit|V-13j.xls|No. V-13j|is a spreadsheet used to generate random numbers for Concrete testing.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by a date mutually agreed upon by the Project Manager, Inspector and Contractor prior to start of construction. Pay estimates will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14 Pay Estimate.xlsx|No. V-14|is a template with instructions for creating a Monthly Pay Estimate.}} &#039;&#039;&#039;For pay estimates with DBE Payment Affidavit see template below.&#039;&#039;&#039;&lt;br /&gt;
 &lt;br /&gt;
On &#039;&#039;&#039;KDOT&#039;&#039;&#039; projects, [[media:Form 1313.xlsx|&#039;&#039;&#039;KDOT Form 1313 &amp;quot;Payment Request&amp;quot;&#039;&#039;&#039;]] must be submitted to the KDOT Project Development Engineer&#039;s Office on a monthly basis for processing through the CMS System.&lt;br /&gt;
  &lt;br /&gt;
Current contact is:&lt;br /&gt;
:Project Development Engineer - Bureau of Local Projects&lt;br /&gt;
:Kansas Department of Transportation&lt;br /&gt;
:ESOB, 700 SW Harrison Street,Topeka, KS 66603&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
On KDOT and CDBG projects, certified payroll must be provided weekly (within 7 calendar days of pay) to the Project Manager/Inspector, for each week in which any contract work is performed. When a worker&#039;s job class is not in the contract, the City will request Form 294, additional classification request for, from the BLP Project Manager to complete.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[[Phase_III_-_Final_Design#Task_No._11_-_Submit_Contract_Documents_and_Insurance|Phase III, Task No.11]]&#039;&#039;&#039; for appropriate Department of Labor Form and Instructions.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/offChiefCoun/Documents/DOT%20Form%201008.pdf &#039;&#039;&#039;DBE Payment Affidavit&#039;&#039;&#039;] (KDOT Form 1008) is to be completed by the DBE subcontractor and submitted to the prime contractor.  Prime Contractor will submit to City within 15 days after payment was received.  The [[Media:KDOT Form 1010LP.xlsx|&#039;&#039;&#039;&amp;quot;Certificate of Subcontract Work and Payment&amp;quot;&#039;&#039;&#039;]] (KDOT Form 1010) is to be completed by the prime contractor and submitted within 15 calendar days after making subcontractor payment. Once each DBE&#039;s work is 1/3 to 1/2 complete, the City will request Form 1014, Commercially Useful Function, from the BLP Project Manager to complete.}}&lt;br /&gt;
&lt;br /&gt;
The DBE Subcontractor Payment Affidavit is generated within the monthly pay estimate template.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14a Pay Estimate with DBE.xlsx|No. V-14a|is a template with instructions for creating a Monthly Pay Estimate and DBE Payment Affidavit.}} &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14b cetificate of subcontract work and payment.xlsx|No. V-14b|is the Certificate of Subcontract Work and Payment.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews for one employee, for each company, per quarter and complete KDOT [[Media:V-14d.dot|&#039;&#039;&#039;Form No. 209 - &amp;quot;Wage Rate Interview&amp;quot;&#039;&#039;&#039;]].  If during the Wage Rate Interviews, you encounter a worker classification that is not included in the David-Bacon wage rate decision, the City must submit the completed  [[Media:Form 294.pdf|&#039;&#039;&#039;Form No. 294 - &amp;quot;Request for Additional Classifications and Wage Rates&amp;quot;&#039;&#039;&#039;]] to the Department of Labor at the following email address. WHD-CBACONFORMANCE_INCOMING@dol.gov}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|executed 0294 Form.pdf|No. V-14c|is a sample of the executed Form No. 294.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to [http://opnet2.opkansas.org/download/city_policies/cop/cop-247.pdf &#039;&#039;&#039;COP 247&#039;&#039;&#039;]&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
Change orders will be submitted using the unit prices from the original bid tabs when possible. If unit prices for the work area aren&#039;t included in the original paid items list, the City and the Contractor will negotiate a price. The City will conduct a cost analysis and submit the proposal from the contractor as backup documentation to BLP. If line items are deleted or zeroed out by change order, they must be listed at the bottom of the pay estimate in the change order section as negative amounts. Line items shall never be completely removed from the original bid tabs/paid items list. When changing an existing item, the existing unit price must be used. See an example of the [https://www.ksdot.org/bureaus/burlocalproj/LPA/lpaindex.asp &#039;&#039;&#039;Final Paid Items List (FPIL)&#039;&#039;&#039;].&lt;br /&gt;
&lt;br /&gt;
Non-participating items shall be clearly marked on the original bid tabs, plans, pay estimates and change orders. Email correspondence regarding the prior approval and determination of federal participation of the change order items between the City and KDOT shall be submitted as backup documentation with change orders. Once the determination of participation has been made, the items will be marked accordingly on the pay estimates.&lt;br /&gt;
&lt;br /&gt;
When following these procedures, reimbursement of funds shall be accomplished on a monthly basis when the city submits a proper billing certification that the project is being constructed within compliance of approved plans and specifications. Billing shall be by CMS work phases which include Preliminary Engineering (PE), Right of Way (ROW), Utilities, Construction Engineering (CE) and Construction.&lt;br /&gt;
&lt;br /&gt;
The City will conduct a cost analysis of all changes to the contract included in the change order request in accordance with the Contract General Conditions. All changes, including force account changes, must be accompanied by an independent estimate. Per KDOT&#039;s Standard Specifications for State Road and Bridge Construction [http://www.ksdot.org/Assets/wwwksdotorg/bureaus/burConsMain/specprov/2015/104.pdf  &#039;&#039;&#039;Section 104.9a&#039;&#039;&#039;], all direct and indirect costs associated with the Contract Change, including labor, materials, equipment, overhead, profit, impact costs and other costs for which the Contractor claims compensation is owed. Do not include costs as listed in Subsection 104.9c.&lt;br /&gt;
&lt;br /&gt;
When receiving Federal Aid for inspection, the City will submit requests for reimbursement to the Local Construction Manager with proper documentation.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT projects - often changes occur during construction of a project tht requires adjusting the compensation paid to a contractor. All changes must be within the scope and limits of the project. All change orders require prior approval from the Local Construction Manager. All changes require approval/concurrence by BLP prior to any of the work being initiated, using Contract Order Form [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/burLocalProj/LPA/Forms/1314%20Change%20Order%20Form.pdf &#039;&#039;&#039;&#039;&#039;(KDOT Form 1314)&#039;&#039;&#039;&#039;&#039;]. KDOT will provide email concurrence on all changes within 3 business days. KDOT&#039;s role is to provide general administrative oversight and to determine the amount of federal participation. All change orders shall be submitted to BLP for entry into Construction Management System (CMS).}} &lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;{{Note|For KDOT projects - often changes occur during construction of a project that require adjusting the compensation paid to a contractor. All changes must be within the scope and limits of the project. All change orders require prior approval from the Local Construction Manager. All changes require approval/concurrence by BLP prior to any of the work being initiated, using Contract Order Form [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/burLocalProj/LPA/Forms/1314%20Change%20Order%20Form.pdf (&#039;&#039;KDOT Form 1314&#039;&#039;)]. KDOT will provide email concurrence on all changes within 3 business days. If the City does not receive prior approval, the items on that change order may be deemed non-participating, as per [https://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title23/23cfr635_main_02.tpl 23CFR635]. KDOT&#039;s role is to provide general administrative oversight and to determine the amount of federal participation. All change orders shall be submitted to BLP for entry into Construction Management System (CMS).}}&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;For KDOT projects&#039;&#039;&#039; - &#039;&#039;&#039;often changes occur during construction of a project that require adjusting the compensation paid to a contractor. All changes must be within the scope and limits of the project. All change orders require prior approval from the Local Construction Manager. All changes require approval/concurrence by BLP prior to any of the work being initiated, using Contract Order Form&#039;&#039;&#039; [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/burLocalProj/LPA/Forms/1314%20Change%20Order%20Form.pdf (&#039;&#039;KDOT &#039;&#039;&#039;Form 1314&#039;&#039;&#039;&#039;&#039;)]. &#039;&#039;&#039;KDOT will provide email concurrence on all changes within 3 business days. If the City does not receive prior approval, the items on that change order may be deemed non-participating, as per&#039;&#039;&#039; [https://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title23/23cfr635_main_02.tpl&#039;&#039;&#039;&#039;&#039;23CFR635&#039;&#039;&#039;&#039;&#039;]. &#039;&#039;&#039;KDOT&#039;s role is to provide general administrative oversight and to determine the amount of federal participation. All change orders shall be submitted to BLP for entry into Construction Management System (CMS).&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;For CARS projects&#039;&#039;&#039;, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-15a Change Order-Blank.docx|No. V-15a|is a blank change order form. (Word Format)}}&lt;br /&gt;
{{Exhibit|V-15b Change Order-Blank.xlsx|No. V-15b|is a blank change order form. (Excel Format)}}&lt;br /&gt;
{{Exhibit|Change Order executed.pdf|No. V-15c|is a sample completed change order form.}}&lt;br /&gt;
{{Exhibit|CO Transmittal Letter.pdf|No. V-15d|is a sample change order transmittal letter.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
*Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
*Hold regular progress meetings. &lt;br /&gt;
*Prepare/approve monthly Contractor pay estimates, Consultant invoices and change orders. &lt;br /&gt;
*For KDOT projects, submit all required information, paper work and forms to the BLP&#039;s Project Development Engineer. &lt;br /&gt;
::Maintain contact with the BLP throughout the project. The BLP Project Manager shall be invited to all progress meetings.&lt;br /&gt;
::The contractor shall maintain a [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/offChiefCoun/CivilRights/pdf/BulletinBoard/Post-ins.pdf &#039;&#039;&#039;Bulletin Board&#039;&#039;&#039;] on the project for the duration of the project. The Project Manager shall ensure the Bulletin Board is maintained using the [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/divAdmin/Documents/CheckList.pdf &#039;&#039;&#039;Bulletin Board Check List&#039;&#039;&#039;].&lt;br /&gt;
::When the project is 20-30% complete, the City shall request Form 239, Field Construction Administrator&#039;s Report, from BLP Project Manager.&lt;br /&gt;
::The Contractor shall provide monthly the Federal-Aid Highway Construction Employment Data Summary - [https://www.ksdot.org/Assets/wwwksdotorg/bureaus/offChiefCoun/Documents/DOTForm1003.pdf &#039;&#039;&#039;KDOT Form 1003&#039;&#039;&#039;] and submit to the City.&lt;br /&gt;
::The Contractor shall provide annually  the Federal-Aid Highway Construction Contractors Annual EEO Report - [https://www.ksdot.org/bureaus/burLocalProj/LPA/lpaindex.asp &#039;&#039;&#039;FHWA Form 1391&#039;&#039;&#039;]. Form shall be submitted with the last full pay period of July.&lt;br /&gt;
:For additional information refer to Section 15.3.2.4.3, Chapter [[Media:15.0 LPA-Administered Procedures 2018.pdf|&#039;&#039;&#039;15.0 LPA-Administered Procedures &#039;&#039;&#039;]] of KDOT&#039;s LPA Project Development Manual.&lt;br /&gt;
*For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure.&lt;br /&gt;
*For KDOT projects, submit monthly Construction Progress Reporting Survey to the US Census Bureau, using [https://www.census.gov/construction/c30/pdf/c700s&amp;amp;l.pdf &#039;&#039;&#039;Form C-700(SL)&#039;&#039;&#039;].&lt;br /&gt;
 &lt;br /&gt;
*Update Project Journal in the Project Database. &lt;br /&gt;
*Receive telephone inquiries and respond accordingly. &lt;br /&gt;
*Handle project correspondence. &lt;br /&gt;
*Prepare/approve payment for material testing. &lt;br /&gt;
*Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
*Conduct final inspection. &lt;br /&gt;
*Approve final Contractor/Consultant payment. &lt;br /&gt;
*Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Progress Meeting Agenda.pdf|No. V-16a|is a sample progress meeting agenda.}}&lt;br /&gt;
{{Exhibit|Progress Meeting Minutes.pdf|No. V-16b|is a sample progress meeting minutes.}}&lt;br /&gt;
:[[Media:Staff Billing Report.pdf|&#039;&#039;&#039;Exhibit No. V-16c&#039;&#039;&#039;]] &#039;&#039;is a sample of a Staff Billing Report to finance.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives, a representative from the City&#039;s Maintenance Division, and a representative from any other funding sources such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
The final inspection for Traffic Engineering related items, e.g. traffic signals, streetlighting, pavement marking and signing and any other traffic related items, is generally conducted separately. The Project Manager shall coordinate with the Traffic Engineering liaison to schedule this final inspection. The inspection party shall include members of the City Design Team, and representatives from the City&#039;s Traffic Maintenance Division. All Traffic Engineering punch list items will be shared with the Project Manager to include with the final &amp;quot;Punch List&amp;quot; sent to the Contractor.&lt;br /&gt;
&lt;br /&gt;
As a result of both inspections, a final “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Punch List.pdf|No. V-17|is a sample “Punch List” for the Contractor to complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
{{Exhibit|V-18a.dot|No. V-18a|is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.}}&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/KDHE_csgp_8-1-2017_NOT.pdf &#039;&#039;&#039;Exhibit No. V-18b&#039;&#039;&#039;]&#039;&#039; is a link to KDHE&#039;s Notice of Termination form.&#039;&#039;&lt;br /&gt;
{{Exhibit|V-18c.dot|No. V-18c|is a sample KDOT Highway Permit release letter.}}&lt;br /&gt;
{{Exhibit|Notice of Termination Packet Signed.pdf|No. V-18d|is an example of a transmittal letter with Notice of Termination enclosed.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall create a Bluebeam session to document minor design changes, change orders and changes made in the field during construction. Subsequent to final inspection, the Consulting Engineer shall prepare &amp;quot;As Constructed Plans&amp;quot; reflecting those changes.&lt;br /&gt;
&lt;br /&gt;
See: [[media:as-built plan process flow chart.pdf|&#039;&#039;&#039;As-Built Plan Process Flow Chart&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall also prepare the Traffic Signal Project Data Sheet and Street Light Project Data Sheet.  The data sheets summarize the traffic signal and street lighting equipment that was installed.  The information for the data sheets can be found on the plans and project submittals submitted by the Contractor.  The data sheets shall then be distributed to the Traffic Engineering Technician for inputting into LUCITY.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-19a.docx|No. V-19a|is a copy of the Traffic Signal Project Data Sheet to be completed by the Project Manager.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-19b.docx|No. V-19b|is a copy of the Street Light Project Data Sheet to be completed by the Project Manager.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection of the sod, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owner&#039;s responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees. Project Manager / Inspector may consider taking photos of the sod to document the condition at the time when letter is sent out. The copy of the letter will be emailed to the following:&lt;br /&gt;
&lt;br /&gt;
Councilmember(s);&lt;br /&gt;
Director of Public Works;&lt;br /&gt;
City Engineer;&lt;br /&gt;
Supervisory Civil Engineer;&lt;br /&gt;
Contractor&#039;s Representative;&lt;br /&gt;
City&#039;s Construction Inspector;&lt;br /&gt;
City Forester.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Sod Maintenance.pdf|No. V-20a|is a sample letter to property owners regarding sod/seed care.}}&lt;br /&gt;
{{Exhibit|Sod Tree Shrub letter.pdf|No. V-20b|is a sample letter to property owners regarding sod and tree/shrub care.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining one signed copy of the &amp;quot;&#039;&#039;&#039;Project Completion Certification&#039;&#039;&#039;&amp;quot; from the Contractor.  To discontinue the Contractor’s Tax Exemption number, the Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-21a Sample Letter with Project Completion Certificate.docx|No. V-21a|is a sample transmittal letter to the Contractor.}}&lt;br /&gt;
&lt;br /&gt;
:[[Media:Project Completion Certificate-sample.pdf|&#039;&#039;&#039;Project Completion Certificate&#039;&#039;&#039;]] &#039;&#039;(sample)&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification and Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Certificate of Engineer.docx|No. V-22a|is a sample “Certificate of Engineer as to Completion” form.}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the Maintenance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Final Acceptance Letter.docx|No. V-22b|is a sample final acceptance letter.}}&lt;br /&gt;
&lt;br /&gt;
The final acceptance letter is to be copied to the following people for inventory updates:&lt;br /&gt;
*Contract Specialist:  For scheduling end of Maintenance Bond meeting;&lt;br /&gt;
*Engineering Technician (Street Engineering Division):  Street network inventory;&lt;br /&gt;
*Engineering Technician (Stormwater Engineering Division):  Storm Sewer inventory and Bar Grate inventory;&lt;br /&gt;
*Engineering Technician (Traffic Division):  Street Light inventory and Traffic Signal inventory;&lt;br /&gt;
*PW MG;&lt;br /&gt;
*Applicable Maintenance Supervisors: Snow routs update;&lt;br /&gt;
*Bridge Inventory Coordinator (if necessary);&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of Maintenance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
*Request the date to be used for the end of the Maintenance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
*Schedule a meeting for 2 months prior to the expiration of the Maintenance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
*This meeting will be scheduled in PW Projects calendar.&lt;br /&gt;
&lt;br /&gt;
{{Note|Maintenance Bond for KDOT projects is a non-participating item.}}&lt;br /&gt;
&lt;br /&gt;
== &#039;&#039;&#039;Task No. 23 - Submit Notice of Acceptance to KDOT&#039;&#039;&#039; ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.16 of [http://www.ksdot.org/bureaus/burConsMain/specprov/2015specprov.asp &#039;&#039;&#039;KDOT Standard Specifications&#039;&#039;&#039;]. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City will submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
{{Exhibit|Completion Letter to KDOT.docx|No. V-23|is a transmittal letter to KDOT regarding completion of project.}}&lt;br /&gt;
{{Exhibit|V-23a.dot|No. V-23a|is a copy of the Notice to Acceptance, City Form V-2398.}}&lt;br /&gt;
{{Exhibit|DBE Payment Affidavit - KDOT Form 270 (2).pdf|No. V-23b|is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.}}&lt;br /&gt;
{{Exhibit|DBE Summary Report.docx|No. V-23c|is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.}}&lt;br /&gt;
{{Exhibit|Breakout of Construction Costs Revised.pdf|No. V-23d|is a sample Final Breakdown of Construction Cost by Participation and Work Type.}}&lt;br /&gt;
&lt;br /&gt;
== &#039;&#039;&#039;Task No. 24 - Submit Material Certification to KDOT&#039;&#039;&#039; ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.07 of [http://www.ksdot.org/burconsmain/Connections/ConstManual/index.asp &#039;&#039;&#039;KDOT’s Construction Manual&#039;&#039;&#039;] and Section 2600 of [http://www.ksdot.org/bureaus/burConsMain/specprov/2015specprov.asp &#039;&#039;&#039;KDOT’s Standard Specifications&#039;&#039;&#039;]. These certifications will verify the Contractor has furnished materials that meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
Material Sampling, testing procedures and materials certification requirements must be followed on all Federal Aid projects. Testing Frequency charts are available on the KDOT website. Materials testing personnel must be properly certified.&lt;br /&gt;
&lt;br /&gt;
See Section 106 of [http://www.ksdot.org/bureaus/burConsMain/specprov/2015specprov.asp &#039;&#039;&#039;KDOT&#039;s Standard Specifications&#039;&#039;&#039;], latest revision,  for information on QC/QA or Verification testing.&lt;br /&gt;
&lt;br /&gt;
Materials testing personnel performing materials tests on Federal Aid projects must be witnessed by KDOT Materials. Mass witnessing events take place in each District on yearly basis. Most consultants already participate. It is the City&#039;s responsibility to contact the local KDOT construction office to inquire about mass witnessing events.&lt;br /&gt;
&lt;br /&gt;
== &#039;&#039;&#039;Task No. 25 - Submit Construction Summary Document to KDOT&#039;&#039;&#039; ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City shall be responsible for submitting the Construction Summary Document to KDOT once the project has been accepted from the Contractor. This document will certify that the activities in the Construction Phase have been completed in accordance with Federal and State laws and regulations as well as KDOT&#039;s Construction Manual. This documents will include a final statement that the contractor has provided appropriate materials certification for the project. The [https://www.ksdot.org/bureaus/burlocalproj/LPA/lpaindex.asp &#039;&#039;&#039;Final Paid Items List (FPIL)&#039;&#039;&#039;] with a breakout of costs by work type (i.e. Common Items, Roadway, Bridge, Traffic Signals) shall be submitted to BLP at this time. This breakdown is similar to the Bid Items List submitted with the Letting Summary Document except it should reflect the actual costs of construction, including all change orders with all non-participating items marked as such. The FPIL will need to be excel and formula-driven, not hard-keyed, in total column.&lt;br /&gt;
&lt;br /&gt;
The Construction Summary Document shall be sent to the Project Development Engineer.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Construction Summary Document form.docx|No. V-25| is a copy of the Construction Summary Document form}}.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|TH-0513 FPIL .xlsx|No. V-25a| is a sample of FPIL}}.&lt;br /&gt;
&lt;br /&gt;
== &#039;&#039;&#039;Task No. 26 - Receive Final Acceptance from KDOT&#039;&#039;&#039; ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City shall complete a “Final Statement of Cost” for submittal to BLP in excel format. At this time a final breakdown costs by work type (i.e. roadway, surfacing, bridges, traffic signals and common items) shall be provided to KDOT, with participating and non-participating items clearly separated. Both the final statement of cost and the breakdown by work type should include all costs associated with the project regardless of funding source with non-participating items marked as such. The City shall notify the local Construction Manager when the Notice of Acceptance is issued and the LCM shall perform a walkthrough of the project.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|Final acceptance form V-2698.docx|No. V-26| is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698}}.&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see [[Phase_V_-_Construction#Task_No._21_-_Receive_Contractor_Project_Completion_Certification|&#039;&#039;&#039;Phase V, Task 21&#039;&#039;&#039;]]), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see [[Phase_V_-_Construction#Task_No._22_-_Project_Completion_Certification_and_Scheduling_of_the_Final_Inspection_Prior_to_Expiration_of_2_Year_Maintenance_Bond|&#039;&#039;&#039;Phase V, Task 22&#039;&#039;&#039;]]). &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-28.pdf|No. V-28| is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release}}.&lt;br /&gt;
&lt;br /&gt;
== [[:Category:Phase V Exhibits|All Phase V Exhibits]] ==&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5569</id>
		<title>Template:PQLReturn</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5569"/>
		<updated>2013-10-02T14:14:45Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Undo revision 5568 by Jnclark (talk)&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;----&lt;br /&gt;
{| width=&amp;quot;800px&amp;quot; border=&amp;quot;0&amp;quot; cellpadding=&amp;quot;4&amp;quot; cellspacing=&amp;quot;0&amp;quot;; border-collapse: collapse;&amp;quot;&lt;br /&gt;
|+&lt;br /&gt;
|align=&amp;quot;left&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80.png|50px|link=#top]]&lt;br /&gt;
| align=&amp;quot;left&amp;quot;|[[#top|&#039;&#039;&#039;Top&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot;|[[Preapproved Materials|&#039;&#039;&#039;Preapproved Materials&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Side arrow 80x66.png|50px|right|link=Preapproved_Materials]]&lt;br /&gt;
|}&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5568</id>
		<title>Template:PQLReturn</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5568"/>
		<updated>2013-10-02T14:13:34Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;----&lt;br /&gt;
{| width=&amp;quot;800px&amp;quot; border=&amp;quot;0&amp;quot; cellpadding=&amp;quot;4&amp;quot; cellspacing=&amp;quot;0&amp;quot;; border-collapse: collapse;&amp;quot;&lt;br /&gt;
|+&lt;br /&gt;
|align=&amp;quot;left&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80 orange.png|50px|link=#top]]&lt;br /&gt;
| align=&amp;quot;left&amp;quot;|[[#top|&#039;&#039;&#039;Top&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot;|[[Preapproved Materials|&#039;&#039;&#039;Preapproved Materials&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Side arrow 80x66.png|50px|right|link=Preapproved_Materials]]&lt;br /&gt;
|}&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_66x80_orange.png&amp;diff=5567</id>
		<title>File:Up arrow 66x80 orange.png</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_66x80_orange.png&amp;diff=5567"/>
		<updated>2013-10-02T14:12:39Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Jnclark uploaded a new version of &amp;amp;quot;File:Up arrow 66x80 orange.png&amp;amp;quot;: orange side arrow&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;orange up arrow 66x80&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_66x80_orange.png&amp;diff=5566</id>
		<title>File:Up arrow 66x80 orange.png</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_66x80_orange.png&amp;diff=5566"/>
		<updated>2013-10-02T14:03:10Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: orange up arrow 66x80&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;orange up arrow 66x80&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5565</id>
		<title>Template:PQLReturn</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5565"/>
		<updated>2013-10-02T13:58:00Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;----&lt;br /&gt;
{| width=&amp;quot;800px&amp;quot; border=&amp;quot;0&amp;quot; cellpadding=&amp;quot;4&amp;quot; cellspacing=&amp;quot;0&amp;quot;; border-collapse: collapse;&amp;quot;&lt;br /&gt;
|+&lt;br /&gt;
|align=&amp;quot;left&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80.png|50px|link=#top]]&lt;br /&gt;
| align=&amp;quot;left&amp;quot;|[[#top|&#039;&#039;&#039;Top&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot;|[[Preapproved Materials|&#039;&#039;&#039;Preapproved Materials&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Side arrow 80x66.png|50px|right|link=Preapproved_Materials]]&lt;br /&gt;
|}&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5564</id>
		<title>Template:PQLReturn</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5564"/>
		<updated>2013-10-02T13:57:17Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;----&lt;br /&gt;
{| width=&amp;quot;800px&amp;quot; border=&amp;quot;0&amp;quot; cellpadding=&amp;quot;4&amp;quot; cellspacing=&amp;quot;0&amp;quot;; border-collapse: collapse;&amp;quot;&lt;br /&gt;
|+&lt;br /&gt;
|align=&amp;quot;left&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:side arrow 80x66.png|50px|link=#top]]&lt;br /&gt;
| align=&amp;quot;left&amp;quot;|[[#top|&#039;&#039;&#039;Top&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot;|[[Preapproved Materials|&#039;&#039;&#039;Preapproved Materials&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80.png|50px|right|link=Preapproved_Materials]]&lt;br /&gt;
|}&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:Side_arrow_80x66.png&amp;diff=5563</id>
		<title>File:Side arrow 80x66.png</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:Side_arrow_80x66.png&amp;diff=5563"/>
		<updated>2013-10-02T13:56:09Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: side arrow 80x66&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;side arrow 80x66&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5561</id>
		<title>Template:PQLReturn</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5561"/>
		<updated>2013-10-02T13:45:05Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;----&lt;br /&gt;
{| width=&amp;quot;800px&amp;quot; border=&amp;quot;0&amp;quot; cellpadding=&amp;quot;4&amp;quot; cellspacing=&amp;quot;0&amp;quot;; border-collapse: collapse;&amp;quot;&lt;br /&gt;
|+&lt;br /&gt;
|align=&amp;quot;left&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80.png|50px|link=#top]]&lt;br /&gt;
| align=&amp;quot;left&amp;quot;|[[#top|&#039;&#039;&#039;Top&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot;|[[Preapproved Materials|&#039;&#039;&#039;Preapproved Materials&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80.png|50px|right|link=Preapproved_Materials]]&lt;br /&gt;
|}&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5560</id>
		<title>Template:PQLReturn</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Template:PQLReturn&amp;diff=5560"/>
		<updated>2013-10-02T13:43:56Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;----&lt;br /&gt;
{| width=&amp;quot;800px&amp;quot; border=&amp;quot;0&amp;quot; cellpadding=&amp;quot;4&amp;quot; cellspacing=&amp;quot;0&amp;quot;; border-collapse: collapse;&amp;quot;&lt;br /&gt;
|+&lt;br /&gt;
|align=&amp;quot;left&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Arrow_Up.png|50px|link=#top]]&lt;br /&gt;
| align=&amp;quot;left&amp;quot;|[[#top|&#039;&#039;&#039;Top&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot;|[[Preapproved Materials|&#039;&#039;&#039;Preapproved Materials&#039;&#039;&#039;]]&lt;br /&gt;
| align=&amp;quot;right&amp;quot; width=&amp;quot;30px&amp;quot;|[[File:Up arrow 66x80.png|50px|right|link=Preapproved_Materials]]&lt;br /&gt;
|}&lt;br /&gt;
----&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_36x44.png&amp;diff=5558</id>
		<title>File:Up arrow 36x44.png</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_36x44.png&amp;diff=5558"/>
		<updated>2013-10-02T13:41:42Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: up arrow 36x44&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;up arrow 36x44&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_66x80.png&amp;diff=5557</id>
		<title>File:Up arrow 66x80.png</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:Up_arrow_66x80.png&amp;diff=5557"/>
		<updated>2013-10-02T13:40:07Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Up arrow&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Up arrow&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_II_-_Preliminary_Design&amp;diff=1346</id>
		<title>Phase II - Preliminary Design</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_II_-_Preliminary_Design&amp;diff=1346"/>
		<updated>2010-07-29T14:43:08Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Undo revision 1344 by Jnclark (Talk)&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|Phase II begins the engineering design and plan preparation process for a project. The date for beginning this process will depend upon the approved project schedule, budget and time anticipated to complete the various phases/tasks.&lt;br /&gt;
&lt;br /&gt;
The project team will play an important decision-making role in managing a project. This team will consist of City staff and private consultants (if applicable).&lt;br /&gt;
&lt;br /&gt;
Intra-department, public involvement, and utility company meetings are commenced during this phase.&lt;br /&gt;
&lt;br /&gt;
Field check plans are prepared, distributed and reviewed along with preliminary construction cost estimates. Also, R/W and easement documents are completed and, if required, appraisers are hired.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Phase II Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase II Check List|Check List]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Identify Project Team ==&lt;br /&gt;
When a project is scheduled to begin the design phase, the Project Team is to be identified by the City Engineer and/or the City Traffic Engineer, depending on the scope of the project. The purpose of this team is to provide input, information, support, and execution throughout the project planning, design, and construction. The Project Team will generally include the following members: Project Manager, Traffic Engineer, Construction Inspector, Traffic Maintenance Technician, Maintenance Representative, Engineering Technician, Contract Specialist, Law Department Representative, and Finance Representative.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Decide if City Staff to Design ==&lt;br /&gt;
The City Engineer and/or the City Traffic Engineer in consultation with the Project Team will decide whether the project will be designed by the City Staff or by a Consulting Engineer.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3-4 - Hire Consultant ==&lt;br /&gt;
{{top}}&lt;br /&gt;
&lt;br /&gt;
MARC&#039;s rules and regulations do not permit federal dollars to be used for project design services. Therefore, Consultant selection certification, to KDOT, is not applicable as long as this MARC rule is in effect.&lt;br /&gt;
 &lt;br /&gt;
{{Note|The flow diagrams included in this Manual will be provided to the Consultant during the negotiating process. When negotiating an agreement with a consulting firm a narrative of services and a fee schedule is required (examples below).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4a.pdf|No. II-3-4a|is City Resolution No. 3506 sets forth the policies and procedures for the selection of Professional Consulting Services.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4b.dot|No. II-3-4b|City’s standard Engineering / Architectural services agreement for design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4b(1).dot|No. II-3-4b(1)|City’s standard Supplemental Agreement for Professional Engineering Services.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4c.dot|No. II-3-4c|City’s standard Consultant Agreement for non-design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4c(1).dot|No. II-3-4c(1)|City’s standard Supplemental Agreement to the Consultant Agreement for non-design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e.dot|No. II-3-4e|City’s standard Scope of Services.}}&lt;br /&gt;
&lt;br /&gt;
:[[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice&#039;&#039;&#039;]] &#039;&#039;is to be used when writing contracts for projects involving bridge construction.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e(1).dot|No. II-3-4e(1)|City’s standard Scope of Services for a Street Lighting project.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e(2).dot|No. II-3-4e(2)|City’s standard Scope of Services for a Traffic Signal project.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4f.xlt|No. II-3-4f|City’s standard fee schedule for engineering services agreement.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4g.dot|No. II-3-4g|is a sample RFP letter to Consulting Firms.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4h.dot|No. II-3-4h|is a sample Ranking Memo to Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4i.xlt|No. II-3-4i|is a sample Ranking Sheet to be completed by the Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4j.dot|No. II-3-4j|is a sample Interview Memo to Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4k.xlt|No. II-3-4k|is a sample of a compiled Ranking Sheet.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4l.dot|No. II-3-4l|is a sample letter requesting interview of short list Consulting Firms.}}&lt;br /&gt;
 &lt;br /&gt;
The selection committee shall meet after ranking sheets are completed and any interviews have been held.  This meeting is to ensure consensus of the selection committee prior to letters being sent to consultants.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4m.dot|No. II-3-4m|is a sample letter to selected Consulting Firm.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4n.dot|No. II-3-4n|is a sample letter to Consulting Firms not selected.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4o.xlt|No. II-3-4o|is a list of Consulting Firms.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Submit Project Description to Law Department ==&lt;br /&gt;
The physical location of the project and a description of what is to be constructed is to be submitted to the Law Department. A feasibility report shall include the physical location of the project, a description of what is to be constructed, a cost estimate, and other necessary information required by the Law Department. The description project centerline shall include the permanent improvements (not tapers for street projects).&lt;br /&gt;
&lt;br /&gt;
An example of a project description is as follows:&lt;br /&gt;
&lt;br /&gt;
:&amp;lt;font color=&amp;quot;green&amp;quot;&amp;gt;&#039;&#039;The reconstruction and widening of certain portions of Nall Avenue from 369 feet south of 119th Street to 135th Street, and the reconstruction and widening of certain portions of 127th Street from Nall Avenue to 500 feet west of Nall Avenue. Construction will include a dual 28 foot roadway with a 24 foot median located in 120 feet of right-of-way, including left turn lanes at required locations, construction of a new bridge on Nall Avenue over Tomahawk Creek, street lighting, storm sewers, a 4 foot concrete sidewalk on one side of the roadway and an 8 foot asphalt sidewalk on the other side of the roadway.&amp;lt;/font&amp;gt;&lt;br /&gt;
&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Prepare Project Schedule ==&lt;br /&gt;
If a Consultant is to be hired, the anticipated construction time period shall be provided. The Consultant shall submit a schedule, using Microsoft Project, indicating the design phases, R/W / easement submittal, meetings, bid opening date and construction time period. If the City Staff is designing the project, a similar schedule shall be prepared by the City Project Manager.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Submit Cash Flow Projections (Engineering Cost) ==&lt;br /&gt;
Subsequent to executing a contract with a Consultant or when the City Staff is selected to provide engineering services, a cash flow projection for engineering services shall be submitted to the City Finance Department.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|II-7.xlt|No. II-7|is the standard cash flow form.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Execute Ordinances-Resolution ==&lt;br /&gt;
The Project Manager, in conjunction with the Law Department, will determine if all necessary City ordinances or resolutions have been executed in order to authorize the project. Examples of possible documents are:&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-8a.dot|No. II-8a| Resolution on advisability of the creation of an Improvement District,}}&lt;br /&gt;
{{Exhibit|II-8b.dot|No. II-8b| Resolution authorizing and providing for the creation of an Improvement District,}}&lt;br /&gt;
{{Exhibit|II-8c.dot|No. II-8c| Ordinance providing for the public improvement of a Main Trafficway}}, and&lt;br /&gt;
*temporary bond financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule First Utility Meeting ==&lt;br /&gt;
Early in the preliminary design phase, the Consultant or Project Manager shall schedule a meeting with all public and private utility officials. A meeting agenda shall be prepared and distributed in advance of the meeting to all scheduled attendees. Meeting minutes shall also be prepared following the meeting and distributed to all scheduled attendees, including those who were invited but did not attend.&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
The purpose of the first utility meeting is as follows:&lt;br /&gt;
&lt;br /&gt;
*obtain utility location maps/information,&lt;br /&gt;
*obtain copies of existing utility easements,&lt;br /&gt;
*present the project schedule,&lt;br /&gt;
*determine if there are critical out-of-service time periods, and&lt;br /&gt;
*confirm utility representative contacts and phone numbers.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9.dot|No. II-9|is a list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9a.dot|No. II-9a|is a copy of the City&#039;s Utility Relocation Guidelines.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9b.dot|No. II-9b|is a sample invitation letter for Utility Coordination Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9c.dot|No. II-9c|sample agenda for Utility Coordination Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9d.dot|No. II-9d|meeting sign in sheet.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9e.dot|No. II-9e|sample of utility coordination meeting minutes.}}&lt;br /&gt;
 &lt;br /&gt;
&#039;&#039;&#039;Johnson County Wastewater&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9f.pdf|No. II-9f|Right-Of-Way Agreement}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9g.pdf|No. II-9g|Right-Of-Way Agreement, Reference Sheet}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9h.pdf|No. II-9h|Right-Of-Way Agreement, Project Checklist}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9i.xlt|No. II-9i|Payment invoice to JCW for reimbursement of relocation costs.}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Water District No.1 of Johnson County&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9j.pdf|No. II-9j|Right-Of -Way Agreement}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Williams Pipe Line&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9k.pdf|No. II-9k|Encroachment Guidelines.}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;KCPL&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9l.pdf|No. II-9l|Governmental Relocation Contact List}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9m.pdf|No. II-9m|Service Territory Map}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Pre-Design Meeting ==&lt;br /&gt;
A pre-design meeting shall be scheduled prior to commencing any significant design work. A meeting agenda shall be prepared and distributed in advance of the meeting to the scheduled attendees. Meeting minutes shall be prepared and distributed to all attendees. The purpose of this meeting is to discuss and resolve as many anticipated design issues as possible as follows:&lt;br /&gt;
&lt;br /&gt;
*specific limits of improvements, &lt;br /&gt;
*median openings and left/right turn storage lengths, &lt;br /&gt;
*detailed schedule, &lt;br /&gt;
*confirmation of appropriate design criteria as described in Task No. 11, &lt;br /&gt;
*determine if the project will need a Land Disturbance Permit (LDP), &lt;br /&gt;
*determine detours/street closings, and &lt;br /&gt;
*project phasing/traffic control, &lt;br /&gt;
*identify equipment or material on critical path, see note below, and &lt;br /&gt;
*distribute City&#039;s Standard Bid Items to be used during design. &lt;br /&gt;
&lt;br /&gt;
{{Note|It may be necessary to purchase equipment or material in advance of actual project letting date. Generally this will involve separate purchasing contracts for signal poles, LED&#039;s, signal cabinets, controllers and load switches. Items on the critical path that could delay the project completion date should be identified and the need for separate purchasing contracts discussed.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Design Criteria ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
*&#039;&#039;&#039;Public and Private Streets&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
:Streets shall be designed in accordance with the following:&lt;br /&gt;
:*Current edition of the &amp;lt;u&amp;gt;A Policy on Geometric Design of Highways and Streets&amp;lt;/u&amp;gt; by the American Association of State Highway and Transportation officials.&lt;br /&gt;
&lt;br /&gt;
:*Current edition of the [http://www.ksdot.org:9080/burConsMain/specprov/2007SSDefault.asp  &amp;lt;u&amp;gt;Standard Specifications for State Road and Bridge Construction for KDOT&amp;lt;/u&amp;gt;.]&lt;br /&gt;
:*Current edition of the Non-NHS Local Road and Street Plan for KDOT.&lt;br /&gt;
:*Current City of Overland Park [http://www.opkansas.org/Overland-Park-Municipal-Code Municipal Code.]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1302-Materials-Material-Tests-and-Inspections Municipal Code Chapter 13.02 Materials, Materials Tests, and Inspections]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1303-Street-Construction-Standards Municipal Code Chapter 13.03 Street Construction Standards]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1305-Street-Lighting Municipal Code Chapter 13.05 Street Lighting]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1308-Sidewalk-Construction-and-Repair Municipal Code Chapter 13.08 Sidewalk Construction and Repair.]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1312-Construction-on-Rights-of-Way Municipal Code Chapter 13.12 Construction on Rights-of-Way.]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1510-Stormwater-Management-Program-Standards-and-Permitting Municipal Code Chapter 15.10 Stormwater Management Program - Standards and Permitting]&lt;br /&gt;
:*Current City of Overland Park Design and Construction Standards [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-1 Volume 1 Design Criteria] and [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-2 Volume 2 Construction Specifications]&lt;br /&gt;
*&#039;&#039;&#039;Stormwater Conveyance and Treatment Facilities&#039;&#039;&#039;&lt;br /&gt;
:Current City of Overland Park Design and Construction Standards [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-1 Volume 1 Design Criteria] and [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-2 Volume 2 Construction Specifications] as a supplement to APWA Section 5600.&lt;br /&gt;
*&#039;&#039;&#039;Erosion and Sediment Control&#039;&#039;&#039;&lt;br /&gt;
:Current City of Overland Park Design and Construction Standards [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-1 Volume 1 Design Criteria] and [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-2 Volume 2 Construction Specifications] as a supplement to APWA Section 5100.&lt;br /&gt;
:For an additional resource refer to [[media:Designing_Erosion_Control_on_a_Thoroughfare_Project_Sept_2007.doc|Designing Erosion Control on a Thoroughfare or Public Works Project]]. This resource provides guidelines on preparing erosion control strategies and plans.&lt;br /&gt;
*&#039;&#039;&#039;Traffic Signals&#039;&#039;&#039;&lt;br /&gt;
:Traffic signals, signing and pavement markings shall be designed in accordance with the latest edition of [http://mutcd.fhwa.dot.gov/pdfs/2009/pdf_index.htm Manual on Uniform Traffic Control Devices].&lt;br /&gt;
*&#039;&#039;&#039;Streetlights&#039;&#039;&#039;&lt;br /&gt;
:Streetlights shall be designed in accordance with [http://apps.opkansas.org/City-Government/Agendas-and-Minutes/Public-Works/Agendas/2007/2007-11-28/DIS-1-2.PDF Resolution No. 2827] and the City’s Streetlighting Design Guide.&lt;br /&gt;
{{Exhibit2|II-11a.dot|No. II-11a|is a two page instructional letter with references regarding the design of street lights.}}&lt;br /&gt;
*&#039;&#039;&#039;Traffic Control&#039;&#039;&#039;&lt;br /&gt;
:Work Zone Traffic Control shall be designed in accordance with the City’s [http://www.opkansas.org/Documents-and-Forms/Detail/Traffic-Control-Handbook Traffic Control Handbook].&lt;br /&gt;
*&#039;&#039;&#039;Bridges&#039;&#039;&#039;&lt;br /&gt;
:City of Overland Park Bridge Design Information&lt;br /&gt;
{{Exhibit2|II-11b.dot|No. II-11b|is a list of bridge design information.}}&lt;br /&gt;
{{Exhibit2|II-11c.pdf|No. II-11c|is Public Works Department Bridge Asset Inventory Procedure (January 2007).}}&lt;br /&gt;
::[[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice.&#039;&#039;&#039;]]&lt;br /&gt;
*&#039;&#039;&#039;Johnson County Wastewater&#039;&#039;&#039;&lt;br /&gt;
{{Exhibit2|II-11d.pdf|No. II-11d|Designers Checklist for City Streets and Stormwater Improvements.}}&lt;br /&gt;
{{Exhibit2|II-11e.pdf|No. II-11e|Memo from JCW on existing brick manholes with new cone sections.}}&lt;br /&gt;
:*For city street or stormwater improvement projects that require sanitary sewer relocation or extension, full sanitary sewer design plans per JCW plan requirements and specifications must be approved by JCW. See below for requirements.&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/ProceduresforPrivatelyFinanced%20GravityMainExtension5-09.pdf Procedures for Privately Financed Gravity Sewer Main Extension]&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/MinimumPlanRequirements4-05.pdf Minimum Plan Requirements for Gravity Sewer Main Extensions]&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/JCWConstandMatSpecsforSS2-24-10.pdf Construction and Material Specifications for Sanitary Sewers] (for recent changes to JCW specifications see [[media:Highlighted_Changes_to_JCW_Specifications.pdf|Highlighted Changes to JCW Specifications 2/24/10]])&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/2010JCWSANITARYSEWERSTANDARDDETAILS.pdf Standard Details].&lt;br /&gt;
:*For the status of sanitary sewer plan submittals and projects see Johnson County Wastewater [http://jcwprojects.jocogov.org/planlist.asp Sewer Project Status] page. &lt;br /&gt;
:*Also see [[#Task No. 9 - Schedule First Utility Meeting | Phase II, Task No. 9]] for Right-Of-Way agreement between JCW and City of Overland Park.&lt;br /&gt;
*&#039;&#039;&#039;Current Johnson County Stormwater Management Program Policy and Procedures&#039;&#039;&#039;&lt;br /&gt;
:See [[Phase_I_-_Vision#Task_3_-_Prepare_SMAC_Project_Addition_Study_.28Form.29 |Phase I, Task No. 3]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - Standard Details ==&lt;br /&gt;
Standard details have been compiled for the City Public Works Department. The standard details can be downloaded from &lt;br /&gt;
&lt;br /&gt;
http://www.opkansas.org/_Bus/Pre-construction_Resources/detaildraw.cfm&lt;br /&gt;
&lt;br /&gt;
If Johnson County Wastewater facilities are involved in the project their [http://www.jcw.org/pdf/forms/engprivatelyfinanced/2010JCWSANITARYSEWERSTANDARDDETAILS.pdf standard details] shall be incorporated into the plans.&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - SMAC Preliminary Study ==&lt;br /&gt;
SMAC Preliminary Study - A preliminary study should be prepared and delivered to Johnson County SMAC officials prior to beginning any design work. &lt;br /&gt;
&lt;br /&gt;
See [[Phase_I_-_Vision#Task_3_-_Prepare_SMAC_Project_Addition_Study_.28Form.29|Phase I, Task No. 3]] for details and checklist for preparing this study.&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - Agency Agreement (if Applicable) ==&lt;br /&gt;
Local government agency agreements should be executed under [[Phase_I_-_Vision#Task_23_-_Execute_Local_Project_Agreement_-_CARS|Phase I, Task No. 23]]. If these agreements were not executed prior to beginning design, execution shall be completed at this time in the preliminary design phase.&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - Conduct Field Surveys ==&lt;br /&gt;
Sufficient and required data necessary for design purposes shall be collected. The field survey shall be in accordance with current accepted and required surveying practices. See City standard Scope of Services in [[#Task_No._3-4_-_Hire_Consultant|Preliminary Design, Task 3-4]] for survey control requirements.&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - Begin Environmental Process ==&lt;br /&gt;
KDOT will control the environmental process task for projects with categorical exclusion. The complexity and effort will depend on each project. The exception would be if an Environmental Assessment or an Environmental Impact Statement is required. In this case, the City or Consultant would perform this task with KDOT and FHWA approval.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-16.xlt|No. II-16|is a spreadsheet KDOT uses in tracking Overland Park administered projects.}}&lt;br /&gt;
&lt;br /&gt;
The Project Engineer shall ensure that all items on the tracking sheet are completed.&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Schedule First Public Information Meeting ==&lt;br /&gt;
Pre-Design - The Consultant/Project Manager shall schedule the first public information meeting. This meeting shall occur prior to beginning preliminary design and field surveys. The purpose of this meeting is to explain the project objectives, present the project schedule, hear the citizen&#039;s concerns and issues, discuss design issues and introduce the involved City Officials and Consultant employees.  For KDOT projects the Notice of Public Information Meeting must be published in the [http://www.kssos.org/pubs/pubs_kansas_register.asp Kansas Register] and [http://sunpublications.com Overland Park Sun.]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Public information invites shall be sent to the following interested parties:&lt;br /&gt;
*Subdivisions adjacent to the project &lt;br /&gt;
*Home Owners Associations adjacent to the project (list of registered HOA available at communications desk)&lt;br /&gt;
*Group Chairperson for [http://www.opkansas.org/Resident-Resources/Conservation-Program Neighborhood Conservation Groups] adjacent to the project. &lt;br /&gt;
::&#039;&#039;For the phone number of the group chairperson, contact the Neighborhood Planner at 913/895-6270.&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
*Council Members of [http://www.opkansas.org/Resource_/PageResource/Maps-And-Stats/Maps/Adobe-Acrobat-PDF-Maps/wards.pdf Ward(s)] adjacent to the project &lt;br /&gt;
*City Manager &lt;br /&gt;
*City Communications Manager &lt;br /&gt;
*Funding Sources (KDOT, CARS, SMAC ...ect) &lt;br /&gt;
*Other City (Olathe, Leawood ...ect) &lt;br /&gt;
*Public Works Management (PWMG) &lt;br /&gt;
*Supervisory Engineer &lt;br /&gt;
*Construction Inspector &lt;br /&gt;
*Consulting Firm &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Property Owner Conversation Log should be used throughout the project to document all conversations with property owners.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.  [http://www.ksdot.org:9080/burTransPlan/pubtrans/Title%20VI%20Brochure%20-%20English.asp&#039;&#039;&#039;Title VI Brochure&#039;&#039;&#039;] regarding equal opportunity contracting are to be made available at all public meetings.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-17.dot|No. II-17|is an example Invitation Letter to property owners.}}&lt;br /&gt;
{{Exhibit|II-17a.dot|No. II-17a|is an example Notice of Public Information Meeting.}}&lt;br /&gt;
{{Exhibit|II-17b.dot|No. II-17b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Exhibit|II-17c.dot|No. II-17c|is a public meeting agenda.}}&lt;br /&gt;
{{Exhibit|II-17d.dot|No. II-17d|is a public meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Begin Title Report Process == &lt;br /&gt;
The Consultant and/or the Project Manager shall prepare an RFP and forward to a minimum of three land title firms. The RFP should include a map or plan indicating the location of the project and the number of tracts of land involved. Proposals will be forwarded to the Project Manager whereby a firm will be selected and an agreement executed. The RFP should request the following information:&lt;br /&gt;
*legal description of the property and copy of recorded deed(s), &lt;br /&gt;
*mailing address of the property owner, &lt;br /&gt;
*all lien holders of record and recorded mortgage(s), &lt;br /&gt;
*all easements of record and copy of recorded document(s), &lt;br /&gt;
*dedicated R/W and copy of recorded document(s), and &lt;br /&gt;
*records of previous condemnations (available in the office of the District Court of Johnson County Kansas, Olathe, Kansas). &lt;br /&gt;
&lt;br /&gt;
In addition, the RFP should provide instructions that all data to be provided in electronic disk format acceptable to the City. Finally the RFP will establish a date for completing the title certification and report. &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-18a.xlt|No. II-18a|is a list of land title companies to be considered in RFP requests.}}&lt;br /&gt;
{{Exhibit|II-18b.dot|No. II-18b|is a sample land title RFP letter.}}&lt;br /&gt;
{{Exhibit|II-18c.pdf|No. II-18c|is a sample location map with parcel numbers and a parcel ownership report.}}&lt;br /&gt;
{{Exhibit|II-18d.dot|No. II-18d|is a sample letter to selected land title company.}}&lt;br /&gt;
{{Exhibit|II-18e.dot|No. II-18e|is a sample letter to land title companies not selected.}}&lt;br /&gt;
{{Exhibit|II-18f.dot|No. II-18f|is a list of common easement holders and mortgage companies for use by title companies in completing title certificates.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Begin Geotechnical Report Process ==&lt;br /&gt;
The Consultant/Project Engineer shall determine what appropriate geotechnical information and data is necessary to adequately design the project.  Drilled shaft foundations for bridges require specialized inspection.  If drilled shaft foundations are anticipated and the Consultant cannot provide this service, use of a subconsultant may be used after receiving written approval from the City.  For projects designed by City Staff an RFP shall be prepared and forwarded to qualified firms. &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-19.dot|No. II-19|is a sample RFP letter to geotechnical firms, proposal format, summary of pay items (Attachment A), detailed description and description of services (Attachment B).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|IV-2a.dot|No. IV-2a|is a list of materials testing / geotechnical service companies.}}&lt;br /&gt;
&lt;br /&gt;
For projects involving bridge construction, [[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice&#039;&#039;&#039;]] is to be used when writing contracts for geotechnical services.&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Prepare Field Check Plans ==&lt;br /&gt;
Plans should be approximately 50 percent complete for field check review including any proposed easement and R/W takings along with a preliminary construction cost estimate and updated project schedule/checklist. The plans shall be stamped &amp;quot;Preliminary—Field Check&amp;quot;.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|I-25b.xlt|No. I-25b|is a project schedule/checklist.}}&lt;br /&gt;
&lt;br /&gt;
See [[media:Blp-memo-03-12.pdf|&#039;&#039;&#039;BLP Memo 03-12 Engineer&#039;s Professional Seal and Signature on Plans.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Distribute Plans ==&lt;br /&gt;
The Consultant/Project Manager shall distribute preliminary plans to all utility company representatives. With this letter, the utility company representatives are advised of the second utility meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-21 is a sample transmittal letter to utility company representatives.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9.dot|No. II-9|is a list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Distribute Plans for Field Check ==&lt;br /&gt;
The Consultant/Project Engineer shall distribute field check plans along with a copy of the project cost estimate and updated project schedule/checklist to the following:&lt;br /&gt;
*all members of the Project Team (see below for Maintenance Division routing), &lt;br /&gt;
*City Engineer, &lt;br /&gt;
*City Traffic Engineer, &lt;br /&gt;
&lt;br /&gt;
BLP for KDOT projects (if applicable), and &lt;br /&gt;
&lt;br /&gt;
other agency participants. &lt;br /&gt;
&lt;br /&gt;
The Project Manager will send one set of plans to the Maintenance Division District in which the project is located. The plans will go to the appropriate functional Supervisor using the Maintenance Plan Review Memo located under the Public Works tab of the General Templates in Microsoft Word. See Maintenance Plan Review Process for more information. &lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see Exhibit No. II-16.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Request for Design Exception to KDOT ==&lt;br /&gt;
The Consultant/Project Manager shall submit in writing to the Chief, Bureau of Local Projects (KDOT) any request for project design exceptions. The letter should list each design exception and fully explain the reason for the design exceptions.&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Schedule Second Utility Meeting ==&lt;br /&gt;
When the Preliminary Plans are distributed to the utility companies, the second utility meeting is scheduled. An agenda shall accompany the letter and meeting minutes prepared and distributed.&lt;br /&gt;
Note:  In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.&lt;br /&gt;
&lt;br /&gt;
The purpose of the second utility meeting is as follows:&lt;br /&gt;
*check accuracy of utility locations on plans, &lt;br /&gt;
*establish what utilities need to be relocated, &lt;br /&gt;
*establish timetable for accomplishing the relocations, and &lt;br /&gt;
*re-confirm utility representative contacts. &lt;br /&gt;
&lt;br /&gt;
See [[#Task No. 9 - Schedule First Utility Meeting|Phase II, Task No. 9 for exhibits.]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Required Permit Applications ==&lt;br /&gt;
The Consultant/Project Manager shall determine what permits will be required in order to construct the project. The following is a list of possible permits required:&lt;br /&gt;
 &lt;br /&gt;
*City of Overland Park Floodplain Development Permit - necessary for any work in a FEMA floodplain, including areas that will be FEMA floodplain once Johnson County Watershed studies are adopted.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25a.pdf|No. II-25a|is a memo of the steps to be taken on Public Works projects.}}&lt;br /&gt;
{{Exhibit|II-25b.pdf|No. II-25b|is an application and submittal checklist for Floodplain Development Permit.}}&lt;br /&gt;
{{Exhibit|II-25b-1.pdf|No. II-25b-1|is FEMA&#039;s Procedures for &amp;quot;No Rise&amp;quot; Certifications.}}&lt;br /&gt;
&lt;br /&gt;
*City of Overland Park Land Disturbance Permit (LDP) - necessary for any work disturbing more than 1 acre total. ([http://www.kdheks.gov/ KDHE] permit also required, see below).&lt;br /&gt;
&lt;br /&gt;
*Land Disturbance Permit and Erosion and Sediment Control Process is a memo of the steps to be taken on public works projects.&lt;br /&gt;
&lt;br /&gt;
:[http://www.opkansas.org/Documents-and-Forms/Detail/Land-Disturbance-Site-Development-Permit-Application &#039;&#039;&#039;Exhibit No. II-25d&#039;&#039;&#039;] &#039;&#039;is an application for LDP.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
*Permit to Construct-Obstruction in streams from [http://www.ksda.gov/dwr/ State Board of Agriculture - Division of Water Resources] - necessary for any work on a stream with more than 240 acres tributary drainage (some exceptions).   http://www.ksda.gov&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25e.pdf|No. II-25e|is DWR application for permit for Obstruction in Streams.}}&lt;br /&gt;
&lt;br /&gt;
*State of Kansas - Environmental Coordination Act (ECA) - approvals letters from various state agencies are typically required for Stream Obstructions permits and sometimes others.  Contacting these agencies directly for their approval letter can accelerate permitting.  http://www.ksda.gov&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25f.dot|No. II-25f| is a listing of contact information and addresses for the ECA agencies (current Dec 2004, see KSDA website above for updated lists).}}  &lt;br /&gt;
&lt;br /&gt;
*NPDES NOI Permit — Notice of Intent for stormwater discharges associated with construction activity. KDHE - Bureau of Water, Industrial Programs Section. - necessary for any work disturbing more than 1 acre total.  (City of OP LDP also required, see above).   http://www.kdhe.state.ks.us/stormwater&lt;br /&gt;
&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/NOI.pdf &#039;&#039;&#039;Exhibit No. II-25g&#039;&#039;&#039;] &#039;&#039;is a NPDES NOI Permit application.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/General_Permit.pdf &#039;&#039;&#039;Exhibit No. II-25h&#039;&#039;&#039;] &#039;&#039;is a copy of the State of Kansas NPDES General Permit for construction. A copy of this permit must be kept onsite during construction, along with the rest of the Stormwater Pollution Prevention Plan &amp;quot;SWPPP&amp;quot;.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
[[media:Plugging_packet.pdf|Plugging Packet]] is a handout detailing KDHE&#039;s requirements for plugging abandoned water wells.&lt;br /&gt;
&lt;br /&gt;
*Corps of Engineers 404 Permit - necessary for any work located within a &amp;quot;water of the United States&amp;quot;, including wetlands.  http://www.nwk.usace.army.mil/regulatory/regulatory.htm&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25i.pdf|No. II-25i|is a sample letter requesting a project be reviewed for nationwide permit coverage. (Visit [http://www.usace.army.mil/Pages/default.aspx COE website] for latest forms and instructions if an individual permit is needed).}}&lt;br /&gt;
&lt;br /&gt;
*FEMA Conditional and Final Letters of Map Revision - required for certain type of major work in the floodplain, as coordinated with the floodplain administrator (see City of OP Floodplain Development Permit, above) - Obtain latest permit forms and guidance from website.  http://www.fema.gov/plan/prevent/fhm/fmc_fmrp.shtm&lt;br /&gt;
&lt;br /&gt;
*KDOT Highway Permits - necessary for construction or utility relocation within KDOT Right of Way.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25j.pdf|No. II-25j|is KDOT Form 304, Highway Permit Agreement Use of Right of Way.}}&lt;br /&gt;
{{Exhibit|II-25k.dot|No. II-25k|is KDOT Form 308, Cased Utility Line Waiver.}}&lt;br /&gt;
{{Exhibit|II-25l.dot|No. II-25l|is KDOT Form 309, Highway Permit for Highway Access.}}&lt;br /&gt;
{{Exhibit|II-25m.pdf|No. II-25m|is KDOT Form 310, Highway Permit Agreement Attachments to Bridges and Other Structures.}}&lt;br /&gt;
{{Exhibit|II-25n.dot|No. II-25n|is KDOT Form 334, Access Application Information Sheet.}}&lt;br /&gt;
{{Exhibit|II-25o.pdf|No. II-25o|is instructions on preparation of KDOT Forms 304, 308, 309 and 334.}}&lt;br /&gt;
&lt;br /&gt;
See [http://www.ksdot.org/burconsmain/connections/uap2007.pdf 2007 KDOT Utility Accommodation Policy] for additional information.&lt;br /&gt;
&lt;br /&gt;
See [[media:Blp-memo-10-08.pdf|&#039;&#039;&#039;BLP Memo 10-08&#039;&#039;&#039;]], All project related state and/or federal permits must be submitted and [http://www.ksdot.org:9080/burlocalproj/Forms/1307.pdf &#039;&#039;&#039;Form 1307&#039;&#039;&#039;] completed prior to submittal of final check plans.&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Prepare Preliminary Cost Estimate (update) ==&lt;br /&gt;
The Consultant/Project Manager shall prepare and submit an updated preliminary construction cost estimate. The form for this estimate shall resemble the Bid form with the item description, unit, approximate quantity, unit price and total. KDOT-BLP should receive a copy of this estimate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Prepare Preliminary Cash Flow Projection (update) ==&lt;br /&gt;
The Consultant/Project Manager shall prepare a preliminary cash flow projection, including construction costs, and submit it to the City Finance Department on the standard form, see [[media:II-7.xlt|&#039;&#039;&#039;Exhibit No. II-7&#039;&#039;&#039;.]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Begin Field Check Plan Review ==&lt;br /&gt;
The persons [[#Task No. 22 - Distribute Plans for Field Check|(see Task No. 22)]] who receive field check plans shall commence plan review. The review shall be completed prior to the scheduled Field Check meeting.&lt;br /&gt;
 &lt;br /&gt;
If applicable, begin [[media:Electrical_Service_Address_Procedures_-_Preliminary_Plans_-_Task_28.pdf|Electrical Service Address Procedures]] for street lighting controllers, traffic signal controllers, electrical control centers for Parks and Recreation irrigation controllers, flood warning or road weather information systems.&lt;br /&gt;
&lt;br /&gt;
See [[media:Exhibit_G_KCP%26L_Electrical_Service_Application.pdf|Exhibit G for KCP&amp;amp;L Commercial &amp;amp; Industrial Electrical Service Application.]] &lt;br /&gt;
&lt;br /&gt;
See [[media:Sample_Letter_to_KCP%26L_Requesting_Power_-_Preliminary_Plans_-_Task_28.pdf|sample letter]] to KCP&amp;amp;L requesting power service.&lt;br /&gt;
&lt;br /&gt;
== Task No. 29 - Schedule Field Check Meeting ==&lt;br /&gt;
The Project Manager shall schedule the Field Check meeting. Representatives of all funding sources are to be invited. The City Engineer/City Traffic Engineer or their designated representatives will attend all meetings.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9d.dot|No. II-9d|is a meeting sign in sheet.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 30 - Execute Official Agreement with KDOT ==&lt;br /&gt;
When the official KDOT agreement is received by the Project Manager, it is reviewed/approved by the Law Department and placed on the City Council agenda for consideration.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-30.pdf|No. II-30|is a sample of KDOT&#039;s official 2007 KDOT Utility Accommodation Policy/Agreement.}}&lt;br /&gt;
{{Exhibit|II-30a.dot|No. II-30a|is a sample Resolution to be used when KDOT&#039;s City/State Agreement is sent to Council for approval.  The Resolution number is to be obtained from the City Clerks office.}}&lt;br /&gt;
&lt;br /&gt;
Compliance with KDOT&#039;s Non-Descrimination policies are required on all contracts. See [[media:Title VI Handbook.pdf|Title VI Handbook]] for more information.&lt;br /&gt;
&lt;br /&gt;
== Task No. 31 - Obtain Decision for Design Exception from KDOT ==&lt;br /&gt;
The Project Manager shall keep in close contact with BLP-KDOT, if a design exception was requested. The results shall be disseminated to all interested and required parties.&lt;br /&gt;
&lt;br /&gt;
== Task No. 32 - Submit R/W Plans/Legal Descriptions ==&lt;br /&gt;
The Consultant/Project Manager shall submit this information on the date as established with the project schedule. The legal descriptions shall be provided in electronic format along with a written original sealed by a registered land surveyor in the State of Kansas. A tract map for each property shall accompany the legal descriptions. The tract map shall clearly identify each type of proposed taking. Also included with the submittal shall be a copy of all the title company information.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-32.pdf|No. II-32|is an example of legal descriptions and tract map.}}&lt;br /&gt;
{{Exhibit|II-32a.pdf|No. II-32a|and}}&lt;br /&gt;
{{Exhibit|II-32b.pdf|No. II-32b|is a Memorandum from the Register of Deeds, Johnson County, regarding legal description format.}}&lt;br /&gt;
{{Exhibit|II-32c.pdf|No. II-32c|is a Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents. All prepared documents must conform to the Register of Deeds requirements.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|In some instances Long Term Temporary Construction Easement have been granted to the City during the development process. These existing Temporary Construction Easements are usually adjacent to thoroughfares. During the R/W Plan review the project technician is to check for any previously granted Long Term Temporary Construction Easements adjacent to the project. The easements are stored in K:\Maps\Plats\long term tce pdfs and can be identified by the plat map number.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 33 - Hire Appraiser ==&lt;br /&gt;
The Project Manager shall request RFP&#039;s from qualified appraisers. Subsequent to receiving the proposals, the Project Manager shall evaluate the proposals and make recommendations in accordance with City Policy.  If federal funding is involved the Project Manager shall form a Selection Committee and a qualification based selection process shall be used.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|II-33a.dot|No. II-33a|is a list of City qualified appraisers.}}&lt;br /&gt;
{{Exhibit|II-33b.dot|No. II-33b|is a copy of City&#039;s Request for Proposal (RFP) letter.}}&lt;br /&gt;
{{Exhibit|II-33c.xlt|No. II-33c|is a  list of the project right-of-way takings.}}&lt;br /&gt;
{{Exhibit|II-33d.dot|No. II-33d|is a copy of Appraiser Agreement for fee under $10,000.}}&lt;br /&gt;
{{Exhibit|II-33e.dot|No. II-33e|is a copy of Appraiser Agreement for fee over $10,000.}}&lt;br /&gt;
{{Exhibit|II-33f.dot|No. II-33f|is a sample Intra City memorandum to the Selection Committee with proposals from appraisers and ranking sheet.}}&lt;br /&gt;
{{Exhibit|II-33g.dot|No. II-33g|is a sample Intra City memorandum to the Selection Committee with staff recommendations.}}&lt;br /&gt;
&lt;br /&gt;
See FHWA&#039;s Real Estate Acquisition Guide For Local Public Agencies for information that will be necessary when a project is started that requires the acquisition of real estate and receives any Federal funding.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-33h.dot|No. II-33h|is a copy of Appraisal Review form.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 34 - Prepare R/W and Easement Documents ==&lt;br /&gt;
The Project Manager will coordinate the preparation of the various documents necessary for the takings required to construct the project.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-34a.dot|No. II-34a| - Access Easement - Option 1}}&lt;br /&gt;
{{Exhibit|II-34b.dot|No. II-34b| - Access Easement - Option 2}}&lt;br /&gt;
{{Exhibit|II-34c.dot|No. II-34c| - Permanent Maintenance Access Easement}}&lt;br /&gt;
{{Exhibit|II-34d.dot|No. II-34d| - Construction Easement}}&lt;br /&gt;
{{Exhibit|II-34e.dot|No. II-34e| - Deed of Dedication}}&lt;br /&gt;
{{Exhibit|II-34f.dot|No. II-34f| - Kansas Warranty Deed}}&lt;br /&gt;
{{Exhibit|II-34g.dot|No. II-34g| - Quit Claim Deed}}&lt;br /&gt;
{{Exhibit|II-34h.dot|No. II-34h| - Real Estate Mortgage Release - Individual}}&lt;br /&gt;
{{Exhibit|II-34i.dot|No. II-34i| - Real Estate Mortgage Release - Corporation}}&lt;br /&gt;
{{Exhibit|II-34j.dot|No. II-34j| - Permanent Drainage Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34k.dot|No. II-34k| - Permanent Drainage Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34l.dot|No. II-34l| - Permanent Drainage Easement - City Grantor &amp;amp; City Grantee}}&lt;br /&gt;
{{Exhibit|II-34m.dot|No. II-34m| - Permanent Right of Way Easement}}&lt;br /&gt;
{{Exhibit|II-34n.dot|No. II-34n| - Retaining Wall Easement}}&lt;br /&gt;
{{Exhibit|II-34o.dot|No. II-34o| - Sidewalk Easement}}&lt;br /&gt;
{{Exhibit|II-34p.dot|No. II-34p| - Sidewalk Variance}}&lt;br /&gt;
{{Exhibit|II-34q.dot|No. II-34q| - Temporary Construction Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34r.dot|No. II-34r| - Temporary Construction Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34s.dot|No. II-34s| - Temporary Construction Easement - Grading Version 1}}&lt;br /&gt;
{{Exhibit|II-34t.dot|No. II-34t| - Temporary Construction Easement - Grading Version 2}}&lt;br /&gt;
{{Exhibit|II-34u.dot|No. II-34u| - Notice of Termination of Temporary Construction Easement}}&lt;br /&gt;
{{Exhibit|II-34v.dot|No. II-34v| - Traffic Signal Easement}}&lt;br /&gt;
{{Exhibit|II-34vv.dot|No. II-34vv| - Street Light Easement}}&lt;br /&gt;
{{Exhibit|II-34w.dot|No. II-34w| - Utility Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34x.dot|No. II-34x| - Utility Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34y.dot|No. II-34y| - Utility Easement - City Grantor &amp;amp; City Grantee}}&lt;br /&gt;
{{Exhibit|II-34z.dot|No. II-34z| - Right of Way Purchase Contract - Johnson County Public Works}}&lt;br /&gt;
{{Exhibit|II-34zz.dot|No. II-34zz| - Easement Acquisition Agreement - City of Overland Park}}&lt;br /&gt;
{{Exhibit|II-32a.pdf|No. II-32a|and}}  &lt;br /&gt;
{{Exhibit|II-32b.pdf|No. II-32b|is a Memorandum from the Register of Deeds, Johnson County, regarding legal description format.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-32c.pdf|No. II-32c|is a Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents. All prepared documents must conform to the Register of Deeds requirements.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 35 - Schedule Second Public Information Meeting ==&lt;br /&gt;
The purpose of this meeting is to present the preliminary plans to the citizens. For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun. See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-35.dot|No. II-35|is an example Invitation Letter to property owners.}}&lt;br /&gt;
{{Exhibit|II-35a.dot|No. II-35a|is an example Notice of Public Information Meeting.}}&lt;br /&gt;
{{Exhibit|II-35b.dot|No. II-35b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Exhibit|II-35c.dot|No. II-35c|is a public meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.  [http://www.ksdot.org:9080/burTransPlan/pubtrans/Title%20VI%20Brochure%20-%20English.asp&#039;&#039;&#039;Title VI Brochure&#039;&#039;&#039;] regarding equal opportunity contracting are to be made available at all public meetings.&lt;br /&gt;
}}&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:II-3-4c.dot&amp;diff=1345</id>
		<title>File:II-3-4c.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:II-3-4c.dot&amp;diff=1345"/>
		<updated>2010-07-29T14:38:50Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: uploaded a new version of &amp;quot;File:II-3-4c.dot&amp;quot;:&amp;amp;#32;Exhibit ii-3-4c&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Std. Consultant Agreement for non-design projects&lt;br /&gt;
[[Category:Phase II Exhibits]]&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_II_-_Preliminary_Design&amp;diff=1344</id>
		<title>Phase II - Preliminary Design</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_II_-_Preliminary_Design&amp;diff=1344"/>
		<updated>2010-07-29T14:25:07Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 3-4 - Hire Consultant */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|Phase II begins the engineering design and plan preparation process for a project. The date for beginning this process will depend upon the approved project schedule, budget and time anticipated to complete the various phases/tasks.&lt;br /&gt;
&lt;br /&gt;
The project team will play an important decision-making role in managing a project. This team will consist of City staff and private consultants (if applicable).&lt;br /&gt;
&lt;br /&gt;
Intra-department, public involvement, and utility company meetings are commenced during this phase.&lt;br /&gt;
&lt;br /&gt;
Field check plans are prepared, distributed and reviewed along with preliminary construction cost estimates. Also, R/W and easement documents are completed and, if required, appraisers are hired.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Phase II Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase II Check List|Check List]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Identify Project Team ==&lt;br /&gt;
When a project is scheduled to begin the design phase, the Project Team is to be identified by the City Engineer and/or the City Traffic Engineer, depending on the scope of the project. The purpose of this team is to provide input, information, support, and execution throughout the project planning, design, and construction. The Project Team will generally include the following members: Project Manager, Traffic Engineer, Construction Inspector, Traffic Maintenance Technician, Maintenance Representative, Engineering Technician, Contract Specialist, Law Department Representative, and Finance Representative.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Decide if City Staff to Design ==&lt;br /&gt;
The City Engineer and/or the City Traffic Engineer in consultation with the Project Team will decide whether the project will be designed by the City Staff or by a Consulting Engineer.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3-4 - Hire Consultant ==&lt;br /&gt;
{{top}}&lt;br /&gt;
&lt;br /&gt;
MARC&#039;s rules and regulations do not permit federal dollars to be used for project design services. Therefore, Consultant selection certification, to KDOT, is not applicable as long as this MARC rule is in effect.&lt;br /&gt;
 &lt;br /&gt;
{{Note|The flow diagrams included in this Manual will be provided to the Consultant during the negotiating process. When negotiating an agreement with a consulting firm a narrative of services and a fee schedule is required (examples below).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4a.pdf|No. II-3-4a|is City Resolution No. 3506 sets forth the policies and procedures for the selection of Professional Consulting Services.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4b.dot|No. II-3-4b|City’s standard Engineering / Architectural services agreement for design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4b(1).dot|No. II-3-4b(1)|City’s standard Supplemental Agreement for Professional Engineering Services.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4c.dot|II-3-4c.dot|No. II-3-4c|City’s standard Consultant Agreement for non-design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4c(1).dot|No. II-3-4c(1)|City’s standard Supplemental Agreement to the Consultant Agreement for non-design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e.dot|No. II-3-4e|City’s standard Scope of Services.}}&lt;br /&gt;
&lt;br /&gt;
:[[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice&#039;&#039;&#039;]] &#039;&#039;is to be used when writing contracts for projects involving bridge construction.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e(1).dot|No. II-3-4e(1)|City’s standard Scope of Services for a Street Lighting project.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e(2).dot|No. II-3-4e(2)|City’s standard Scope of Services for a Traffic Signal project.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4f.xlt|No. II-3-4f|City’s standard fee schedule for engineering services agreement.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4g.dot|No. II-3-4g|is a sample RFP letter to Consulting Firms.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4h.dot|No. II-3-4h|is a sample Ranking Memo to Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4i.xlt|No. II-3-4i|is a sample Ranking Sheet to be completed by the Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4j.dot|No. II-3-4j|is a sample Interview Memo to Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4k.xlt|No. II-3-4k|is a sample of a compiled Ranking Sheet.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4l.dot|No. II-3-4l|is a sample letter requesting interview of short list Consulting Firms.}}&lt;br /&gt;
 &lt;br /&gt;
The selection committee shall meet after ranking sheets are completed and any interviews have been held.  This meeting is to ensure consensus of the selection committee prior to letters being sent to consultants.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4m.dot|No. II-3-4m|is a sample letter to selected Consulting Firm.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4n.dot|No. II-3-4n|is a sample letter to Consulting Firms not selected.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4o.xlt|No. II-3-4o|is a list of Consulting Firms.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Submit Project Description to Law Department ==&lt;br /&gt;
The physical location of the project and a description of what is to be constructed is to be submitted to the Law Department. A feasibility report shall include the physical location of the project, a description of what is to be constructed, a cost estimate, and other necessary information required by the Law Department. The description project centerline shall include the permanent improvements (not tapers for street projects).&lt;br /&gt;
&lt;br /&gt;
An example of a project description is as follows:&lt;br /&gt;
&lt;br /&gt;
:&amp;lt;font color=&amp;quot;green&amp;quot;&amp;gt;&#039;&#039;The reconstruction and widening of certain portions of Nall Avenue from 369 feet south of 119th Street to 135th Street, and the reconstruction and widening of certain portions of 127th Street from Nall Avenue to 500 feet west of Nall Avenue. Construction will include a dual 28 foot roadway with a 24 foot median located in 120 feet of right-of-way, including left turn lanes at required locations, construction of a new bridge on Nall Avenue over Tomahawk Creek, street lighting, storm sewers, a 4 foot concrete sidewalk on one side of the roadway and an 8 foot asphalt sidewalk on the other side of the roadway.&amp;lt;/font&amp;gt;&lt;br /&gt;
&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Prepare Project Schedule ==&lt;br /&gt;
If a Consultant is to be hired, the anticipated construction time period shall be provided. The Consultant shall submit a schedule, using Microsoft Project, indicating the design phases, R/W / easement submittal, meetings, bid opening date and construction time period. If the City Staff is designing the project, a similar schedule shall be prepared by the City Project Manager.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Submit Cash Flow Projections (Engineering Cost) ==&lt;br /&gt;
Subsequent to executing a contract with a Consultant or when the City Staff is selected to provide engineering services, a cash flow projection for engineering services shall be submitted to the City Finance Department.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|II-7.xlt|No. II-7|is the standard cash flow form.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Execute Ordinances-Resolution ==&lt;br /&gt;
The Project Manager, in conjunction with the Law Department, will determine if all necessary City ordinances or resolutions have been executed in order to authorize the project. Examples of possible documents are:&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-8a.dot|No. II-8a| Resolution on advisability of the creation of an Improvement District,}}&lt;br /&gt;
{{Exhibit|II-8b.dot|No. II-8b| Resolution authorizing and providing for the creation of an Improvement District,}}&lt;br /&gt;
{{Exhibit|II-8c.dot|No. II-8c| Ordinance providing for the public improvement of a Main Trafficway}}, and&lt;br /&gt;
*temporary bond financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule First Utility Meeting ==&lt;br /&gt;
Early in the preliminary design phase, the Consultant or Project Manager shall schedule a meeting with all public and private utility officials. A meeting agenda shall be prepared and distributed in advance of the meeting to all scheduled attendees. Meeting minutes shall also be prepared following the meeting and distributed to all scheduled attendees, including those who were invited but did not attend.&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
The purpose of the first utility meeting is as follows:&lt;br /&gt;
&lt;br /&gt;
*obtain utility location maps/information,&lt;br /&gt;
*obtain copies of existing utility easements,&lt;br /&gt;
*present the project schedule,&lt;br /&gt;
*determine if there are critical out-of-service time periods, and&lt;br /&gt;
*confirm utility representative contacts and phone numbers.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9.dot|No. II-9|is a list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9a.dot|No. II-9a|is a copy of the City&#039;s Utility Relocation Guidelines.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9b.dot|No. II-9b|is a sample invitation letter for Utility Coordination Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9c.dot|No. II-9c|sample agenda for Utility Coordination Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9d.dot|No. II-9d|meeting sign in sheet.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9e.dot|No. II-9e|sample of utility coordination meeting minutes.}}&lt;br /&gt;
 &lt;br /&gt;
&#039;&#039;&#039;Johnson County Wastewater&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9f.pdf|No. II-9f|Right-Of-Way Agreement}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9g.pdf|No. II-9g|Right-Of-Way Agreement, Reference Sheet}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9h.pdf|No. II-9h|Right-Of-Way Agreement, Project Checklist}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9i.xlt|No. II-9i|Payment invoice to JCW for reimbursement of relocation costs.}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Water District No.1 of Johnson County&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9j.pdf|No. II-9j|Right-Of -Way Agreement}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Williams Pipe Line&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9k.pdf|No. II-9k|Encroachment Guidelines.}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;KCPL&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9l.pdf|No. II-9l|Governmental Relocation Contact List}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9m.pdf|No. II-9m|Service Territory Map}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Pre-Design Meeting ==&lt;br /&gt;
A pre-design meeting shall be scheduled prior to commencing any significant design work. A meeting agenda shall be prepared and distributed in advance of the meeting to the scheduled attendees. Meeting minutes shall be prepared and distributed to all attendees. The purpose of this meeting is to discuss and resolve as many anticipated design issues as possible as follows:&lt;br /&gt;
&lt;br /&gt;
*specific limits of improvements, &lt;br /&gt;
*median openings and left/right turn storage lengths, &lt;br /&gt;
*detailed schedule, &lt;br /&gt;
*confirmation of appropriate design criteria as described in Task No. 11, &lt;br /&gt;
*determine if the project will need a Land Disturbance Permit (LDP), &lt;br /&gt;
*determine detours/street closings, and &lt;br /&gt;
*project phasing/traffic control, &lt;br /&gt;
*identify equipment or material on critical path, see note below, and &lt;br /&gt;
*distribute City&#039;s Standard Bid Items to be used during design. &lt;br /&gt;
&lt;br /&gt;
{{Note|It may be necessary to purchase equipment or material in advance of actual project letting date. Generally this will involve separate purchasing contracts for signal poles, LED&#039;s, signal cabinets, controllers and load switches. Items on the critical path that could delay the project completion date should be identified and the need for separate purchasing contracts discussed.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Design Criteria ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
*&#039;&#039;&#039;Public and Private Streets&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
:Streets shall be designed in accordance with the following:&lt;br /&gt;
:*Current edition of the &amp;lt;u&amp;gt;A Policy on Geometric Design of Highways and Streets&amp;lt;/u&amp;gt; by the American Association of State Highway and Transportation officials.&lt;br /&gt;
&lt;br /&gt;
:*Current edition of the [http://www.ksdot.org:9080/burConsMain/specprov/2007SSDefault.asp  &amp;lt;u&amp;gt;Standard Specifications for State Road and Bridge Construction for KDOT&amp;lt;/u&amp;gt;.]&lt;br /&gt;
:*Current edition of the Non-NHS Local Road and Street Plan for KDOT.&lt;br /&gt;
:*Current City of Overland Park [http://www.opkansas.org/Overland-Park-Municipal-Code Municipal Code.]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1302-Materials-Material-Tests-and-Inspections Municipal Code Chapter 13.02 Materials, Materials Tests, and Inspections]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1303-Street-Construction-Standards Municipal Code Chapter 13.03 Street Construction Standards]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1305-Street-Lighting Municipal Code Chapter 13.05 Street Lighting]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1308-Sidewalk-Construction-and-Repair Municipal Code Chapter 13.08 Sidewalk Construction and Repair.]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1312-Construction-on-Rights-of-Way Municipal Code Chapter 13.12 Construction on Rights-of-Way.]&lt;br /&gt;
::*[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1510-Stormwater-Management-Program-Standards-and-Permitting Municipal Code Chapter 15.10 Stormwater Management Program - Standards and Permitting]&lt;br /&gt;
:*Current City of Overland Park Design and Construction Standards [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-1 Volume 1 Design Criteria] and [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-2 Volume 2 Construction Specifications]&lt;br /&gt;
*&#039;&#039;&#039;Stormwater Conveyance and Treatment Facilities&#039;&#039;&#039;&lt;br /&gt;
:Current City of Overland Park Design and Construction Standards [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-1 Volume 1 Design Criteria] and [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-2 Volume 2 Construction Specifications] as a supplement to APWA Section 5600.&lt;br /&gt;
*&#039;&#039;&#039;Erosion and Sediment Control&#039;&#039;&#039;&lt;br /&gt;
:Current City of Overland Park Design and Construction Standards [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-1 Volume 1 Design Criteria] and [http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.pdf?documentId=Design-And-Construction-Standards-Vol-2 Volume 2 Construction Specifications] as a supplement to APWA Section 5100.&lt;br /&gt;
:For an additional resource refer to [[media:Designing_Erosion_Control_on_a_Thoroughfare_Project_Sept_2007.doc|Designing Erosion Control on a Thoroughfare or Public Works Project]]. This resource provides guidelines on preparing erosion control strategies and plans.&lt;br /&gt;
*&#039;&#039;&#039;Traffic Signals&#039;&#039;&#039;&lt;br /&gt;
:Traffic signals, signing and pavement markings shall be designed in accordance with the latest edition of [http://mutcd.fhwa.dot.gov/pdfs/2009/pdf_index.htm Manual on Uniform Traffic Control Devices].&lt;br /&gt;
*&#039;&#039;&#039;Streetlights&#039;&#039;&#039;&lt;br /&gt;
:Streetlights shall be designed in accordance with [http://apps.opkansas.org/City-Government/Agendas-and-Minutes/Public-Works/Agendas/2007/2007-11-28/DIS-1-2.PDF Resolution No. 2827] and the City’s Streetlighting Design Guide.&lt;br /&gt;
{{Exhibit2|II-11a.dot|No. II-11a|is a two page instructional letter with references regarding the design of street lights.}}&lt;br /&gt;
*&#039;&#039;&#039;Traffic Control&#039;&#039;&#039;&lt;br /&gt;
:Work Zone Traffic Control shall be designed in accordance with the City’s [http://www.opkansas.org/Documents-and-Forms/Detail/Traffic-Control-Handbook Traffic Control Handbook].&lt;br /&gt;
*&#039;&#039;&#039;Bridges&#039;&#039;&#039;&lt;br /&gt;
:City of Overland Park Bridge Design Information&lt;br /&gt;
{{Exhibit2|II-11b.dot|No. II-11b|is a list of bridge design information.}}&lt;br /&gt;
{{Exhibit2|II-11c.pdf|No. II-11c|is Public Works Department Bridge Asset Inventory Procedure (January 2007).}}&lt;br /&gt;
::[[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice.&#039;&#039;&#039;]]&lt;br /&gt;
*&#039;&#039;&#039;Johnson County Wastewater&#039;&#039;&#039;&lt;br /&gt;
{{Exhibit2|II-11d.pdf|No. II-11d|Designers Checklist for City Streets and Stormwater Improvements.}}&lt;br /&gt;
{{Exhibit2|II-11e.pdf|No. II-11e|Memo from JCW on existing brick manholes with new cone sections.}}&lt;br /&gt;
:*For city street or stormwater improvement projects that require sanitary sewer relocation or extension, full sanitary sewer design plans per JCW plan requirements and specifications must be approved by JCW. See below for requirements.&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/ProceduresforPrivatelyFinanced%20GravityMainExtension5-09.pdf Procedures for Privately Financed Gravity Sewer Main Extension]&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/MinimumPlanRequirements4-05.pdf Minimum Plan Requirements for Gravity Sewer Main Extensions]&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/JCWConstandMatSpecsforSS2-24-10.pdf Construction and Material Specifications for Sanitary Sewers] (for recent changes to JCW specifications see [[media:Highlighted_Changes_to_JCW_Specifications.pdf|Highlighted Changes to JCW Specifications 2/24/10]])&lt;br /&gt;
&lt;br /&gt;
::*[http://www.jcw.org/pdf/forms/engprivatelyfinanced/2010JCWSANITARYSEWERSTANDARDDETAILS.pdf Standard Details].&lt;br /&gt;
:*For the status of sanitary sewer plan submittals and projects see Johnson County Wastewater [http://jcwprojects.jocogov.org/planlist.asp Sewer Project Status] page. &lt;br /&gt;
:*Also see [[#Task No. 9 - Schedule First Utility Meeting | Phase II, Task No. 9]] for Right-Of-Way agreement between JCW and City of Overland Park.&lt;br /&gt;
*&#039;&#039;&#039;Current Johnson County Stormwater Management Program Policy and Procedures&#039;&#039;&#039;&lt;br /&gt;
:See [[Phase_I_-_Vision#Task_3_-_Prepare_SMAC_Project_Addition_Study_.28Form.29 |Phase I, Task No. 3]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - Standard Details ==&lt;br /&gt;
Standard details have been compiled for the City Public Works Department. The standard details can be downloaded from &lt;br /&gt;
&lt;br /&gt;
http://www.opkansas.org/_Bus/Pre-construction_Resources/detaildraw.cfm&lt;br /&gt;
&lt;br /&gt;
If Johnson County Wastewater facilities are involved in the project their [http://www.jcw.org/pdf/forms/engprivatelyfinanced/2010JCWSANITARYSEWERSTANDARDDETAILS.pdf standard details] shall be incorporated into the plans.&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - SMAC Preliminary Study ==&lt;br /&gt;
SMAC Preliminary Study - A preliminary study should be prepared and delivered to Johnson County SMAC officials prior to beginning any design work. &lt;br /&gt;
&lt;br /&gt;
See [[Phase_I_-_Vision#Task_3_-_Prepare_SMAC_Project_Addition_Study_.28Form.29|Phase I, Task No. 3]] for details and checklist for preparing this study.&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - Agency Agreement (if Applicable) ==&lt;br /&gt;
Local government agency agreements should be executed under [[Phase_I_-_Vision#Task_23_-_Execute_Local_Project_Agreement_-_CARS|Phase I, Task No. 23]]. If these agreements were not executed prior to beginning design, execution shall be completed at this time in the preliminary design phase.&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - Conduct Field Surveys ==&lt;br /&gt;
Sufficient and required data necessary for design purposes shall be collected. The field survey shall be in accordance with current accepted and required surveying practices. See City standard Scope of Services in [[#Task_No._3-4_-_Hire_Consultant|Preliminary Design, Task 3-4]] for survey control requirements.&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - Begin Environmental Process ==&lt;br /&gt;
KDOT will control the environmental process task for projects with categorical exclusion. The complexity and effort will depend on each project. The exception would be if an Environmental Assessment or an Environmental Impact Statement is required. In this case, the City or Consultant would perform this task with KDOT and FHWA approval.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-16.xlt|No. II-16|is a spreadsheet KDOT uses in tracking Overland Park administered projects.}}&lt;br /&gt;
&lt;br /&gt;
The Project Engineer shall ensure that all items on the tracking sheet are completed.&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Schedule First Public Information Meeting ==&lt;br /&gt;
Pre-Design - The Consultant/Project Manager shall schedule the first public information meeting. This meeting shall occur prior to beginning preliminary design and field surveys. The purpose of this meeting is to explain the project objectives, present the project schedule, hear the citizen&#039;s concerns and issues, discuss design issues and introduce the involved City Officials and Consultant employees.  For KDOT projects the Notice of Public Information Meeting must be published in the [http://www.kssos.org/pubs/pubs_kansas_register.asp Kansas Register] and [http://sunpublications.com Overland Park Sun.]&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Public information invites shall be sent to the following interested parties:&lt;br /&gt;
*Subdivisions adjacent to the project &lt;br /&gt;
*Home Owners Associations adjacent to the project (list of registered HOA available at communications desk)&lt;br /&gt;
*Group Chairperson for [http://www.opkansas.org/Resident-Resources/Conservation-Program Neighborhood Conservation Groups] adjacent to the project. &lt;br /&gt;
::&#039;&#039;For the phone number of the group chairperson, contact the Neighborhood Planner at 913/895-6270.&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
*Council Members of [http://www.opkansas.org/Resource_/PageResource/Maps-And-Stats/Maps/Adobe-Acrobat-PDF-Maps/wards.pdf Ward(s)] adjacent to the project &lt;br /&gt;
*City Manager &lt;br /&gt;
*City Communications Manager &lt;br /&gt;
*Funding Sources (KDOT, CARS, SMAC ...ect) &lt;br /&gt;
*Other City (Olathe, Leawood ...ect) &lt;br /&gt;
*Public Works Management (PWMG) &lt;br /&gt;
*Supervisory Engineer &lt;br /&gt;
*Construction Inspector &lt;br /&gt;
*Consulting Firm &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Property Owner Conversation Log should be used throughout the project to document all conversations with property owners.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.  [http://www.ksdot.org:9080/burTransPlan/pubtrans/Title%20VI%20Brochure%20-%20English.asp&#039;&#039;&#039;Title VI Brochure&#039;&#039;&#039;] regarding equal opportunity contracting are to be made available at all public meetings.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-17.dot|No. II-17|is an example Invitation Letter to property owners.}}&lt;br /&gt;
{{Exhibit|II-17a.dot|No. II-17a|is an example Notice of Public Information Meeting.}}&lt;br /&gt;
{{Exhibit|II-17b.dot|No. II-17b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Exhibit|II-17c.dot|No. II-17c|is a public meeting agenda.}}&lt;br /&gt;
{{Exhibit|II-17d.dot|No. II-17d|is a public meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Begin Title Report Process == &lt;br /&gt;
The Consultant and/or the Project Manager shall prepare an RFP and forward to a minimum of three land title firms. The RFP should include a map or plan indicating the location of the project and the number of tracts of land involved. Proposals will be forwarded to the Project Manager whereby a firm will be selected and an agreement executed. The RFP should request the following information:&lt;br /&gt;
*legal description of the property and copy of recorded deed(s), &lt;br /&gt;
*mailing address of the property owner, &lt;br /&gt;
*all lien holders of record and recorded mortgage(s), &lt;br /&gt;
*all easements of record and copy of recorded document(s), &lt;br /&gt;
*dedicated R/W and copy of recorded document(s), and &lt;br /&gt;
*records of previous condemnations (available in the office of the District Court of Johnson County Kansas, Olathe, Kansas). &lt;br /&gt;
&lt;br /&gt;
In addition, the RFP should provide instructions that all data to be provided in electronic disk format acceptable to the City. Finally the RFP will establish a date for completing the title certification and report. &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-18a.xlt|No. II-18a|is a list of land title companies to be considered in RFP requests.}}&lt;br /&gt;
{{Exhibit|II-18b.dot|No. II-18b|is a sample land title RFP letter.}}&lt;br /&gt;
{{Exhibit|II-18c.pdf|No. II-18c|is a sample location map with parcel numbers and a parcel ownership report.}}&lt;br /&gt;
{{Exhibit|II-18d.dot|No. II-18d|is a sample letter to selected land title company.}}&lt;br /&gt;
{{Exhibit|II-18e.dot|No. II-18e|is a sample letter to land title companies not selected.}}&lt;br /&gt;
{{Exhibit|II-18f.dot|No. II-18f|is a list of common easement holders and mortgage companies for use by title companies in completing title certificates.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Begin Geotechnical Report Process ==&lt;br /&gt;
The Consultant/Project Engineer shall determine what appropriate geotechnical information and data is necessary to adequately design the project.  Drilled shaft foundations for bridges require specialized inspection.  If drilled shaft foundations are anticipated and the Consultant cannot provide this service, use of a subconsultant may be used after receiving written approval from the City.  For projects designed by City Staff an RFP shall be prepared and forwarded to qualified firms. &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-19.dot|No. II-19|is a sample RFP letter to geotechnical firms, proposal format, summary of pay items (Attachment A), detailed description and description of services (Attachment B).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|IV-2a.dot|No. IV-2a|is a list of materials testing / geotechnical service companies.}}&lt;br /&gt;
&lt;br /&gt;
For projects involving bridge construction, [[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice&#039;&#039;&#039;]] is to be used when writing contracts for geotechnical services.&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Prepare Field Check Plans ==&lt;br /&gt;
Plans should be approximately 50 percent complete for field check review including any proposed easement and R/W takings along with a preliminary construction cost estimate and updated project schedule/checklist. The plans shall be stamped &amp;quot;Preliminary—Field Check&amp;quot;.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|I-25b.xlt|No. I-25b|is a project schedule/checklist.}}&lt;br /&gt;
&lt;br /&gt;
See [[media:Blp-memo-03-12.pdf|&#039;&#039;&#039;BLP Memo 03-12 Engineer&#039;s Professional Seal and Signature on Plans.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Distribute Plans ==&lt;br /&gt;
The Consultant/Project Manager shall distribute preliminary plans to all utility company representatives. With this letter, the utility company representatives are advised of the second utility meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-21 is a sample transmittal letter to utility company representatives.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9.dot|No. II-9|is a list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Distribute Plans for Field Check ==&lt;br /&gt;
The Consultant/Project Engineer shall distribute field check plans along with a copy of the project cost estimate and updated project schedule/checklist to the following:&lt;br /&gt;
*all members of the Project Team (see below for Maintenance Division routing), &lt;br /&gt;
*City Engineer, &lt;br /&gt;
*City Traffic Engineer, &lt;br /&gt;
&lt;br /&gt;
BLP for KDOT projects (if applicable), and &lt;br /&gt;
&lt;br /&gt;
other agency participants. &lt;br /&gt;
&lt;br /&gt;
The Project Manager will send one set of plans to the Maintenance Division District in which the project is located. The plans will go to the appropriate functional Supervisor using the Maintenance Plan Review Memo located under the Public Works tab of the General Templates in Microsoft Word. See Maintenance Plan Review Process for more information. &lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see Exhibit No. II-16.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Request for Design Exception to KDOT ==&lt;br /&gt;
The Consultant/Project Manager shall submit in writing to the Chief, Bureau of Local Projects (KDOT) any request for project design exceptions. The letter should list each design exception and fully explain the reason for the design exceptions.&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Schedule Second Utility Meeting ==&lt;br /&gt;
When the Preliminary Plans are distributed to the utility companies, the second utility meeting is scheduled. An agenda shall accompany the letter and meeting minutes prepared and distributed.&lt;br /&gt;
Note:  In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.&lt;br /&gt;
&lt;br /&gt;
The purpose of the second utility meeting is as follows:&lt;br /&gt;
*check accuracy of utility locations on plans, &lt;br /&gt;
*establish what utilities need to be relocated, &lt;br /&gt;
*establish timetable for accomplishing the relocations, and &lt;br /&gt;
*re-confirm utility representative contacts. &lt;br /&gt;
&lt;br /&gt;
See [[#Task No. 9 - Schedule First Utility Meeting|Phase II, Task No. 9 for exhibits.]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Required Permit Applications ==&lt;br /&gt;
The Consultant/Project Manager shall determine what permits will be required in order to construct the project. The following is a list of possible permits required:&lt;br /&gt;
 &lt;br /&gt;
*City of Overland Park Floodplain Development Permit - necessary for any work in a FEMA floodplain, including areas that will be FEMA floodplain once Johnson County Watershed studies are adopted.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25a.pdf|No. II-25a|is a memo of the steps to be taken on Public Works projects.}}&lt;br /&gt;
{{Exhibit|II-25b.pdf|No. II-25b|is an application and submittal checklist for Floodplain Development Permit.}}&lt;br /&gt;
{{Exhibit|II-25b-1.pdf|No. II-25b-1|is FEMA&#039;s Procedures for &amp;quot;No Rise&amp;quot; Certifications.}}&lt;br /&gt;
&lt;br /&gt;
*City of Overland Park Land Disturbance Permit (LDP) - necessary for any work disturbing more than 1 acre total. ([http://www.kdheks.gov/ KDHE] permit also required, see below).&lt;br /&gt;
&lt;br /&gt;
*Land Disturbance Permit and Erosion and Sediment Control Process is a memo of the steps to be taken on public works projects.&lt;br /&gt;
&lt;br /&gt;
:[http://www.opkansas.org/Documents-and-Forms/Detail/Land-Disturbance-Site-Development-Permit-Application &#039;&#039;&#039;Exhibit No. II-25d&#039;&#039;&#039;] &#039;&#039;is an application for LDP.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
*Permit to Construct-Obstruction in streams from [http://www.ksda.gov/dwr/ State Board of Agriculture - Division of Water Resources] - necessary for any work on a stream with more than 240 acres tributary drainage (some exceptions).   http://www.ksda.gov&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25e.pdf|No. II-25e|is DWR application for permit for Obstruction in Streams.}}&lt;br /&gt;
&lt;br /&gt;
*State of Kansas - Environmental Coordination Act (ECA) - approvals letters from various state agencies are typically required for Stream Obstructions permits and sometimes others.  Contacting these agencies directly for their approval letter can accelerate permitting.  http://www.ksda.gov&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25f.dot|No. II-25f| is a listing of contact information and addresses for the ECA agencies (current Dec 2004, see KSDA website above for updated lists).}}  &lt;br /&gt;
&lt;br /&gt;
*NPDES NOI Permit — Notice of Intent for stormwater discharges associated with construction activity. KDHE - Bureau of Water, Industrial Programs Section. - necessary for any work disturbing more than 1 acre total.  (City of OP LDP also required, see above).   http://www.kdhe.state.ks.us/stormwater&lt;br /&gt;
&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/NOI.pdf &#039;&#039;&#039;Exhibit No. II-25g&#039;&#039;&#039;] &#039;&#039;is a NPDES NOI Permit application.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/General_Permit.pdf &#039;&#039;&#039;Exhibit No. II-25h&#039;&#039;&#039;] &#039;&#039;is a copy of the State of Kansas NPDES General Permit for construction. A copy of this permit must be kept onsite during construction, along with the rest of the Stormwater Pollution Prevention Plan &amp;quot;SWPPP&amp;quot;.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
[[media:Plugging_packet.pdf|Plugging Packet]] is a handout detailing KDHE&#039;s requirements for plugging abandoned water wells.&lt;br /&gt;
&lt;br /&gt;
*Corps of Engineers 404 Permit - necessary for any work located within a &amp;quot;water of the United States&amp;quot;, including wetlands.  http://www.nwk.usace.army.mil/regulatory/regulatory.htm&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25i.pdf|No. II-25i|is a sample letter requesting a project be reviewed for nationwide permit coverage. (Visit [http://www.usace.army.mil/Pages/default.aspx COE website] for latest forms and instructions if an individual permit is needed).}}&lt;br /&gt;
&lt;br /&gt;
*FEMA Conditional and Final Letters of Map Revision - required for certain type of major work in the floodplain, as coordinated with the floodplain administrator (see City of OP Floodplain Development Permit, above) - Obtain latest permit forms and guidance from website.  http://www.fema.gov/plan/prevent/fhm/fmc_fmrp.shtm&lt;br /&gt;
&lt;br /&gt;
*KDOT Highway Permits - necessary for construction or utility relocation within KDOT Right of Way.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25j.pdf|No. II-25j|is KDOT Form 304, Highway Permit Agreement Use of Right of Way.}}&lt;br /&gt;
{{Exhibit|II-25k.dot|No. II-25k|is KDOT Form 308, Cased Utility Line Waiver.}}&lt;br /&gt;
{{Exhibit|II-25l.dot|No. II-25l|is KDOT Form 309, Highway Permit for Highway Access.}}&lt;br /&gt;
{{Exhibit|II-25m.pdf|No. II-25m|is KDOT Form 310, Highway Permit Agreement Attachments to Bridges and Other Structures.}}&lt;br /&gt;
{{Exhibit|II-25n.dot|No. II-25n|is KDOT Form 334, Access Application Information Sheet.}}&lt;br /&gt;
{{Exhibit|II-25o.pdf|No. II-25o|is instructions on preparation of KDOT Forms 304, 308, 309 and 334.}}&lt;br /&gt;
&lt;br /&gt;
See [http://www.ksdot.org/burconsmain/connections/uap2007.pdf 2007 KDOT Utility Accommodation Policy] for additional information.&lt;br /&gt;
&lt;br /&gt;
See [[media:Blp-memo-10-08.pdf|&#039;&#039;&#039;BLP Memo 10-08&#039;&#039;&#039;]], All project related state and/or federal permits must be submitted and [http://www.ksdot.org:9080/burlocalproj/Forms/1307.pdf &#039;&#039;&#039;Form 1307&#039;&#039;&#039;] completed prior to submittal of final check plans.&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Prepare Preliminary Cost Estimate (update) ==&lt;br /&gt;
The Consultant/Project Manager shall prepare and submit an updated preliminary construction cost estimate. The form for this estimate shall resemble the Bid form with the item description, unit, approximate quantity, unit price and total. KDOT-BLP should receive a copy of this estimate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Prepare Preliminary Cash Flow Projection (update) ==&lt;br /&gt;
The Consultant/Project Manager shall prepare a preliminary cash flow projection, including construction costs, and submit it to the City Finance Department on the standard form, see [[media:II-7.xlt|&#039;&#039;&#039;Exhibit No. II-7&#039;&#039;&#039;.]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Begin Field Check Plan Review ==&lt;br /&gt;
The persons [[#Task No. 22 - Distribute Plans for Field Check|(see Task No. 22)]] who receive field check plans shall commence plan review. The review shall be completed prior to the scheduled Field Check meeting.&lt;br /&gt;
 &lt;br /&gt;
If applicable, begin [[media:Electrical_Service_Address_Procedures_-_Preliminary_Plans_-_Task_28.pdf|Electrical Service Address Procedures]] for street lighting controllers, traffic signal controllers, electrical control centers for Parks and Recreation irrigation controllers, flood warning or road weather information systems.&lt;br /&gt;
&lt;br /&gt;
See [[media:Exhibit_G_KCP%26L_Electrical_Service_Application.pdf|Exhibit G for KCP&amp;amp;L Commercial &amp;amp; Industrial Electrical Service Application.]] &lt;br /&gt;
&lt;br /&gt;
See [[media:Sample_Letter_to_KCP%26L_Requesting_Power_-_Preliminary_Plans_-_Task_28.pdf|sample letter]] to KCP&amp;amp;L requesting power service.&lt;br /&gt;
&lt;br /&gt;
== Task No. 29 - Schedule Field Check Meeting ==&lt;br /&gt;
The Project Manager shall schedule the Field Check meeting. Representatives of all funding sources are to be invited. The City Engineer/City Traffic Engineer or their designated representatives will attend all meetings.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9d.dot|No. II-9d|is a meeting sign in sheet.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 30 - Execute Official Agreement with KDOT ==&lt;br /&gt;
When the official KDOT agreement is received by the Project Manager, it is reviewed/approved by the Law Department and placed on the City Council agenda for consideration.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-30.pdf|No. II-30|is a sample of KDOT&#039;s official 2007 KDOT Utility Accommodation Policy/Agreement.}}&lt;br /&gt;
{{Exhibit|II-30a.dot|No. II-30a|is a sample Resolution to be used when KDOT&#039;s City/State Agreement is sent to Council for approval.  The Resolution number is to be obtained from the City Clerks office.}}&lt;br /&gt;
&lt;br /&gt;
Compliance with KDOT&#039;s Non-Descrimination policies are required on all contracts. See [[media:Title VI Handbook.pdf|Title VI Handbook]] for more information.&lt;br /&gt;
&lt;br /&gt;
== Task No. 31 - Obtain Decision for Design Exception from KDOT ==&lt;br /&gt;
The Project Manager shall keep in close contact with BLP-KDOT, if a design exception was requested. The results shall be disseminated to all interested and required parties.&lt;br /&gt;
&lt;br /&gt;
== Task No. 32 - Submit R/W Plans/Legal Descriptions ==&lt;br /&gt;
The Consultant/Project Manager shall submit this information on the date as established with the project schedule. The legal descriptions shall be provided in electronic format along with a written original sealed by a registered land surveyor in the State of Kansas. A tract map for each property shall accompany the legal descriptions. The tract map shall clearly identify each type of proposed taking. Also included with the submittal shall be a copy of all the title company information.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-32.pdf|No. II-32|is an example of legal descriptions and tract map.}}&lt;br /&gt;
{{Exhibit|II-32a.pdf|No. II-32a|and}}&lt;br /&gt;
{{Exhibit|II-32b.pdf|No. II-32b|is a Memorandum from the Register of Deeds, Johnson County, regarding legal description format.}}&lt;br /&gt;
{{Exhibit|II-32c.pdf|No. II-32c|is a Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents. All prepared documents must conform to the Register of Deeds requirements.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|In some instances Long Term Temporary Construction Easement have been granted to the City during the development process. These existing Temporary Construction Easements are usually adjacent to thoroughfares. During the R/W Plan review the project technician is to check for any previously granted Long Term Temporary Construction Easements adjacent to the project. The easements are stored in K:\Maps\Plats\long term tce pdfs and can be identified by the plat map number.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 33 - Hire Appraiser ==&lt;br /&gt;
The Project Manager shall request RFP&#039;s from qualified appraisers. Subsequent to receiving the proposals, the Project Manager shall evaluate the proposals and make recommendations in accordance with City Policy.  If federal funding is involved the Project Manager shall form a Selection Committee and a qualification based selection process shall be used.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|II-33a.dot|No. II-33a|is a list of City qualified appraisers.}}&lt;br /&gt;
{{Exhibit|II-33b.dot|No. II-33b|is a copy of City&#039;s Request for Proposal (RFP) letter.}}&lt;br /&gt;
{{Exhibit|II-33c.xlt|No. II-33c|is a  list of the project right-of-way takings.}}&lt;br /&gt;
{{Exhibit|II-33d.dot|No. II-33d|is a copy of Appraiser Agreement for fee under $10,000.}}&lt;br /&gt;
{{Exhibit|II-33e.dot|No. II-33e|is a copy of Appraiser Agreement for fee over $10,000.}}&lt;br /&gt;
{{Exhibit|II-33f.dot|No. II-33f|is a sample Intra City memorandum to the Selection Committee with proposals from appraisers and ranking sheet.}}&lt;br /&gt;
{{Exhibit|II-33g.dot|No. II-33g|is a sample Intra City memorandum to the Selection Committee with staff recommendations.}}&lt;br /&gt;
&lt;br /&gt;
See FHWA&#039;s Real Estate Acquisition Guide For Local Public Agencies for information that will be necessary when a project is started that requires the acquisition of real estate and receives any Federal funding.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-33h.dot|No. II-33h|is a copy of Appraisal Review form.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 34 - Prepare R/W and Easement Documents ==&lt;br /&gt;
The Project Manager will coordinate the preparation of the various documents necessary for the takings required to construct the project.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-34a.dot|No. II-34a| - Access Easement - Option 1}}&lt;br /&gt;
{{Exhibit|II-34b.dot|No. II-34b| - Access Easement - Option 2}}&lt;br /&gt;
{{Exhibit|II-34c.dot|No. II-34c| - Permanent Maintenance Access Easement}}&lt;br /&gt;
{{Exhibit|II-34d.dot|No. II-34d| - Construction Easement}}&lt;br /&gt;
{{Exhibit|II-34e.dot|No. II-34e| - Deed of Dedication}}&lt;br /&gt;
{{Exhibit|II-34f.dot|No. II-34f| - Kansas Warranty Deed}}&lt;br /&gt;
{{Exhibit|II-34g.dot|No. II-34g| - Quit Claim Deed}}&lt;br /&gt;
{{Exhibit|II-34h.dot|No. II-34h| - Real Estate Mortgage Release - Individual}}&lt;br /&gt;
{{Exhibit|II-34i.dot|No. II-34i| - Real Estate Mortgage Release - Corporation}}&lt;br /&gt;
{{Exhibit|II-34j.dot|No. II-34j| - Permanent Drainage Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34k.dot|No. II-34k| - Permanent Drainage Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34l.dot|No. II-34l| - Permanent Drainage Easement - City Grantor &amp;amp; City Grantee}}&lt;br /&gt;
{{Exhibit|II-34m.dot|No. II-34m| - Permanent Right of Way Easement}}&lt;br /&gt;
{{Exhibit|II-34n.dot|No. II-34n| - Retaining Wall Easement}}&lt;br /&gt;
{{Exhibit|II-34o.dot|No. II-34o| - Sidewalk Easement}}&lt;br /&gt;
{{Exhibit|II-34p.dot|No. II-34p| - Sidewalk Variance}}&lt;br /&gt;
{{Exhibit|II-34q.dot|No. II-34q| - Temporary Construction Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34r.dot|No. II-34r| - Temporary Construction Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34s.dot|No. II-34s| - Temporary Construction Easement - Grading Version 1}}&lt;br /&gt;
{{Exhibit|II-34t.dot|No. II-34t| - Temporary Construction Easement - Grading Version 2}}&lt;br /&gt;
{{Exhibit|II-34u.dot|No. II-34u| - Notice of Termination of Temporary Construction Easement}}&lt;br /&gt;
{{Exhibit|II-34v.dot|No. II-34v| - Traffic Signal Easement}}&lt;br /&gt;
{{Exhibit|II-34vv.dot|No. II-34vv| - Street Light Easement}}&lt;br /&gt;
{{Exhibit|II-34w.dot|No. II-34w| - Utility Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34x.dot|No. II-34x| - Utility Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34y.dot|No. II-34y| - Utility Easement - City Grantor &amp;amp; City Grantee}}&lt;br /&gt;
{{Exhibit|II-34z.dot|No. II-34z| - Right of Way Purchase Contract - Johnson County Public Works}}&lt;br /&gt;
{{Exhibit|II-34zz.dot|No. II-34zz| - Easement Acquisition Agreement - City of Overland Park}}&lt;br /&gt;
{{Exhibit|II-32a.pdf|No. II-32a|and}}  &lt;br /&gt;
{{Exhibit|II-32b.pdf|No. II-32b|is a Memorandum from the Register of Deeds, Johnson County, regarding legal description format.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-32c.pdf|No. II-32c|is a Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents. All prepared documents must conform to the Register of Deeds requirements.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 35 - Schedule Second Public Information Meeting ==&lt;br /&gt;
The purpose of this meeting is to present the preliminary plans to the citizens. For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun. See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-35.dot|No. II-35|is an example Invitation Letter to property owners.}}&lt;br /&gt;
{{Exhibit|II-35a.dot|No. II-35a|is an example Notice of Public Information Meeting.}}&lt;br /&gt;
{{Exhibit|II-35b.dot|No. II-35b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Exhibit|II-35c.dot|No. II-35c|is a public meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.  [http://www.ksdot.org:9080/burTransPlan/pubtrans/Title%20VI%20Brochure%20-%20English.asp&#039;&#039;&#039;Title VI Brochure&#039;&#039;&#039;] regarding equal opportunity contracting are to be made available at all public meetings.&lt;br /&gt;
}}&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=1025</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=1025"/>
		<updated>2010-04-15T18:23:13Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 28 - Approve Contractor Final Pay and Surety Release */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at &#039;&#039;&#039;http://www.ksrevenue.org/pecwelcome.htm&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f]&#039;&#039;&#039; is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-8.dot Exhibit No. V-8]&#039;&#039;&#039; is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._17_-_Schedule_First_Public_Information_Meeting Phase II, Task No. 17]&#039;&#039;&#039; for list of invites.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9.dot Exhibit No. V-9]&#039;&#039;&#039; is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9a.dot Exhibit No. V-9a]&#039;&#039;&#039; is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9b.dot Exhibit No. V-9b]&#039;&#039;&#039; is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-17b.dot Exhibit No. II-17b]&#039;&#039;&#039; is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_V_-_Construction#Task_No._4_-_Distribute_Executed_Contract_Documents Phase V, Task No.4]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos [[media:Project photos.pdf|&#039;&#039;&#039;Metcalf Avenue at 115th Street  looking north&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the [[media:PW_Approved_Materials_List.pdf|&#039;&#039;&#039;Approved Materials List&#039;&#039;&#039;]], they can complete the [[media:Contract Submittal Forms.pdf|&#039;&#039;&#039;Project Submittal Forms&#039;&#039;&#039;]]. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|IV-1a.xlt|No. IV-1a|is a contractor submittals checklist. (from [[Phase_IV_-_Pre-Construction#Task_No._1_-_Complete_Plans.2C_Specifications_and_Estimate|&#039;&#039;&#039;Phase IV, Task 1)&#039;&#039;&#039;]]}}&lt;br /&gt;
{{Exhibit|V-11a.dot|No. V-11a|is a storm sewer structure shop drawing checklist.}}&lt;br /&gt;
{{Exhibit|V-11b.dot|No. V-11b|is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.}}&lt;br /&gt;
{{Exhibit|V-11c.dot|No. V-11c|is a transmittal letter to the contractor for completed submittals review.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable:&lt;br /&gt;
*see [[media:Electrical Service Address Procedures - Construction - Task 12.pdf|&#039;&#039;&#039;Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&#039;&#039;&#039;]]&lt;br /&gt;
*See [http://www.opkansas.org/Documents_and_Forms/comm_building_permit.pdf &#039;&#039;&#039;Commercial Building Permit Application&#039;&#039;&#039;].&lt;br /&gt;
*See [[media:Inspection_Record_and_fax_transmittal_-_Construction_-_Task_12.pdf|&#039;&#039;&#039;sample Inspection Record and fax transmittal&#039;&#039;&#039;]].&lt;br /&gt;
*See [[media:Blank Inspection Record Form.dot|&#039;&#039;&#039;Blank Inspection Record Form&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
Refer to [[media:ESC PW Process.doc|&#039;&#039;&#039;Land Disturbance Permit and Erosion and Sediment Control Process&#039;&#039;&#039;]] as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Note|On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-12a.xlt|No. V-12a|is a copy of the City&#039;s Daily Inspection Report (excel format).}}&lt;br /&gt;
{{Exhibit|V-12b.dot|No. V-12b|is a copy of the City&#039;s Daily Inspection Report in (word format).}}&lt;br /&gt;
{{Exhibit|V-12c.xlt|No. V-12c|is a copy of the City&#039;s Concrete Inspection Requirements.}}&lt;br /&gt;
{{Exhibit|V-12d.dot|No. V-12d|is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).}}&lt;br /&gt;
{{Exhibit|V-12e.xlt|No. V-12e|is a copy of the City&#039;s Sidewalk Ramp Inspection Form.}}&lt;br /&gt;
{{Exhibit|ESC Initial Inspection Form.doc|No. V-12f|is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.}}&lt;br /&gt;
{{Exhibit|ESC Weekly Inspection Form, Amendments and Checklist.xls|No. V-12g|is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.}}&lt;br /&gt;
{{Exhibit|ESC Quality Assurance Form.doc|No. V-12h|is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.}}&lt;br /&gt;
{{Exhibit|ESC Final Inspection Form.doc|No. V-12i|is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.}}&lt;br /&gt;
{{Exhibit|V-7a.dot|No. V-7a|Excellence in Construction information document.}}&lt;br /&gt;
{{Exhibit|V-7b.xlt|No. V-7b|Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).}}&lt;br /&gt;
&lt;br /&gt;
[[media:As-built_plan_procedure_flow_chart.xlt‎|&#039;&#039;&#039;As-Built Plan Procedure Flow Chart&#039;&#039;&#039;]] is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See [[media:KDOT_Construction_Oversight_Questionnaire.pdf|&#039;&#039;&#039;KDOT Construction Oversight Questionnaire&#039;&#039;&#039;]] for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the [http://www.ksdot.org/burconsmain/Connections/ConstManual/index.asp &#039;&#039;&#039;KDOT Construction Manual&#039;&#039;&#039;], Part V, Section 5.17.06.&lt;br /&gt;
 &lt;br /&gt;
See [[media:IV-2f.dot|&#039;&#039;&#039;Exhibit No. IV-2f&#039;&#039;&#039;]] for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-13b.dot|No. V-13b|is an example of a transmittal letter and the City&#039;s Project Data Sheet.}}&lt;br /&gt;
{{Exhibit|V-13c.xlt|No. V-13c|is the City&#039;s Material Testing Log Sheet (excel format).}}&lt;br /&gt;
{{Exhibit|V-13d.dot|No. V-13d|is the City&#039;s Material Testing Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13e.dot|No. V-13e|is the City&#039;s Material Testing Recap Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13f.xlt|No. V-13f|is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  &lt;br /&gt;
{{Note|The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.}}&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
:Alma Ocasio&lt;br /&gt;
:Office Coordinator&lt;br /&gt;
:Kansas Department of Transportation&lt;br /&gt;
:District One&lt;br /&gt;
:1290 South Enterprise&lt;br /&gt;
:Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14a.xlt|No. V-14a|is a template with instructions for creating a Monthly Pay Estimate.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14b.pdf|No. V-14b|is a DOT Form 1008:  DBE Payment Affidavit.}}&lt;br /&gt;
{{Exhibit|V-14c.dot|No. V-14c|is the Certificate of Subcontract Work and Payment.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14d.dot|No. V-14d|is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to [[media:COP247.pdf|&#039;&#039;&#039;COP 247&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see [[media:V-15e.pdf|&#039;&#039;&#039;Exhibit No. V-15e&#039;&#039;&#039;]] which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-15a.dot|No. V-15a|is a blank change order form. (Word Format)}}&lt;br /&gt;
{{Exhibit|V-15b.xlt|No. V-15b|is a blank change order form. (Excel Format)}}&lt;br /&gt;
{{Exhibit|V-15c.dot|No. V-15c|is a sample completed change order form.}}&lt;br /&gt;
{{Exhibit|V-15d.dot|No. V-15d|is a sample change order transmittal letter.}}&lt;br /&gt;
{{Exhibit|V-15e.pdf|No. V-15e|summarizes the procedure for processing construction change orders for KDOT projects.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
*Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
*Hold regular progress meetings. &lt;br /&gt;
*Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
*For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
*For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
*Update Project Journal in the Project Database. &lt;br /&gt;
*Receive telephone inquires and respond accordingly. &lt;br /&gt;
*Handle project correspondence. &lt;br /&gt;
*Prepare/approve payment for material testing. &lt;br /&gt;
*Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
*Conduct final inspection. &lt;br /&gt;
*Approve final Contractor/Consultant payment. &lt;br /&gt;
*Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-16a.dot|No. V-16a|is a sample progress meeting agenda.}}&lt;br /&gt;
{{Exhibit|V-16b.dot|No. V-16b|is a sample progress meeting minutes.}}&lt;br /&gt;
{{Exhibit|V-16c.dot|No. V-16c|is a sample of a Staff Billing Report to finance.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-17.dot|No. V-17|is a sample “Punch List” for the Contractor to complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
{{Exhibit|V-18a.dot|No. V-18a|is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.}}&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/Notice_of_Termination.pdf &#039;&#039;&#039;Exhibit No. V-18b&#039;&#039;&#039;]&#039;&#039; is a link to KDHE&#039;s Notice of Termination form.&#039;&#039;&lt;br /&gt;
{{Exhibit|V-18c.dot|No. V-18c|is a sample KDOT Highway Permit release letter.}}&lt;br /&gt;
{{Exhibit|V-18d.pdf|No. V-18d|is an example with permit enclosure.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See: [[media:As-built_plan_procedure_flow_chart.xlt‎|&#039;&#039;&#039;As-Built Plan Procedure Flow Chart.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
{{Exhibit|V-20a.dot|No. V-20a|is a sample letter to property owners regarding sod/seed care.}}&lt;br /&gt;
{{Exhibit|V-20b.dot|No. V-20b|is a sample letter to property owners regarding tree care.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website, &#039;&#039;&#039;http://www.ksrevenue.org/pecwelcome.htm&#039;&#039;&#039; to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-21a.dot|No. V-21a|is a sample transmittal letter to the Contractor.}}&lt;br /&gt;
{{Exhibit|V-21b.dot|No. V-21b|is a State of Kansas Project Completion Certification.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See [[media:ESC_PW_Process.doc|&#039;&#039;&#039;Land Disturbance Permit Process&#039;&#039;&#039;]] as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-22a.dot|No. V-22a|is a sample “Certificate of Engineer as to Completion” form.}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-22b.dot|No. V-22b|is a sample final inspection letter.}}&lt;br /&gt;
The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
*Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
*Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
*This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of [http://www.ksdot.org/burconsmain/specprov/specifications.asp &#039;&#039;&#039;KDOT Standard Specifications&#039;&#039;&#039;]. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
{{Exhibit|V-23.dot|No. V-23|is a transmittal letter to KDOT regarding completion of project.}}&lt;br /&gt;
{{Exhibit|V-23a.dot|No. V-23a|is a copy of the Notice to Acceptance, City Form V-2398.}}&lt;br /&gt;
{{Exhibit|V-23b.pdf|No. V-23b|is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.}}&lt;br /&gt;
{{Exhibit|V-23c.dot|No. V-23c|is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.}}&lt;br /&gt;
{{Exhibit|V-23d.xlt|No. V-23d|is a sample Final Breakdown of Construction Cost by Work Type.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 [http://www.ksdot.org/burconsmain/specprov/specifications.asp &#039;&#039;&#039;KDOT’s Standard Specifications&#039;&#039;&#039;]. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-25.dot Exhibit No. V-25]&#039;&#039;&#039; is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-26.dot Exhibit No. V-26]&#039;&#039;&#039; is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_V_-_Construction#Task_No._21)_-_Receive_Contractor_Project_Completion_Certification Phase V, Task No. 21]&#039;&#039;&#039;), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_V_-_Construction#Task_No._22_-_Project_Completion_Certification_.26_Scheduling_of_the_Final_Inspection_Prior_to_Expiration_of_2_Year_Performance_Bond Phase V, Task No. 22]&#039;&#039;&#039;). &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-28.pdf Exhibit No. V-28]&#039;&#039;&#039; is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-28.pdf&amp;diff=1024</id>
		<title>File:V-28.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-28.pdf&amp;diff=1024"/>
		<updated>2010-04-15T18:22:47Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample transmittal letter with final Change OrderExplanation, Final Contractor Pay Estiamte, Certificate of Engineer as to Completion and Surety Release.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample transmittal letter with final Change OrderExplanation, Final Contractor Pay Estiamte, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_II_-_Preliminary_Design&amp;diff=1023</id>
		<title>Phase II - Preliminary Design</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_II_-_Preliminary_Design&amp;diff=1023"/>
		<updated>2010-04-15T18:17:42Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 13 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|Phase II begins the engineering design and plan preparation process for a project. The date for beginning this process will depend upon the approved project schedule, budget and time anticipated to complete the various phases/tasks.&lt;br /&gt;
&lt;br /&gt;
The project team will play an important decision-making role in managing a project. This team will consist of City staff and private consultants (if applicable).&lt;br /&gt;
&lt;br /&gt;
Intra-department, public involvement, and utility company meetings are commenced during this phase.&lt;br /&gt;
&lt;br /&gt;
Field check plans are prepared, distributed and reviewed along with preliminary construction cost estimates. Also, R/W and easement documents are completed and, if required, appraisers are hired.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Phase II Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase II Check List|Check List]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Identify Project Team ==&lt;br /&gt;
When a project is scheduled to begin the design phase, the Project Team is to be identified by the City Engineer and/or the City Traffic Engineer, depending on the scope of the project. The purpose of this team is to provide input, information, support, and execution throughout the project planning, design, and construction. The Project Team will generally include the following members: Project Manager, Traffic Engineer, Construction Inspector, Traffic Maintenance Technician, Maintenance Representative, Engineering Technician, Contract Specialist, Law Department Representative, and Finance Representative.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Decide if City Staff to Design ==&lt;br /&gt;
The City Engineer and/or the City Traffic Engineer in consultation with the Project Team will decide whether the project will be designed by the City Staff or by a Consulting Engineer.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3-4 - Hire Consultant ==&lt;br /&gt;
MARC&#039;s rules and regulations do not permit federal dollars to be used for project design services. Therefore, Consultant selection certification, to KDOT, is not applicable as long as this MARC rule is in effect.&lt;br /&gt;
 &lt;br /&gt;
{{Note|The flow diagrams included in this Manual will be provided to the Consultant during the negotiating process. When negotiating an agreement with a consulting firm a narrative of services and a fee schedule is required (examples below).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4a.pdf|No. II-3-4a|is City Resolution No. 3506 sets forth the policies and procedures for the selection of Professional Consulting Services.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4b.dot|No. II-3-4b|City’s standard Engineering / Architectural services agreement for design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4b(1).dot|No. II-3-4b(1)|City’s standard Supplemental Agreement for Professional Engineering Services.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4c.dot|No. II-3-4c|City’s standard Consultant Agreement for non-design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4c(1).dot|No. II-3-4c(1)|City’s standard Supplemental Agreement to the Consultant Agreement for non-design projects.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e.dot|No. II-3-4e|City’s standard Scope of Services.}}&lt;br /&gt;
&lt;br /&gt;
:[[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice&#039;&#039;&#039;]] &#039;&#039;is to be used when writing contracts for projects involving bridge construction.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e(1).dot|No. II-3-4e(1)|City’s standard Scope of Services for a Street Lighting project.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4e(2).dot|No. II-3-4e(2)|City’s standard Scope of Services for a Traffic Signal project.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4f.xlt|No. II-3-4f|City’s standard fee schedule for engineering services agreement.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4g.dot|No. II-3-4g|is a sample RFP letter to Consulting Firms.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4h.dot|No. II-3-4h|is a sample Ranking Memo to Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4i.xlt|No. II-3-4i|is a sample Ranking Sheet to be completed by the Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4j.dot|No. II-3-4j|is a sample Interview Memo to Consultant Selection Committee.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4k.xlt|No. II-3-4k|is a sample of a compiled Ranking Sheet.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4l.dot|No. II-3-4l|is a sample letter requesting interview of short list Consulting Firms.}}&lt;br /&gt;
 &lt;br /&gt;
The selection committee shall meet after ranking sheets are completed and any interviews have been held.  This meeting is to ensure consensus of the selection committee prior to letters being sent to consultants.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4m.dot|No. II-3-4m|is a sample letter to selected Consulting Firm.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4n.dot|No. II-3-4n|is a sample letter to Consulting Firms not selected.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-3-4o.xlt|No. II-3-4o|is a list of Consulting Firms.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Submit Project Description to Law Department ==&lt;br /&gt;
The physical location of the project and a description of what is to be constructed is to be submitted to the Law Department. A feasibility report shall include the physical location of the project, a description of what is to be constructed, a cost estimate, and other necessary information required by the Law Department. The description project centerline shall include the permanent improvements (not tapers for street projects).&lt;br /&gt;
&lt;br /&gt;
An example of a project description is as follows:&lt;br /&gt;
&lt;br /&gt;
:&amp;lt;font color=&amp;quot;green&amp;quot;&amp;gt;&#039;&#039;The reconstruction and widening of certain portions of Nall Avenue from 369 feet south of 119th Street to 135th Street, and the reconstruction and widening of certain portions of 127th Street from Nall Avenue to 500 feet west of Nall Avenue. Construction will include a dual 28 foot roadway with a 24 foot median located in 120 feet of right-of-way, including left turn lanes at required locations, construction of a new bridge on Nall Avenue over Tomahawk Creek, street lighting, storm sewers, a 4 foot concrete sidewalk on one side of the roadway and an 8 foot asphalt sidewalk on the other side of the roadway.&amp;lt;/font&amp;gt;&lt;br /&gt;
&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Prepare Project Schedule ==&lt;br /&gt;
If a Consultant is to be hired, the anticipated construction time period shall be provided. The Consultant shall submit a schedule, using Microsoft Project, indicating the design phases, R/W / easement submittal, meetings, bid opening date and construction time period. If the City Staff is designing the project, a similar schedule shall be prepared by the City Project Manager.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Submit Cash Flow Projections (Engineering Cost) ==&lt;br /&gt;
Subsequent to executing a contract with a Consultant or when the City Staff is selected to provide engineering services, a cash flow projection for engineering services shall be submitted to the City Finance Department.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|II-7.xlt|No. II-7|is the standard cash flow form.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Execute Ordinances-Resolution ==&lt;br /&gt;
The Project Manager, in conjunction with the Law Department, will determine if all necessary City ordinances or resolutions have been executed in order to authorize the project. Examples of possible documents are:&lt;br /&gt;
*creating an improvement district,&lt;br /&gt;
*financing with the thoroughfare statute, and&lt;br /&gt;
*temporary bond financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule First Utility Meeting ==&lt;br /&gt;
Early in the preliminary design phase, the Consultant or Project Manager shall schedule a meeting with all public and private utility officials. A meeting agenda shall be prepared and distributed in advance of the meeting to all scheduled attendees. Meeting minutes shall also be prepared following the meeting and distributed to all scheduled attendees, including those who were invited but did not attend.&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
The purpose of the first utility meeting is as follows:&lt;br /&gt;
&lt;br /&gt;
*obtain utility location maps/information,&lt;br /&gt;
*obtain copies of existing utility easements,&lt;br /&gt;
*present the project schedule,&lt;br /&gt;
*determine if there are critical out-of-service time periods, and&lt;br /&gt;
*confirm utility representative contacts and phone numbers.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9.dot|No. II-9|is a list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9a.dot|No. II-9a|is a copy of the City&#039;s Utility Relocation Guidelines.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9b.dot|No. II-9b|is a sample invitation letter for Utility Coordination Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9c.dot|No. II-9c|sample agenda for Utility Coordination Meeting.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9d.dot|No. II-9d|meeting sign in sheet.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9e.dot|No. II-9e|sample of utility coordination meeting minutes.}}&lt;br /&gt;
 &lt;br /&gt;
&#039;&#039;&#039;Johnson County Wastewater&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9f.pdf|No. II-9f|Right-Of-Way Agreement}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9g.pdf|No. II-9g|Right-Of-Way Agreement, Reference Sheet}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9h.pdf|No. II-9h|Right-Of-Way Agreement, Project Checklist}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9i.xlt|No. II-9i|Payment invoice to JCW for reimbursement of relocation costs.}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Water District No.1 of Johnson County&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9j.pdf|No. II-9j|Right-Of -Way Agreement}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;Williams Pipe Line&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9k.pdf|No. II-9k|Encroachment Guidelines.}}&lt;br /&gt;
&lt;br /&gt;
&#039;&#039;&#039;KCPL&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9l.pdf|No. II-9l|Governmental Relocation Contact List}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9m.pdf|No. II-9m|Service Territory Map}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Pre-Design Meeting ==&lt;br /&gt;
A pre-design meeting shall be scheduled prior to commencing any significant design work. A meeting agenda shall be prepared and distributed in advance of the meeting to the scheduled attendees. Meeting minutes shall be prepared and distributed to all attendees. The purpose of this meeting is to discuss and resolve as many anticipated design issues as possible as follows:&lt;br /&gt;
&lt;br /&gt;
*specific limits of improvements, &lt;br /&gt;
*median openings and left/right turn storage lengths, &lt;br /&gt;
*detailed schedule, &lt;br /&gt;
*confirmation of appropriate design criteria as described in Task No. 11, &lt;br /&gt;
*determine if the project will need a Land Disturbance Permit (LDP), &lt;br /&gt;
*determine detours/street closings, and &lt;br /&gt;
*project phasing/traffic control, &lt;br /&gt;
*identify equipment or material on critical path, see note below, and &lt;br /&gt;
*distribute City&#039;s Standard Bid Items to be used during design. &lt;br /&gt;
&lt;br /&gt;
{{Note|It may be necessary to purchase equipment or material in advance of actual project letting date. Generally this will involve separate purchasing contracts for signal poles, LED&#039;s, signal cabinets, controllers and load switches. Items on the critical path that could delay the project completion date should be identified and the need for separate purchasing contracts discussed.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Design Criteria ==&lt;br /&gt;
Streets shall be designed in accordance with the following:&lt;br /&gt;
*Current edition of the A Policy on Geometric Design of Highways and Streets by the American Association of State Highway and Transportation officials.&lt;br /&gt;
&lt;br /&gt;
*[http://www.ksdot.org:9080/burConsMain/specprov/2007SSDefault.asp Current edition of the Standard Specifications for State Road and Bridge Construction for KDOT.]&lt;br /&gt;
*Current edition of the Non-NHS Local Road and Street Plan for KDOT.&lt;br /&gt;
*[http://www.opkansas.org/Overland-Park-Municipal-Code Current City of Overland Park Municipal Code.]&lt;br /&gt;
**[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1302-Materials-Material-Tests-and-Inspections Municipal Code Chapter 13.02 Materials, Materials Tests, and Inspections]&lt;br /&gt;
**[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1303-Street-Construction-Standards Municipal Code Chapter 13.03 Street Construction Standards]&lt;br /&gt;
**[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1305-Street-Lighting Municipal Code Chapter 13.05 Street Lighting]&lt;br /&gt;
**[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1308-Sidewalk-Construction-and-Repair Municipal Code Chapter 13.08 Sidewalk Construction and Repair.]&lt;br /&gt;
**[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1312-Construction-on-Rights-of-Way Municipal Code Chapter 13.12 Construction on Rights-of-Way.]&lt;br /&gt;
**[http://www.opkansas.org/App_/ROOT/Module/CityGovernment/Engine/DocumentForm/StreamFile.ashx?documentId=1510-Stormwater-Management-Program-Standards-and-Permitting Municipal Code Chapter 15.10 Stormwater Management Program - Standards and Permitting]&lt;br /&gt;
*&#039;&#039;&#039;Stormwater Management&#039;&#039;&#039;&lt;br /&gt;
**Design Criteria - Stormwater Management Facilities This is the City Engineer&#039;s Minimum Stormwater Standards and is a supplement to APWA Section 5600.&lt;br /&gt;
*&#039;&#039;&#039;Erosion and Sediment Control&#039;&#039;&#039;&lt;br /&gt;
**Design Criteria - Erosion and Sediment Control This is the City Erosion and Sediment Control Standards and is a supplement to APWA Section 5100.&lt;br /&gt;
**For an additional resource refer to Designing Erosion Control on a Thoroughfare or Public Works Project. This resource provides guidelines on preparing erosion control strategies and plans.&lt;br /&gt;
*Traffic signals, signing and pavement markings shall be designed in accordance with the latest edition of Manual on Uniform Traffic Control Devices.&lt;br /&gt;
*Streetlights shall be designed in accordance with Resolution No. 2827 and the City’s Streetlighting Design Guide.&lt;br /&gt;
{{Exhibit2|II-11a.dot|No. II-11a|is a two page instructional letter with references regarding the design of street lights.}}&lt;br /&gt;
*Work Zone Traffic Control shall be designed in accordance with the City’s Traffic Control Handbook.&lt;br /&gt;
*City of Overland Park Bridge Design Information&lt;br /&gt;
&lt;br /&gt;
{{Exhibit2|II-11b.dot|No. II-11b|is a list of bridge design information.}}&lt;br /&gt;
{{Exhibit2|II-11c.pdf|No. II-11c|is Public Works Department Bridge Asset Inventory Procedure (January 2007).}}&lt;br /&gt;
::[[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice.&#039;&#039;&#039;]]&lt;br /&gt;
*&#039;&#039;&#039;Johnson County Wastewater&#039;&#039;&#039;&lt;br /&gt;
{{Exhibit2|II-11d.pdf|No. II-11d|Designers Checklist for City Streets and Stormwater Improvements.}}&lt;br /&gt;
{{Exhibit2|II-11e.pdf|No. II-11e|Memo from JCW on existing brick manholes with new cone sections.}}&lt;br /&gt;
:*For city street or stormwater improvement projects that require sanitary sewer relocation or extension, full sanitary sewer design plans per JCW minimum plan requirements must be approved by JCW.  See Procedures for Privately Financed Gravity Sewer Main Extension and Minimum Plan Requirements.&lt;br /&gt;
:*For the status of sanitary sewer plan submittals and projects see Johnson County Wastewater Sewer Project Status page. &lt;br /&gt;
:*Also see [[#Task No. 9 - Schedule First Utility Meeting | Phase II, Task No. 9]] for Right-Of-Way agreement between JCW and City of Overland Park.&lt;br /&gt;
*Current Johnson County Stormwater Management Program Policy and Procedures.&lt;br /&gt;
&lt;br /&gt;
See [[Phase_I_-_Vision#Task_3_-_Prepare_SMAC_Project_Addition_Study_.28Form.29 |Phase I, Task No. 3]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - Standard Details ==&lt;br /&gt;
Standard details have been compiled for the City Public Works Department. The standard details can be downloaded from &lt;br /&gt;
&lt;br /&gt;
http://www.opkansas.org/_Bus/Pre-construction_Resources/detaildraw.cfm&lt;br /&gt;
&lt;br /&gt;
If Johnson County Wastewater facilities are involved in the project their standard details shall be incorporated into the plans. JCW standard details can be downloaded from http://www.jcw.org/engforms.htm&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - SMAC Preliminary Study ==&lt;br /&gt;
SMAC Preliminary Study - A preliminary study should be prepared and delivered to Johnson County SMAC officials prior to beginning any design work. &lt;br /&gt;
&lt;br /&gt;
See [[Phase_I_-_Vision#Task_3_-_Prepare_SMAC_Project_Addition_Study_.28Form.29|Phase I, Task No. 3]] for details and checklist for preparing this study.&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - Agency Agreement (if Applicable) ==&lt;br /&gt;
Local government agency agreements should be executed under [[Phase_I_-_Vision#Task_23_-_Execute_Local_Project_Agreement_-_CARS|Phase I, Task No. 23]]. If these agreements were not executed prior to beginning design, execution shall be completed at this time in the preliminary design phase.&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - Conduct Field Surveys ==&lt;br /&gt;
Sufficient and required data necessary for design purposes shall be collected. The field survey shall be in accordance with current accepted and required surveying practices. See City standard Scope of Services in [[#Task_No._3-4_-_Hire_Consultant|Preliminary Design, Task 3-4]] for survey control requirements.&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - Begin Environmental Process ==&lt;br /&gt;
KDOT will control the environmental process task for projects with categorical exclusion. The complexity and effort will depend on each project. The exception would be if an Environmental Assessment or an Environmental Impact Statement is required. In this case, the City or Consultant would perform this task with KDOT and FHWA approval.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-16.xlt|No. II-16|is a spreadsheet KDOT uses in tracking Overland Park administered projects.}}&lt;br /&gt;
&lt;br /&gt;
The Project Engineer shall ensure that all items on the tracking sheet are completed.&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Schedule First Public Information Meeting ==&lt;br /&gt;
Pre-Design - The Consultant/Project Manager shall schedule the first public information meeting. This meeting shall occur prior to beginning preliminary design and field surveys. The purpose of this meeting is to explain the project objectives, present the project schedule, hear the citizen&#039;s concerns and issues, discuss design issues and introduce the involved City Officials and Consultant employees.  For KDOT projects the Notice of Public Information Meeting must be published in the [http://www.kssos.org/pubs/pubs_kansas_register.asp Kansas Register] and [http://sunpublications.com Overland Park Sun.]&lt;br /&gt;
&lt;br /&gt;
Public information invites shall be sent to the following interested parties:&lt;br /&gt;
*Subdivisions adjacent to the project &lt;br /&gt;
*Home Owners Associations adjacent to the project (list of registered HOA available at communications desk)&lt;br /&gt;
*Group Chairperson for [http://www.opkansas.org/Resident-Resources/Conservation-Program Neighborhood Conservation Groups] adjacent to the project. &lt;br /&gt;
::&#039;&#039;For the phone number of the group chairperson, contact the Neighborhood Planner at 913/895-6270.&#039;&#039; &lt;br /&gt;
&lt;br /&gt;
*Council Members of [http://www.opkansas.org/Resource_/PageResource/Maps-And-Stats/Maps/Adobe-Acrobat-PDF-Maps/wards.pdf Ward(s)] adjacent to the project &lt;br /&gt;
*Governing Body Reading File &lt;br /&gt;
*City Manager &lt;br /&gt;
*City Communications Manager &lt;br /&gt;
*Funding Sources (KDOT, CARS, SMAC ...ect) &lt;br /&gt;
*Other City (Olathe, Leawood ...ect) &lt;br /&gt;
*Public Works Management (PWMG) &lt;br /&gt;
*Supervisory Engineer &lt;br /&gt;
*Construction Inspector &lt;br /&gt;
*Consulting Firm &lt;br /&gt;
&lt;br /&gt;
The Property Owner Conversation Log should be used throughout the project to document all conversations with property owners.&lt;br /&gt;
&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-17.dot|No. II-17|is an example Invitation Letter to property owners.}}&lt;br /&gt;
{{Exhibit|II-17a.dot|No. II-17a|is an example Notice of Public Information Meeting.}}&lt;br /&gt;
{{Exhibit|II-17b.dot|No. II-17b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Exhibit|II-17c.dot|No. II-17c|is a public meeting agenda.}}&lt;br /&gt;
{{Exhibit|II-17d.dot|No. II-17d|is a public meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Begin Title Report Process == &lt;br /&gt;
The Consultant and/or the Project Manager shall prepare an RFP and forward to a minimum of three land title firms. The RFP should include a map or plan indicating the location of the project and the number of tracts of land involved. Proposals will be forwarded to the Project Manager whereby a firm will be selected and an agreement executed. The RFP should request the following information:&lt;br /&gt;
*legal description of the property and copy of recorded deed(s), &lt;br /&gt;
*mailing address of the property owner, &lt;br /&gt;
*all lien holders of record and recorded mortgage(s), &lt;br /&gt;
*all easements of record and copy of recorded document(s), &lt;br /&gt;
*dedicated R/W and copy of recorded document(s), and &lt;br /&gt;
*records of previous condemnations (available in the office of the District Court of Johnson County Kansas, Olathe, Kansas). &lt;br /&gt;
&lt;br /&gt;
In addition, the RFP should provide instructions that all data to be provided in electronic disk format acceptable to the City. Finally the RFP will establish a date for completing the title certification and report. &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-18a.xlt|No. II-18a|is a list of land title companies to be considered in RFP requests.}}&lt;br /&gt;
{{Exhibit|II-18b.dot|No. II-18b|is a sample land title RFP letter.}}&lt;br /&gt;
{{Exhibit|II-18c.pdf|No. II-18c|is a sample location map with parcel numbers and a parcel ownership report.}}&lt;br /&gt;
{{Exhibit|II-18d.dot|No. II-18d|is a sample letter to selected land title company.}}&lt;br /&gt;
{{Exhibit|II-18e.dot|No. II-18e|is a sample letter to land title companies not selected.}}&lt;br /&gt;
{{Exhibit|II-18f.dot|No. II-18f|is a list of common easement holders and mortgage companies for use by title companies in completing title certificates.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Begin Geotechnical Report Process ==&lt;br /&gt;
The Consultant/Project Engineer shall determine what appropriate geotechnical information and data is necessary to adequately design the project.  Drilled shaft foundations for bridges require specialized inspection.  If drilled shaft foundations are anticipated and the Consultant cannot provide this service, use of a subconsultant may be used after receiving written approval from the City.  For projects designed by City Staff an RFP shall be prepared and forwarded to qualified firms. &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-19.dot|No. II-19|is a sample RFP letter to geotechnical firms, proposal format, summary of pay items (Attachment A), detailed description and description of services (Attachment B).}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|IV-2a.dot|No. IV-2a|is a list of materials testing / geotechnical service companies.}}&lt;br /&gt;
&lt;br /&gt;
For projects involving bridge construction, [[media:BLP-Memo-05-15.pdf|&#039;&#039;&#039;BLP Memo 05-15 Geotechnical Bridge Foundation Investigation Practice&#039;&#039;&#039;]] is to be used when writing contracts for geotechnical services.&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Prepare Field Check Plans ==&lt;br /&gt;
Plans should be approximately 50 percent complete for field check review including any proposed easement and R/W takings along with a preliminary construction cost estimate and updated project schedule/checklist. The plans shall be stamped &amp;quot;Preliminary—Field Check&amp;quot;.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|I-25b.xlt|No. I-25b|is a project schedule/checklist.}}&lt;br /&gt;
&lt;br /&gt;
See [[media:Blp-memo-03-12.pdf|&#039;&#039;&#039;BLP Memo 03-12 Engineer&#039;s Professional Seal and Signature on Plans.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Distribute Plans ==&lt;br /&gt;
The Consultant/Project Manager shall distribute preliminary plans to all utility company representatives. With this letter, the utility company representatives are advised of the second utility meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-21 is a sample transmittal letter to utility company representatives.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9.dot|No. II-9|is a list of Johnson County utility and pipeline companies, possible contacts, address and phone numbers.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Distribute Plans for Field Check ==&lt;br /&gt;
The Consultant/Project Engineer shall distribute field check plans along with a copy of the project cost estimate and updated project schedule/checklist to the following:&lt;br /&gt;
*all members of the Project Team (see below for Maintenance Division routing), &lt;br /&gt;
*City Engineer, &lt;br /&gt;
*City Traffic Engineer, &lt;br /&gt;
&lt;br /&gt;
BLP for KDOT projects (if applicable), and &lt;br /&gt;
&lt;br /&gt;
other agency participants. &lt;br /&gt;
&lt;br /&gt;
The Project Manager will send one set of plans to the Maintenance Division District in which the project is located. The plans will go to the appropriate functional Supervisor using the Maintenance Plan Review Memo located under the Public Works tab of the General Templates in Microsoft Word. See Maintenance Plan Review Process for more information. &lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see Exhibit No. II-16.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Request for Design Exception to KDOT ==&lt;br /&gt;
The Consultant/Project Manager shall submit in writing to the Chief, Bureau of Local Projects (KDOT) any request for project design exceptions. The letter should list each design exception and fully explain the reason for the design exceptions.&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Schedule Second Utility Meeting ==&lt;br /&gt;
When the Preliminary Plans are distributed to the utility companies, the second utility meeting is scheduled. An agenda shall accompany the letter and meeting minutes prepared and distributed.&lt;br /&gt;
Note:  In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.&lt;br /&gt;
&lt;br /&gt;
The purpose of the second utility meeting is as follows:&lt;br /&gt;
*check accuracy of utility locations on plans, &lt;br /&gt;
*establish what utilities need to be relocated, &lt;br /&gt;
*establish timetable for accomplishing the relocations, and &lt;br /&gt;
*re-confirm utility representative contacts. &lt;br /&gt;
&lt;br /&gt;
See [[#Task No. 9 - Schedule First Utility Meeting|Phase II, Task No. 9 for exhibits.]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Required Permit Applications ==&lt;br /&gt;
The Consultant/Project Manager shall determine what permits will be required in order to construct the project. The following is a list of possible permits required:&lt;br /&gt;
 &lt;br /&gt;
*City of Overland Park Floodplain Development Permit - necessary for any work in a FEMA floodplain, including areas that will be FEMA floodplain once Johnson County Watershed studies are adopted.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25a.pdf|No. II-25a|is a memo of the steps to be taken on Public Works projects.}}&lt;br /&gt;
{{Exhibit|II-25b.pdf|No. II-25b|is an application and submittal checklist for Floodplain Development Permit.}}&lt;br /&gt;
{{Exhibit|II-25b-1.pdf|No. II-25b-1|is FEMA&#039;s Procedures for &amp;quot;No Rise&amp;quot; Certifications.}}&lt;br /&gt;
&lt;br /&gt;
*City of Overland Park Land Disturbance Permit (LDP) - necessary for any work disturbing more than 1 acre total. ([http://www.kdheks.gov/ KDHE] permit also required, see below).&lt;br /&gt;
&lt;br /&gt;
*Land Disturbance Permit and Erosion and Sediment Control Process is a memo of the steps to be taken on public works projects.&lt;br /&gt;
&lt;br /&gt;
:[http://www.opkansas.org/Documents-and-Forms/Detail/Land-Disturbance-Site-Development-Permit-Application &#039;&#039;&#039;Exhibit No. II-25d&#039;&#039;&#039;] &#039;&#039;is an application for LDP.&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
*Permit to Construct-Obstruction in streams from [http://www.ksda.gov/dwr/ State Board of Agriculture - Division of Water Resources] - necessary for any work on a stream with more than 240 acres tributary drainage (some exceptions).   http://www.ksda.gov&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25e.pdf|No. II-25e|is DWR application for permit for Obstruction in Streams.}}&lt;br /&gt;
&lt;br /&gt;
*State of Kansas - Environmental Coordination Act (ECA) - approvals letters from various state agencies are typically required for Stream Obstructions permits and sometimes others.  Contacting these agencies directly for their approval letter can accelerate permitting.  http://www.ksda.gov&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25f.dot|No. II-25f| is a listing of contact information and addresses for the ECA agencies (current Dec 2004, see KSDA website above for updated lists).}}  &lt;br /&gt;
&lt;br /&gt;
*NPDES NOI Permit — Notice of Intent for stormwater discharges associated with construction activity. KDHE - Bureau of Water, Industrial Programs Section. - necessary for any work disturbing more than 1 acre total.  (City of OP LDP also required, see above).   http://www.kdhe.state.ks.us/stormwater&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25g.pdf|No. II-25g|is a sample NPDES NOI Permit application.  For a blank application with instructions see the KDHE website.}}&lt;br /&gt;
{{Exhibit|II-25h.pdf|No. II-25h|is a copy of the State of Kansas NPDES General Permit for construction.  A copy of this permit must be kept onsite during construction, along with the rest of the Stormwater Pollution Prevention Plan &amp;quot;SWPPP&amp;quot;.}}&lt;br /&gt;
&lt;br /&gt;
[[media:Plugging_packet.pdf|Plugging Packet]] is a handout detailing KDHE&#039;s requirements for plugging abandoned water wells.&lt;br /&gt;
&lt;br /&gt;
*Corps of Engineers 404 Permit - necessary for any work located within a &amp;quot;water of the United States&amp;quot;, including wetlands.  http://www.nwk.usace.army.mil/regulatory/regulatory.htm&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25i.pdf|No. II-25i|is a sample letter requesting a project be reviewed for nationwide permit coverage. (Visit [http://www.usace.army.mil/Pages/default.aspx COE website] for latest forms and instructions if an individual permit is needed).}}&lt;br /&gt;
&lt;br /&gt;
*FEMA Conditional and Final Letters of Map Revision - required for certain type of major work in the floodplain, as coordinated with the floodplain administrator (see City of OP Floodplain Development Permit, above) - Obtain latest permit forms and guidance from website.  http://www.fema.gov/plan/prevent/fhm/fmc_fmrp.shtm&lt;br /&gt;
&lt;br /&gt;
*KDOT Highway Permits - necessary for construction or utility relocation within KDOT Right of Way.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-25j.pdf|No. II-25j|is KDOT Form 304, Highway Permit Agreement Use of Right of Way.}}&lt;br /&gt;
{{Exhibit|II-25k.dot|No. II-25k|is KDOT Form 308, Cased Utility Line Waiver.}}&lt;br /&gt;
{{Exhibit|II-25l.dot|No. II-25l|is KDOT Form 309, Highway Permit for Highway Access.}}&lt;br /&gt;
{{Exhibit|II-25m.pdf|No. II-25m|is KDOT Form 310, Highway Permit Agreement Attachments to Bridges and Other Structures.}}&lt;br /&gt;
{{Exhibit|II-25n.dot|No. II-25n|is KDOT Form 334, Access Application Information Sheet.}}&lt;br /&gt;
{{Exhibit|II-25o.pdf|No. II-25o|is instructions on preparation of KDOT Forms 304, 308, 309 and 334.}}&lt;br /&gt;
&lt;br /&gt;
See [http://www.ksdot.org/burconsmain/connections/uap2007.pdf 2007 KDOT Utility Accommodation Policy] for additional information.&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Prepare Preliminary Cost Estimate (update) ==&lt;br /&gt;
The Consultant/Project Manager shall prepare and submit an updated preliminary construction cost estimate. The form for this estimate shall resemble the Bid form with the item description, unit, approximate quantity, unit price and total. KDOT-BLP should receive a copy of this estimate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Prepare Preliminary Cash Flow Projection (update) ==&lt;br /&gt;
The Consultant/Project Manager shall prepare a preliminary cash flow projection, including construction costs, and submit it to the City Finance Department on the standard form, see [[media:II-7.xlt|&#039;&#039;&#039;Exhibit No. II-7&#039;&#039;&#039;.]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Begin Field Check Plan Review ==&lt;br /&gt;
The persons [[#Task No. 22 - Distribute Plans for Field Check|(see Task No. 22)]] who receive field check plans shall commence plan review. The review shall be completed prior to the scheduled Field Check meeting.&lt;br /&gt;
 &lt;br /&gt;
If applicable, begin [[media:Electrical_Service_Address_Procedures_-_Preliminary_Plans_-_Task_28.pdf|Electrical Service Address Procedures]] for street lighting controllers, traffic signal controllers, electrical control centers for Parks and Recreation irrigation controllers, flood warning or road weather information systems.&lt;br /&gt;
&lt;br /&gt;
See [[media:Exhibit_G_KCP%26L_Electrical_Service_Application.pdf|Exhibit G for KCP&amp;amp;L Commercial &amp;amp; Industrial Electrical Service Application.]] &lt;br /&gt;
&lt;br /&gt;
See [[media:Sample_Letter_to_KCP%26L_Requesting_Power_-_Preliminary_Plans_-_Task_28.pdf|sample letter]] to KCP&amp;amp;L requesting power service.&lt;br /&gt;
&lt;br /&gt;
== Task No. 29 - Schedule Field Check Meeting ==&lt;br /&gt;
The Project Manager shall schedule the Field Check meeting. Representatives of all funding sources are to be invited. The City Engineer/City Traffic Engineer or their designated representatives will attend all meetings.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-9d.dot|No. II-9d|is a meeting sign in sheet.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 30 - Execute Official Agreement with KDOT ==&lt;br /&gt;
When the official KDOT agreement is received by the Project Manager, it is reviewed/approved by the Law Department and placed on the City Council agenda for consideration.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-30.pdf|No. II-30|is a sample of KDOT&#039;s official 2007 KDOT Utility Accommodation Policy/Agreement.}}&lt;br /&gt;
{{Exhibit|II-30a.dot|No. II-30a|is a sample Resolution to be used when KDOT&#039;s City/State Agreement is sent to Council for approval.  The Resolution number is to be obtained from the City Clerks office.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 31 - Obtain Decision for Design Exception from KDOT ==&lt;br /&gt;
The Project Manager shall keep in close contact with BLP-KDOT, if a design exception was requested. The results shall be disseminated to all interested and required parties.&lt;br /&gt;
&lt;br /&gt;
== Task No. 32 - Submit R/W Plans/Legal Descriptions ==&lt;br /&gt;
The Consultant/Project Manager shall submit this information on the date as established with the project schedule. The legal descriptions shall be provided in electronic format along with a written original sealed by a registered land surveyor in the State of Kansas. A tract map for each property shall accompany the legal descriptions. The tract map shall clearly identify each type of proposed taking. Also included with the submittal shall be a copy of all the title company information.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-32.pdf|No. II-32|is an example of legal descriptions and tract map.}}&lt;br /&gt;
{{Exhibit|II-32a.pdf|No. II-32a|and}}&lt;br /&gt;
{{Exhibit|II-32b.pdf|No. II-32b|is a Memorandum from the Register of Deeds, Johnson County, regarding legal description format.}}&lt;br /&gt;
{{Exhibit|II-32c.pdf|No. II-32c|is a Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents. All prepared documents must conform to the Register of Deeds requirements.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|In some instances Long Term Temporary Construction Easement have been granted to the City during the development process. These existing Temporary Construction Easements are usually adjacent to thoroughfares. During the R/W Plan review the project technician is to check for any previously granted Long Term Temporary Construction Easements adjacent to the project. The easements are stored in K:\Maps\Plats\long term tce pdfs and can be identified by the plat map number.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 33 - Hire Appraiser ==&lt;br /&gt;
The Project Manager shall request RFP&#039;s from qualified appraisers. Subsequent to receiving the proposals, the Project Manager shall evaluate the proposals and make recommendations in accordance with City Policy.  If federal funding is involved the Project Manager shall form a Selection Committee and a qualification based selection process shall be used.&lt;br /&gt;
 &lt;br /&gt;
{{Exhibit|II-33a.dot|No. II-33a|is a list of City qualified appraisers.}}&lt;br /&gt;
{{Exhibit|II-33b.dot|No. II-33b|is a copy of City&#039;s Request for Proposal (RFP) letter.}}&lt;br /&gt;
{{Exhibit|II-33c.xlt|No. II-33c|is a  list of the project right-of-way takings.}}&lt;br /&gt;
{{Exhibit|II-33d.dot|No. II-33d|is a copy of Appraiser Agreement for fee under $10,000.}}&lt;br /&gt;
{{Exhibit|II-33e.dot|No. II-33e|is a copy of Appraiser Agreement for fee over $10,000.}}&lt;br /&gt;
{{Exhibit|II-33f.dot|No. II-33f|is a sample Intra City memorandum to the Selection Committee with proposals from appraisers and ranking sheet.}}&lt;br /&gt;
{{Exhibit|II-33g.dot|No. II-33g|is a sample Intra City memorandum to the Selection Committee with staff recommendations.}}&lt;br /&gt;
&lt;br /&gt;
See FHWA&#039;s Real Estate Acquisition Guide For Local Public Agencies for information that will be necessary when a project is started that requires the acquisition of real estate and receives any Federal funding.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-33h.dot|No. II-33h|is a copy of Appraisal Review form.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 34 - Prepare R/W and Easement Documents ==&lt;br /&gt;
The Project Manager will coordinate the preparation of the various documents necessary for the takings required to construct the project.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-34a.dot|No. II-34a| - Access Easement - Option 1}}&lt;br /&gt;
{{Exhibit|II-34b.dot|No. II-34b| - Access Easement - Option 2}}&lt;br /&gt;
{{Exhibit|II-34c.dot|No. II-34c| - Permanent Maintenance Access Easement}}&lt;br /&gt;
{{Exhibit|II-34d.dot|No. II-34d| - Construction Easement}}&lt;br /&gt;
{{Exhibit|II-34e.dot|No. II-34e| - Deed of Dedication}}&lt;br /&gt;
{{Exhibit|II-34f.dot|No. II-34f| - Kansas Warranty Deed}}&lt;br /&gt;
{{Exhibit|II-34g.dot|No. II-34g| - Quit Claim Deed}}&lt;br /&gt;
{{Exhibit|II-34h.dot|No. II-34h| - Real Estate Mortgage Release - Individual}}&lt;br /&gt;
{{Exhibit|II-34i.dot|No. II-34i| - Real Estate Mortgage Release - Corporation}}&lt;br /&gt;
{{Exhibit|II-34j.dot|No. II-34j| - Permanent Drainage Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34k.dot|No. II-34k| - Permanent Drainage Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34l.dot|No. II-34l| - Permanent Drainage Easement - City Grantor &amp;amp; City Grantee}}&lt;br /&gt;
{{Exhibit|II-34m.dot|No. II-34m| - Permanent Right of Way Easement}}&lt;br /&gt;
{{Exhibit|II-34n.dot|No. II-34n| - Retaining Wall Easement}}&lt;br /&gt;
{{Exhibit|II-34o.dot|No. II-34o| - Sidewalk Easement}}&lt;br /&gt;
{{Exhibit|II-34p.dot|No. II-34p| - Sidewalk Variance}}&lt;br /&gt;
{{Exhibit|II-34q.dot|No. II-34q| - Temporary Construction Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34r.dot|No. II-34r| - Temporary Construction Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34s.dot|No. II-34s| - Temporary Construction Easement - Grading Version 1}}&lt;br /&gt;
{{Exhibit|II-34t.dot|No. II-34t| - Temporary Construction Easement - Grading Version 2}}&lt;br /&gt;
{{Exhibit|II-34u.dot|No. II-34u| - Notice of Termination of Temporary Construction Easement}}&lt;br /&gt;
{{Exhibit|II-34v.dot|No. II-34v| - Traffic Signal Easement}}&lt;br /&gt;
{{Exhibit|II-34vv.dot|No. II-34vv| - Street Light Easement}}&lt;br /&gt;
{{Exhibit|II-34w.dot|No. II-34w| - Utility Easement - City Grantor}}&lt;br /&gt;
{{Exhibit|II-34x.dot|No. II-34x| - Utility Easement - City Grantee}}&lt;br /&gt;
{{Exhibit|II-34y.dot|No. II-34y| - Utility Easement - City Grantor &amp;amp; City Grantee}}&lt;br /&gt;
{{Exhibit|II-34z.dot|No. II-34z| - Right of Way Purchase Contract - Johnson County Public Works}}&lt;br /&gt;
{{Exhibit|II-34zz.dot|No. II-34zz| - Easement Acquisition Agreement - City of Overland Park}}&lt;br /&gt;
{{Exhibit|II-32a.pdf|No. II-32a|and}}  &lt;br /&gt;
{{Exhibit|II-32b.pdf|No. II-32b|is a Memorandum from the Register of Deeds, Johnson County, regarding legal description format.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-32c.pdf|No. II-32c|is a Rejection Notice used by the Register of Deeds listing all causes of rejection of filed documents. All prepared documents must conform to the Register of Deeds requirements.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 35 - Schedule Second Public Information Meeting ==&lt;br /&gt;
The purpose of this meeting is to present the preliminary plans to the citizens. For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun. See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|II-35.dot|No. II-35|is an example Invitation Letter to property owners.}}&lt;br /&gt;
{{Exhibit|II-35a.dot|No. II-35a|is an example Notice of Public Information Meeting.}}&lt;br /&gt;
{{Exhibit|II-35b.dot|No. II-35b|is a public meeting sign in sheet.}}&lt;br /&gt;
{{Exhibit|II-35c.dot|No. II-35c|is a public meeting handout.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|This and all subsequent Public Information Meeting notices should ask if participants need a language interpreter or a hearing assistance device and a phone number. All meeting rooms shall be ADA accessible.}}&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=1022</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=1022"/>
		<updated>2010-04-15T18:14:51Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 26 - Receive Final Acceptance from KDOT */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at &#039;&#039;&#039;http://www.ksrevenue.org/pecwelcome.htm&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f]&#039;&#039;&#039; is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-8.dot Exhibit No. V-8]&#039;&#039;&#039; is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._17_-_Schedule_First_Public_Information_Meeting Phase II, Task No. 17]&#039;&#039;&#039; for list of invites.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9.dot Exhibit No. V-9]&#039;&#039;&#039; is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9a.dot Exhibit No. V-9a]&#039;&#039;&#039; is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9b.dot Exhibit No. V-9b]&#039;&#039;&#039; is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-17b.dot Exhibit No. II-17b]&#039;&#039;&#039; is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_V_-_Construction#Task_No._4_-_Distribute_Executed_Contract_Documents Phase V, Task No.4]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos [[media:Project photos.pdf|&#039;&#039;&#039;Metcalf Avenue at 115th Street  looking north&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the [[media:PW_Approved_Materials_List.pdf|&#039;&#039;&#039;Approved Materials List&#039;&#039;&#039;]], they can complete the [[media:Contract Submittal Forms.pdf|&#039;&#039;&#039;Project Submittal Forms&#039;&#039;&#039;]]. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|IV-1a.xlt|No. IV-1a|is a contractor submittals checklist. (from [[Phase_IV_-_Pre-Construction#Task_No._1_-_Complete_Plans.2C_Specifications_and_Estimate|&#039;&#039;&#039;Phase IV, Task 1)&#039;&#039;&#039;]]}}&lt;br /&gt;
{{Exhibit|V-11a.dot|No. V-11a|is a storm sewer structure shop drawing checklist.}}&lt;br /&gt;
{{Exhibit|V-11b.dot|No. V-11b|is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.}}&lt;br /&gt;
{{Exhibit|V-11c.dot|No. V-11c|is a transmittal letter to the contractor for completed submittals review.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable:&lt;br /&gt;
*see [[media:Electrical Service Address Procedures - Construction - Task 12.pdf|&#039;&#039;&#039;Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&#039;&#039;&#039;]]&lt;br /&gt;
*See [http://www.opkansas.org/Documents_and_Forms/comm_building_permit.pdf &#039;&#039;&#039;Commercial Building Permit Application&#039;&#039;&#039;].&lt;br /&gt;
*See [[media:Inspection_Record_and_fax_transmittal_-_Construction_-_Task_12.pdf|&#039;&#039;&#039;sample Inspection Record and fax transmittal&#039;&#039;&#039;]].&lt;br /&gt;
*See [[media:Blank Inspection Record Form.dot|&#039;&#039;&#039;Blank Inspection Record Form&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
Refer to [[media:ESC PW Process.doc|&#039;&#039;&#039;Land Disturbance Permit and Erosion and Sediment Control Process&#039;&#039;&#039;]] as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Note|On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-12a.xlt|No. V-12a|is a copy of the City&#039;s Daily Inspection Report (excel format).}}&lt;br /&gt;
{{Exhibit|V-12b.dot|No. V-12b|is a copy of the City&#039;s Daily Inspection Report in (word format).}}&lt;br /&gt;
{{Exhibit|V-12c.xlt|No. V-12c|is a copy of the City&#039;s Concrete Inspection Requirements.}}&lt;br /&gt;
{{Exhibit|V-12d.dot|No. V-12d|is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).}}&lt;br /&gt;
{{Exhibit|V-12e.xlt|No. V-12e|is a copy of the City&#039;s Sidewalk Ramp Inspection Form.}}&lt;br /&gt;
{{Exhibit|ESC Initial Inspection Form.doc|No. V-12f|is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.}}&lt;br /&gt;
{{Exhibit|ESC Weekly Inspection Form, Amendments and Checklist.xls|No. V-12g|is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.}}&lt;br /&gt;
{{Exhibit|ESC Quality Assurance Form.doc|No. V-12h|is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.}}&lt;br /&gt;
{{Exhibit|ESC Final Inspection Form.doc|No. V-12i|is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.}}&lt;br /&gt;
{{Exhibit|V-7a.dot|No. V-7a|Excellence in Construction information document.}}&lt;br /&gt;
{{Exhibit|V-7b.xlt|No. V-7b|Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).}}&lt;br /&gt;
&lt;br /&gt;
[[media:As-built_plan_procedure_flow_chart.xlt‎|&#039;&#039;&#039;As-Built Plan Procedure Flow Chart&#039;&#039;&#039;]] is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See [[media:KDOT_Construction_Oversight_Questionnaire.pdf|&#039;&#039;&#039;KDOT Construction Oversight Questionnaire&#039;&#039;&#039;]] for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the [http://www.ksdot.org/burconsmain/Connections/ConstManual/index.asp &#039;&#039;&#039;KDOT Construction Manual&#039;&#039;&#039;], Part V, Section 5.17.06.&lt;br /&gt;
 &lt;br /&gt;
See [[media:IV-2f.dot|&#039;&#039;&#039;Exhibit No. IV-2f&#039;&#039;&#039;]] for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-13b.dot|No. V-13b|is an example of a transmittal letter and the City&#039;s Project Data Sheet.}}&lt;br /&gt;
{{Exhibit|V-13c.xlt|No. V-13c|is the City&#039;s Material Testing Log Sheet (excel format).}}&lt;br /&gt;
{{Exhibit|V-13d.dot|No. V-13d|is the City&#039;s Material Testing Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13e.dot|No. V-13e|is the City&#039;s Material Testing Recap Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13f.xlt|No. V-13f|is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  &lt;br /&gt;
{{Note|The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.}}&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
:Alma Ocasio&lt;br /&gt;
:Office Coordinator&lt;br /&gt;
:Kansas Department of Transportation&lt;br /&gt;
:District One&lt;br /&gt;
:1290 South Enterprise&lt;br /&gt;
:Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14a.xlt|No. V-14a|is a template with instructions for creating a Monthly Pay Estimate.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14b.pdf|No. V-14b|is a DOT Form 1008:  DBE Payment Affidavit.}}&lt;br /&gt;
{{Exhibit|V-14c.dot|No. V-14c|is the Certificate of Subcontract Work and Payment.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14d.dot|No. V-14d|is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to [[media:COP247.pdf|&#039;&#039;&#039;COP 247&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see [[media:V-15e.pdf|&#039;&#039;&#039;Exhibit No. V-15e&#039;&#039;&#039;]] which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-15a.dot|No. V-15a|is a blank change order form. (Word Format)}}&lt;br /&gt;
{{Exhibit|V-15b.xlt|No. V-15b|is a blank change order form. (Excel Format)}}&lt;br /&gt;
{{Exhibit|V-15c.dot|No. V-15c|is a sample completed change order form.}}&lt;br /&gt;
{{Exhibit|V-15d.dot|No. V-15d|is a sample change order transmittal letter.}}&lt;br /&gt;
{{Exhibit|V-15e.pdf|No. V-15e|summarizes the procedure for processing construction change orders for KDOT projects.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
*Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
*Hold regular progress meetings. &lt;br /&gt;
*Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
*For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
*For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
*Update Project Journal in the Project Database. &lt;br /&gt;
*Receive telephone inquires and respond accordingly. &lt;br /&gt;
*Handle project correspondence. &lt;br /&gt;
*Prepare/approve payment for material testing. &lt;br /&gt;
*Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
*Conduct final inspection. &lt;br /&gt;
*Approve final Contractor/Consultant payment. &lt;br /&gt;
*Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-16a.dot|No. V-16a|is a sample progress meeting agenda.}}&lt;br /&gt;
{{Exhibit|V-16b.dot|No. V-16b|is a sample progress meeting minutes.}}&lt;br /&gt;
{{Exhibit|V-16c.dot|No. V-16c|is a sample of a Staff Billing Report to finance.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-17.dot|No. V-17|is a sample “Punch List” for the Contractor to complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
{{Exhibit|V-18a.dot|No. V-18a|is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.}}&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/Notice_of_Termination.pdf &#039;&#039;&#039;Exhibit No. V-18b&#039;&#039;&#039;]&#039;&#039; is a link to KDHE&#039;s Notice of Termination form.&#039;&#039;&lt;br /&gt;
{{Exhibit|V-18c.dot|No. V-18c|is a sample KDOT Highway Permit release letter.}}&lt;br /&gt;
{{Exhibit|V-18d.pdf|No. V-18d|is an example with permit enclosure.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See: [[media:As-built_plan_procedure_flow_chart.xlt‎|&#039;&#039;&#039;As-Built Plan Procedure Flow Chart.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
{{Exhibit|V-20a.dot|No. V-20a|is a sample letter to property owners regarding sod/seed care.}}&lt;br /&gt;
{{Exhibit|V-20b.dot|No. V-20b|is a sample letter to property owners regarding tree care.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website, &#039;&#039;&#039;http://www.ksrevenue.org/pecwelcome.htm&#039;&#039;&#039; to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-21a.dot|No. V-21a|is a sample transmittal letter to the Contractor.}}&lt;br /&gt;
{{Exhibit|V-21b.dot|No. V-21b|is a State of Kansas Project Completion Certification.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See [[media:ESC_PW_Process.doc|&#039;&#039;&#039;Land Disturbance Permit Process&#039;&#039;&#039;]] as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-22a.dot|No. V-22a|is a sample “Certificate of Engineer as to Completion” form.}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-22b.dot|No. V-22b|is a sample final inspection letter.}}&lt;br /&gt;
The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
*Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
*Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
*This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of [http://www.ksdot.org/burconsmain/specprov/specifications.asp &#039;&#039;&#039;KDOT Standard Specifications&#039;&#039;&#039;]. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
{{Exhibit|V-23.dot|No. V-23|is a transmittal letter to KDOT regarding completion of project.}}&lt;br /&gt;
{{Exhibit|V-23a.dot|No. V-23a|is a copy of the Notice to Acceptance, City Form V-2398.}}&lt;br /&gt;
{{Exhibit|V-23b.pdf|No. V-23b|is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.}}&lt;br /&gt;
{{Exhibit|V-23c.dot|No. V-23c|is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.}}&lt;br /&gt;
{{Exhibit|V-23d.xlt|No. V-23d|is a sample Final Breakdown of Construction Cost by Work Type.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 [http://www.ksdot.org/burconsmain/specprov/specifications.asp &#039;&#039;&#039;KDOT’s Standard Specifications&#039;&#039;&#039;]. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-25.dot Exhibit No. V-25]&#039;&#039;&#039; is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-26.dot Exhibit No. V-26]&#039;&#039;&#039; is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-26.dot&amp;diff=1021</id>
		<title>File:V-26.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-26.dot&amp;diff=1021"/>
		<updated>2010-04-15T18:14:05Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=1020</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=1020"/>
		<updated>2010-04-15T18:13:43Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 25 - Submit Construction Summary Document to KDOT */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at &#039;&#039;&#039;http://www.ksrevenue.org/pecwelcome.htm&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f]&#039;&#039;&#039; is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-8.dot Exhibit No. V-8]&#039;&#039;&#039; is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._17_-_Schedule_First_Public_Information_Meeting Phase II, Task No. 17]&#039;&#039;&#039; for list of invites.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9.dot Exhibit No. V-9]&#039;&#039;&#039; is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9a.dot Exhibit No. V-9a]&#039;&#039;&#039; is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9b.dot Exhibit No. V-9b]&#039;&#039;&#039; is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-17b.dot Exhibit No. II-17b]&#039;&#039;&#039; is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_V_-_Construction#Task_No._4_-_Distribute_Executed_Contract_Documents Phase V, Task No.4]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos [[media:Project photos.pdf|&#039;&#039;&#039;Metcalf Avenue at 115th Street  looking north&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the [[media:PW_Approved_Materials_List.pdf|&#039;&#039;&#039;Approved Materials List&#039;&#039;&#039;]], they can complete the [[media:Contract Submittal Forms.pdf|&#039;&#039;&#039;Project Submittal Forms&#039;&#039;&#039;]]. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|IV-1a.xlt|No. IV-1a|is a contractor submittals checklist. (from [[Phase_IV_-_Pre-Construction#Task_No._1_-_Complete_Plans.2C_Specifications_and_Estimate|&#039;&#039;&#039;Phase IV, Task 1)&#039;&#039;&#039;]]}}&lt;br /&gt;
{{Exhibit|V-11a.dot|No. V-11a|is a storm sewer structure shop drawing checklist.}}&lt;br /&gt;
{{Exhibit|V-11b.dot|No. V-11b|is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.}}&lt;br /&gt;
{{Exhibit|V-11c.dot|No. V-11c|is a transmittal letter to the contractor for completed submittals review.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable:&lt;br /&gt;
*see [[media:Electrical Service Address Procedures - Construction - Task 12.pdf|&#039;&#039;&#039;Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&#039;&#039;&#039;]]&lt;br /&gt;
*See [http://www.opkansas.org/Documents_and_Forms/comm_building_permit.pdf &#039;&#039;&#039;Commercial Building Permit Application&#039;&#039;&#039;].&lt;br /&gt;
*See [[media:Inspection_Record_and_fax_transmittal_-_Construction_-_Task_12.pdf|&#039;&#039;&#039;sample Inspection Record and fax transmittal&#039;&#039;&#039;]].&lt;br /&gt;
*See [[media:Blank Inspection Record Form.dot|&#039;&#039;&#039;Blank Inspection Record Form&#039;&#039;&#039;]].&lt;br /&gt;
&lt;br /&gt;
Refer to [[media:ESC PW Process.doc|&#039;&#039;&#039;Land Disturbance Permit and Erosion and Sediment Control Process&#039;&#039;&#039;]] as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Note|On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-12a.xlt|No. V-12a|is a copy of the City&#039;s Daily Inspection Report (excel format).}}&lt;br /&gt;
{{Exhibit|V-12b.dot|No. V-12b|is a copy of the City&#039;s Daily Inspection Report in (word format).}}&lt;br /&gt;
{{Exhibit|V-12c.xlt|No. V-12c|is a copy of the City&#039;s Concrete Inspection Requirements.}}&lt;br /&gt;
{{Exhibit|V-12d.dot|No. V-12d|is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).}}&lt;br /&gt;
{{Exhibit|V-12e.xlt|No. V-12e|is a copy of the City&#039;s Sidewalk Ramp Inspection Form.}}&lt;br /&gt;
{{Exhibit|ESC Initial Inspection Form.doc|No. V-12f|is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.}}&lt;br /&gt;
{{Exhibit|ESC Weekly Inspection Form, Amendments and Checklist.xls|No. V-12g|is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.}}&lt;br /&gt;
{{Exhibit|ESC Quality Assurance Form.doc|No. V-12h|is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.}}&lt;br /&gt;
{{Exhibit|ESC Final Inspection Form.doc|No. V-12i|is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.}}&lt;br /&gt;
{{Exhibit|V-7a.dot|No. V-7a|Excellence in Construction information document.}}&lt;br /&gt;
{{Exhibit|V-7b.xlt|No. V-7b|Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).}}&lt;br /&gt;
&lt;br /&gt;
[[media:As-built_plan_procedure_flow_chart.xlt‎|&#039;&#039;&#039;As-Built Plan Procedure Flow Chart&#039;&#039;&#039;]] is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See [[media:KDOT_Construction_Oversight_Questionnaire.pdf|&#039;&#039;&#039;KDOT Construction Oversight Questionnaire&#039;&#039;&#039;]] for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the [http://www.ksdot.org/burconsmain/Connections/ConstManual/index.asp &#039;&#039;&#039;KDOT Construction Manual&#039;&#039;&#039;], Part V, Section 5.17.06.&lt;br /&gt;
 &lt;br /&gt;
See [[media:IV-2f.dot|&#039;&#039;&#039;Exhibit No. IV-2f&#039;&#039;&#039;]] for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-13b.dot|No. V-13b|is an example of a transmittal letter and the City&#039;s Project Data Sheet.}}&lt;br /&gt;
{{Exhibit|V-13c.xlt|No. V-13c|is the City&#039;s Material Testing Log Sheet (excel format).}}&lt;br /&gt;
{{Exhibit|V-13d.dot|No. V-13d|is the City&#039;s Material Testing Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13e.dot|No. V-13e|is the City&#039;s Material Testing Recap Log Sheet (word format).}}&lt;br /&gt;
{{Exhibit|V-13f.xlt|No. V-13f|is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  &lt;br /&gt;
{{Note|The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.}}&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
:Alma Ocasio&lt;br /&gt;
:Office Coordinator&lt;br /&gt;
:Kansas Department of Transportation&lt;br /&gt;
:District One&lt;br /&gt;
:1290 South Enterprise&lt;br /&gt;
:Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14a.xlt|No. V-14a|is a template with instructions for creating a Monthly Pay Estimate.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14b.pdf|No. V-14b|is a DOT Form 1008:  DBE Payment Affidavit.}}&lt;br /&gt;
{{Exhibit|V-14c.dot|No. V-14c|is the Certificate of Subcontract Work and Payment.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-14d.dot|No. V-14d|is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to [[media:COP247.pdf|&#039;&#039;&#039;COP 247&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see [[media:V-15e.pdf|&#039;&#039;&#039;Exhibit No. V-15e&#039;&#039;&#039;]] which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-15a.dot|No. V-15a|is a blank change order form. (Word Format)}}&lt;br /&gt;
{{Exhibit|V-15b.xlt|No. V-15b|is a blank change order form. (Excel Format)}}&lt;br /&gt;
{{Exhibit|V-15c.dot|No. V-15c|is a sample completed change order form.}}&lt;br /&gt;
{{Exhibit|V-15d.dot|No. V-15d|is a sample change order transmittal letter.}}&lt;br /&gt;
{{Exhibit|V-15e.pdf|No. V-15e|summarizes the procedure for processing construction change orders for KDOT projects.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
*Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
*Hold regular progress meetings. &lt;br /&gt;
*Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
*For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
*For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
*Update Project Journal in the Project Database. &lt;br /&gt;
*Receive telephone inquires and respond accordingly. &lt;br /&gt;
*Handle project correspondence. &lt;br /&gt;
*Prepare/approve payment for material testing. &lt;br /&gt;
*Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
*Conduct final inspection. &lt;br /&gt;
*Approve final Contractor/Consultant payment. &lt;br /&gt;
*Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-16a.dot|No. V-16a|is a sample progress meeting agenda.}}&lt;br /&gt;
{{Exhibit|V-16b.dot|No. V-16b|is a sample progress meeting minutes.}}&lt;br /&gt;
{{Exhibit|V-16c.dot|No. V-16c|is a sample of a Staff Billing Report to finance.}}&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-17.dot|No. V-17|is a sample “Punch List” for the Contractor to complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
{{Exhibit|V-18a.dot|No. V-18a|is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.}}&lt;br /&gt;
:[http://www.kdheks.gov/stormwater/download/Notice_of_Termination.pdf &#039;&#039;&#039;Exhibit No. V-18b&#039;&#039;&#039;]&#039;&#039; is a link to KDHE&#039;s Notice of Termination form.&#039;&#039;&lt;br /&gt;
{{Exhibit|V-18c.dot|No. V-18c|is a sample KDOT Highway Permit release letter.}}&lt;br /&gt;
{{Exhibit|V-18d.pdf|No. V-18d|is an example with permit enclosure.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See: [[media:As-built_plan_procedure_flow_chart.xlt‎|&#039;&#039;&#039;As-Built Plan Procedure Flow Chart.&#039;&#039;&#039;]]&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
{{Exhibit|V-20a.dot|No. V-20a|is a sample letter to property owners regarding sod/seed care.}}&lt;br /&gt;
{{Exhibit|V-20b.dot|No. V-20b|is a sample letter to property owners regarding tree care.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website, &#039;&#039;&#039;http://www.ksrevenue.org/pecwelcome.htm&#039;&#039;&#039; to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-21a.dot|No. V-21a|is a sample transmittal letter to the Contractor.}}&lt;br /&gt;
{{Exhibit|V-21b.dot|No. V-21b|is a State of Kansas Project Completion Certification.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See [[media:ESC_PW_Process.doc|&#039;&#039;&#039;Land Disturbance Permit Process&#039;&#039;&#039;]] as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-22a.dot|No. V-22a|is a sample “Certificate of Engineer as to Completion” form.}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
{{Exhibit|V-22b.dot|No. V-22b|is a sample final inspection letter.}}&lt;br /&gt;
The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
*Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
*Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
*This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of [http://www.ksdot.org/burconsmain/specprov/specifications.asp &#039;&#039;&#039;KDOT Standard Specifications&#039;&#039;&#039;]. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
{{Exhibit|V-23.dot|No. V-23|is a transmittal letter to KDOT regarding completion of project.}}&lt;br /&gt;
{{Exhibit|V-23a.dot|No. V-23a|is a copy of the Notice to Acceptance, City Form V-2398.}}&lt;br /&gt;
{{Exhibit|V-23b.pdf|No. V-23b|is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.}}&lt;br /&gt;
{{Exhibit|V-23c.dot|No. V-23c|is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.}}&lt;br /&gt;
{{Exhibit|V-23d.xlt|No. V-23d|is a sample Final Breakdown of Construction Cost by Work Type.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 [http://www.ksdot.org/burconsmain/specprov/specifications.asp &#039;&#039;&#039;KDOT’s Standard Specifications&#039;&#039;&#039;]. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-25.dot Exhibit No. V-25]&#039;&#039;&#039; is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-25.dot&amp;diff=1019</id>
		<title>File:V-25.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-25.dot&amp;diff=1019"/>
		<updated>2010-04-15T18:12:54Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=933</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=933"/>
		<updated>2010-04-14T21:28:46Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 10 - Issue Notice to Proceed */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f] is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-8.dot Exhibit No. V-8]&#039;&#039;&#039; is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._17_-_Schedule_First_Public_Information_Meeting Phase II, Task No. 17]&#039;&#039;&#039; for list of invites.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9.dot Exhibit No. V-9]&#039;&#039;&#039; is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9a.dot Exhibit No. V-9a]&#039;&#039;&#039; is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9b.dot Exhibit No. V-9b]&#039;&#039;&#039; is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-17b.dot Exhibit No. II-17b]&#039;&#039;&#039; is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_V_-_Construction#Task_No._4_-_Distribute_Executed_Contract_Documents Phase V, Task No.4]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=932</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=932"/>
		<updated>2010-04-14T21:17:19Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 9 - Schedule 4th Public Information Meeting */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f] is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-8.dot Exhibit No. V-8]&#039;&#039;&#039; is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._17_-_Schedule_First_Public_Information_Meeting Phase II, Task No. 17]&#039;&#039;&#039; for list of invites.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9.dot Exhibit No. V-9]&#039;&#039;&#039; is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9a.dot Exhibit No. V-9a]&#039;&#039;&#039; is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-9b.dot Exhibit No. V-9b]&#039;&#039;&#039; is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-17b.dot Exhibit No. II-17b]&#039;&#039;&#039; is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-9c.dot&amp;diff=931</id>
		<title>File:V-9c.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-9c.dot&amp;diff=931"/>
		<updated>2010-04-14T21:15:39Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Example of public information meeting agenda.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Example of public information meeting agenda.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-9a.dot&amp;diff=930</id>
		<title>File:V-9a.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-9a.dot&amp;diff=930"/>
		<updated>2010-04-14T21:15:39Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Example of notice of public information meeting.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Example of notice of public information meeting.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-9.dot&amp;diff=929</id>
		<title>File:V-9.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-9.dot&amp;diff=929"/>
		<updated>2010-04-14T21:15:39Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Example of an invitation letter to property owners.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Example of an invitation letter to property owners.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=928</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=928"/>
		<updated>2010-04-14T20:24:02Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 8 - Send Information Letter to Residents */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f] is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-8.dot Exhibit No. V-8]&#039;&#039;&#039; is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-8.dot&amp;diff=927</id>
		<title>File:V-8.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-8.dot&amp;diff=927"/>
		<updated>2010-04-14T20:23:29Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample information letter to residents.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample information letter to residents.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=926</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=926"/>
		<updated>2010-04-14T20:22:19Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f] is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
:*Director of Public Works, &lt;br /&gt;
:*City Engineer/City Traffic Engineer,&lt;br /&gt;
:*Manager, Maintenance Operations,&lt;br /&gt;
:*Maintenance Supervisors,&lt;br /&gt;
:*Traffic Maintenance Locate Representitive, &lt;br /&gt;
:*Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
:*Utility company representatives, &lt;br /&gt;
:*Project team members, &lt;br /&gt;
:*Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
:*Project Engineer/Consultant, &lt;br /&gt;
:*SMAC, &lt;br /&gt;
:*CARS, &lt;br /&gt;
:*KDOT (if applicable), and &lt;br /&gt;
:*Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=925</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=925"/>
		<updated>2010-04-14T20:11:01Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/IV-1a.xlt Exhibit No. IV-1a]&#039;&#039;&#039; and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute &#039;&#039;&#039;[http://opkansas.org/Resource_/PageResource/Doing-Business/Civil-Engineering/Approved-Materials-List/PW_Approved_Materials_List.pdf Approved Materials List]&#039;&#039;&#039;, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7a.dot Exhibit No. V-7a]&#039;&#039;&#039;  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7b.xlt Exhibit No. V-7b]&#039;&#039;&#039;  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-9d.dot Exhibit No. II-9d]&#039;&#039;&#039; is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7c]&#039;&#039;&#039; is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7c.dot Exhibit No. V-7d]&#039;&#039;&#039; is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7e.pdf Exhibit No. V-7e]&#039;&#039;&#039; is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7f.pdf Exhibit No. V-7f] is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7g.pdf Exhibit No. V-7g]&#039;&#039;&#039; Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-7h.pdf Exhibit No. V-7h]&#039;&#039;&#039; is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-7i.pdf&amp;diff=924</id>
		<title>File:V-7i.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-7i.pdf&amp;diff=924"/>
		<updated>2010-04-14T20:05:22Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: LPA preconstruction conference agenda.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;LPA preconstruction conference agenda.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-7g.pdf&amp;diff=922</id>
		<title>File:V-7g.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-7g.pdf&amp;diff=922"/>
		<updated>2010-04-14T20:05:22Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample of City&amp;#039;s Field Building Permit for electrical work.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample of City&#039;s Field Building Permit for electrical work.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-7f.pdf&amp;diff=921</id>
		<title>File:V-7f.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-7f.pdf&amp;diff=921"/>
		<updated>2010-04-14T20:05:22Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: City&amp;#039;s standard preconstruction meeting checklist.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;City&#039;s standard preconstruction meeting checklist.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-7d.dot&amp;diff=919</id>
		<title>File:V-7d.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-7d.dot&amp;diff=919"/>
		<updated>2010-04-14T20:05:22Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample pre-constructioninvitation attendance letter.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample pre-constructioninvitation attendance letter.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-7b.xlt&amp;diff=918</id>
		<title>File:V-7b.xlt</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-7b.xlt&amp;diff=918"/>
		<updated>2010-04-14T20:05:22Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Excellence in Construction evaluation form (Attachment A).&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Excellence in Construction evaluation form (Attachment A).&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-7b.dot&amp;diff=917</id>
		<title>File:V-7b.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-7b.dot&amp;diff=917"/>
		<updated>2010-04-14T20:05:21Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Excellence in Construction information document&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Excellence in Construction information document&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=916</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=916"/>
		<updated>2010-04-14T19:32:16Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 6 - Complete Material Testing Contracts */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_IV_-_Pre-Construction#Task_No._2_-_Distribute_Material_Testing_Proposals Phase IV, Task No. 2]&#039;&#039;&#039;. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6a.dot Exhibit No. V-6a]&#039;&#039;&#039; is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-6b.dot Exhibit No. V-6b]&#039;&#039;&#039; is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/COP247.pdf COP 247]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist Exhibit No. IV-1a and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute Approved Materials List, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-9d is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7c is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7d is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7e is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7f is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7g Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7h is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:COP247.pdf&amp;diff=915</id>
		<title>File:COP247.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:COP247.pdf&amp;diff=915"/>
		<updated>2010-04-14T19:30:09Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Refers to contracts exceeding $50K.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Refers to contracts exceeding $50K.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-6b.dot&amp;diff=914</id>
		<title>File:V-6b.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-6b.dot&amp;diff=914"/>
		<updated>2010-04-14T19:30:09Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample letter to material Testing not selected.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample letter to material Testing not selected.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-6a.dot&amp;diff=913</id>
		<title>File:V-6a.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-6a.dot&amp;diff=913"/>
		<updated>2010-04-14T19:30:09Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample letter to selected material testing lab.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample letter to selected material testing lab.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=912</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=912"/>
		<updated>2010-04-14T19:25:04Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 5 - Complete Sales Tax Exemption Forms */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5a.pdf Exhibit No. V-5a]&#039;&#039;&#039; New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5b.pdf Exhibit No. V-5b]&#039;&#039;&#039; is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-5c.dot Exhibit No. V-5c]&#039;&#039;&#039;is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from Phase IV, Task No. 2. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
Exhibit No. V-6a is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-6b is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to COP 247.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist Exhibit No. IV-1a and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute Approved Materials List, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-9d is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7c is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7d is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7e is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7f is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7g Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7h is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-5c.dot&amp;diff=911</id>
		<title>File:V-5c.dot</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-5c.dot&amp;diff=911"/>
		<updated>2010-04-14T19:23:23Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample transmittal letter to contractor regarding exemption certificate.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample transmittal letter to contractor regarding exemption certificate.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-5b.pdf&amp;diff=910</id>
		<title>File:V-5b.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-5b.pdf&amp;diff=910"/>
		<updated>2010-04-14T19:23:23Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: Sample transmittal letter from Division of Taxation w/Exemption certificate.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Sample transmittal letter from Division of Taxation w/Exemption certificate.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=File:V-5a.pdf&amp;diff=909</id>
		<title>File:V-5a.pdf</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=File:V-5a.pdf&amp;diff=909"/>
		<updated>2010-04-14T19:23:23Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: New requirements for submitting Request for Projects Exemption certificates (state of Kansas) as of 8/1/06.&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;New requirements for submitting Request for Projects Exemption certificates (state of Kansas) as of 8/1/06.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=908</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=908"/>
		<updated>2010-04-14T18:59:45Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 4 - Distribute Executed Contract Documents */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
Exhibit No. V-5a New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5b is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5c is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from Phase IV, Task No. 2. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
Exhibit No. V-6a is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-6b is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to COP 247.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist Exhibit No. IV-1a and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute Approved Materials List, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-9d is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7c is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7d is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7e is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7f is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7g Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7h is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=907</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=907"/>
		<updated>2010-04-14T18:58:54Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 4 - Distribute Executed Contract Documents */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See :&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
Exhibit No. V-5a New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5b is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5c is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from Phase IV, Task No. 2. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
Exhibit No. V-6a is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-6b is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to COP 247.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist Exhibit No. IV-1a and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute Approved Materials List, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-9d is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7c is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7d is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7e is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7f is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7g Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7h is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=906</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=906"/>
		<updated>2010-04-14T18:56:52Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 4 - Distribute Executed Contract Documents */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see :&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See :&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
Exhibit No. V-5a New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5b is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5c is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from Phase IV, Task No. 2. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
Exhibit No. V-6a is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-6b is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to COP 247.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist Exhibit No. IV-1a and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute Approved Materials List, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-9d is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7c is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7d is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7e is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7f is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7g Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7h is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>
		<author><name>Jackie Clark</name></author>
	</entry>
	<entry>
		<id>https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=905</id>
		<title>Phase V - Construction</title>
		<link rel="alternate" type="text/html" href="https://ppm.opkansas.org/wiki/index.php?title=Phase_V_-_Construction&amp;diff=905"/>
		<updated>2010-04-14T18:55:29Z</updated>

		<summary type="html">&lt;p&gt;Jackie Clark: /* Task No. 4 - Distribute Executed Contract Documents */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;{{Navbar}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Introduction ==&lt;br /&gt;
{{Introduction&lt;br /&gt;
|The construction phase of projects is very visible and generally there are travel/inconveniences and neighborhood disruptions. For this reason, it is the most important phase for City staff and Consultants to plan for the least possible construction time period.&lt;br /&gt;
&lt;br /&gt;
A partnering or the team approach usually is recommended. The Contractor, utility companies, City staff and Consultant all work as a team to construct the project. The tasks in this and previous phases facilitates this partnering process.&lt;br /&gt;
&lt;br /&gt;
In order to have a successful project, the following must occur:&lt;br /&gt;
&lt;br /&gt;
*Contract documents executed promptly.&lt;br /&gt;
&lt;br /&gt;
*Discuss/resolve relevant issues/problems at the pre-construction conference.&lt;br /&gt;
&lt;br /&gt;
*Review/approve shop drawings within the promised time period.&lt;br /&gt;
&lt;br /&gt;
*Pay the Contractor promptly.&lt;br /&gt;
&lt;br /&gt;
*Provide adequate inspection resources in order not to delay the Contractor.&lt;br /&gt;
&lt;br /&gt;
*Notify the Contractor if the submitted schedule is not maintained. Schedule bi-weekly meetings, if necessary, to keep the project on schedule.&lt;br /&gt;
}}&lt;br /&gt;
&lt;br /&gt;
== [[Checklist Phase V|Checklist]] ==&lt;br /&gt;
&lt;br /&gt;
== [[Phase V Flow Chart|Flow Chart]] ==&lt;br /&gt;
&lt;br /&gt;
== Task No. 1 - Prepare for Temporary Financing ==&lt;br /&gt;
The Law Department will prepare the documents for providing project temporary financing.&lt;br /&gt;
&lt;br /&gt;
== Task No. 2 - Submit Agency Cash Flow Projection ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit to the project funding agencies, if required, a project cash flow projection on their standard forms. Currently, Johnson County CARS and KDOT do not require a cash flow projection.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-2.xlt Exhibit No. V-2]&#039;&#039;&#039; is Johnson County SMAC cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 3 - Submit Cash Flow Projection to City Finance Department ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to Contract award by the City Council, the Project Manager shall submit a cash flow for the project (update if applicable) to the City Finance Department. See &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/Phase_II_-_Preliminary_Design#Task_No._7_-_Submit_Cash_Flow_Projections_.28Engineering_Cost.29 Phase II, Task No. 7]&#039;&#039;&#039; for standard cash flow form.&lt;br /&gt;
&lt;br /&gt;
== Task No. 4 - Distribute Executed Contract Documents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
If a Consultant is involved, five copies need to be prepared for the Contractor’s execution. Two copies go to the Contractor (one of which the Contractor is to forward to the surety company), one to the consultant, one in the Public Works file, and the original (with original insurance certification and Power of Attorney for the Performance and Statutory Bond) goes to the City Clerk with the award/reject letters.  Six additional copies should be prepared for KDOT projects and one additional copy should be prepared for SMAC and CARS projects.&lt;br /&gt;
The Agreement, Performance Bond, Statutory Bond and/or Labor and Materials Payment Bond, and Appointment of Agent for Service of Process are filled out by the Contract Specialist.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contractor is given ten (10) days to execute their part of the Contract Documents. The Contractor must have all his insurance certificates, bonds and agent for service of process filled out, sealed, and Power of Attorneys attached. The Instructions to Bidders has the proper insurance requirements. Be sure their insurance certificate has enough coverage. The Agent for Service of Process is not required if the Contractor’s business is located in the state of Kansas or if the Contractor is located outside of Kansas but is on file and in good standing with the State. The Contract Specialist calls the State to get this information.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Documents are then sent to the Law Department after they have been properly executed by the Contractor. The assigned attorney will &amp;quot;approve as to form&amp;quot; and send them back to the Contract Specialist. After the assigned attorney&#039;s approval, they go to the City Clerk&#039;s office for the Mayor and City Clerk to sign.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4a.dot Exhibit No. V-4a]&#039;&#039;&#039; is a sample transmittal letter to KDOT.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/V-4b.dot Exhibit No. V-4b]&#039;&#039;&#039; is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
For CARS projects the City must submit, to the Johnson County Director of Infrastructure, one copy of the executed Contract Documents and a half size set of singed Construction Plans along with a CD containing a PDF of the executed Contract Documents and TIFF images of the Construction Plans. The County also requires a list of CARS non-participating items with the transmittal. The City must also request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. For a letter detailing the CARS requirements see :&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/III-7a.pdf Exhibit No. III-7a]&#039;&#039;&#039;.&lt;br /&gt;
&lt;br /&gt;
:&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/File:V-4c.dot Exhibit No. V-4c]&#039;&#039;&#039; is a sample Contract Document and Plans transmittal letter to CARS with request for &amp;quot;Notice to Proceed&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
See :&#039;&#039;&#039;[http://ppm.opkansas.org/wiki/index.php/File:V-4d.dot Exhibit No. V-4d]&#039;&#039;&#039; for a distribution list of agencies and personnel that are to receive executed Contract Documents and Final Plans.&lt;br /&gt;
&lt;br /&gt;
{{Note|For KDOT Projects this task is tracked by KDOT see &#039;&#039;&#039;[http://ppm.opkansas.org/wiki/images/II-16.xlt Exhibit No. II-16]&#039;&#039;&#039;.  The Project Engineer shall ensure this task is complete.}}&lt;br /&gt;
&lt;br /&gt;
== Task No. 5 - Complete Sales Tax Exemption Forms ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will get a sales tax exemption number from the Kansas Department of Revenue for the Contractor&#039;s use when purchasing materials for all projects. The request will be made on-line at http://www.ksrevenue.org/pecwelcome.htm.&lt;br /&gt;
Exhibit No. V-5a New requirements as of 8-1-06 for submitting Request for Projects Exemption Certificates. (State of Kansas)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5b is a sample transmittal letter from the Division of Taxation with Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-5c is a sample transmittal letter to the contractor regarding Exemption Certificate.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 6 - Complete Material Testing Contracts ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall evaluate the proposals received resulting from Phase IV, Task No. 2. The firm with the lowest responsible and qualified proposal will be contacted and advised that their proposal has been accepted.&lt;br /&gt;
Exhibit No. V-6a is a sample letter to selected material testing lab.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-6b is a sample letter to material testing lab not selected.&lt;br /&gt;
&lt;br /&gt;
The director of Public Works is authorized to sign contracts up to $10,000.&lt;br /&gt;
&lt;br /&gt;
The City Manager is authorized to sign contracts between $10,000 and $50,000&lt;br /&gt;
&lt;br /&gt;
The City Council must approve all contracts exceeding $50,000.  Refer to COP 247.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to distributing executed contract documents and prior to issuing Notice to Proceed, the Project Manager will schedule a pre-construction conference. Meeting minutes will be distributed to those in attendance at a later date.&lt;br /&gt;
&lt;br /&gt;
{{Note|In an effort to avoid scheduling conflicts with other called utility meetings an Outlook calendar has been created called PW Utilities. PW Utilities shall be invited as an attendee to all utility meetings, pre-bid conferences and pre-construction conferences or any meeting requesting utility company attendance.}}&lt;br /&gt;
&lt;br /&gt;
Some of the items that should be covered during the conference are:&lt;br /&gt;
&lt;br /&gt;
review the plans, special provisions and specifications for the project, &lt;br /&gt;
&lt;br /&gt;
meet the Contractor’s assigned Superintendent, &lt;br /&gt;
&lt;br /&gt;
meet the Sub-Contractor(s), &lt;br /&gt;
&lt;br /&gt;
receive/discuss the Contractor’s schedule, &lt;br /&gt;
&lt;br /&gt;
confirm City’s payment schedule, &lt;br /&gt;
&lt;br /&gt;
status report/confirmation of utility relocations, &lt;br /&gt;
&lt;br /&gt;
review/presentation of City’s pre-construction checklist, &lt;br /&gt;
&lt;br /&gt;
answer contractor questions, &lt;br /&gt;
&lt;br /&gt;
distribute contractors submittal checklist Exhibit No. IV-1a and review requirements, &lt;br /&gt;
&lt;br /&gt;
distribute Approved Materials List, &lt;br /&gt;
&lt;br /&gt;
distribute SWPPP Notebook to Contractor, review requirments and obtain signature for Contractor Certification Form (included in the SWPPP), &lt;br /&gt;
&lt;br /&gt;
determine if a City Field Building Permit is required by the Contractor, &lt;br /&gt;
&lt;br /&gt;
introduce and distribute information for  Excellence in Construction, Contractor Evaluation System, &lt;br /&gt;
&lt;br /&gt;
distribute Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity. &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-9d is a meeting sign in sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7c is a sample pre-construction invitation attendance letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7d is a sample pre-construction agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7e is the City’s standard pre-construction meeting checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7f is a sample of a City’s Field Building Permit for electrical work.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7g Contractor&#039;s Certification Form for Stormwater Discharges Associated with Construction Activity.&lt;br /&gt;
&lt;br /&gt;
The following persons/firms will be invited to attend this conference.&lt;br /&gt;
&lt;br /&gt;
Director of Public Works, &lt;br /&gt;
&lt;br /&gt;
City Engineer/City Traffic Engineer,&lt;br /&gt;
&lt;br /&gt;
Manager, Maintenance Operations,&lt;br /&gt;
&lt;br /&gt;
Maintenance Supervisors,&lt;br /&gt;
&lt;br /&gt;
Traffic Maintenance Locate Representitive, &lt;br /&gt;
&lt;br /&gt;
Contractor’s representative and project Superintendent/Sub-Contractors, &lt;br /&gt;
&lt;br /&gt;
Utility company representatives, &lt;br /&gt;
&lt;br /&gt;
Project team members, &lt;br /&gt;
&lt;br /&gt;
Erosion and Sediment Control (ESC) Plan Reviewer.&lt;br /&gt;
&lt;br /&gt;
Project Engineer/Consultant, &lt;br /&gt;
&lt;br /&gt;
SMAC, &lt;br /&gt;
&lt;br /&gt;
CARS, &lt;br /&gt;
&lt;br /&gt;
KDOT (if applicable), and &lt;br /&gt;
&lt;br /&gt;
Material testing laboratory. &lt;br /&gt;
&lt;br /&gt;
When KDOT administers the project, a LPA Preconstruction Conference will be held.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7h is a LPA Preconstruction Conference agenda.&lt;br /&gt;
&lt;br /&gt;
Note: An address must be established for each streetlight control center and traffic signal location for KCPL billing and reference purpose.&lt;br /&gt;
&lt;br /&gt;
Before construction begins on any CARS or SMAC project, the City must erect a sign in the immediate vicinity of the project identifying it as a CARS or SMAC program project.  However, if the project has Federal funding in addition to CARS or SMAC the project sign is not to be erected.  The sign specifications will be furnished to the City by the County upon request.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 8 - Send Information Letter to Residents ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Project Contractor has been confirmed (Contract executed), the Project Manager will send an informational letter to all residents/businesses affected by the project. The primary purpose of this letter is to invite the residents to the 4th Public Information Meeting and to stress the importance of safety during the project construction time period. If a resident has not attended any of the public information meetings, this letter can also bring the resident(s) up-to-date regarding the project.&lt;br /&gt;
Exhibit No. V-8 is a sample information letter to residents.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 9 - Schedule 4th Public Information Meeting ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall schedule the fourth Public Information meeting. The primary purpose of this meeting is to introduce the Contractor’s employees who will be involved in the project. The Contractor’s representative should explain how the project is to be constructed, access to property during construction, and who to contact (Contractor’s employees) during the normal work day and during the night and weekends.  For KDOT projects the Notice of Public Information Meeting must be published in the Kansas Register and Overland Park Sun.&lt;br /&gt;
 &lt;br /&gt;
See Phase II, Task No. 17 for list of invites.&lt;br /&gt;
Exhibit No. V-9 is an example Invitation Letter to property owners.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9a is an example Notice of Public Information Meeting.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-9b is an example Public Information Meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. II-17b is a public meeting sign in sheet&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 10 - Issue Notice to Proceed ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
After the Contract Documents have been fully executed and Pre-Construction meeting has been held, the Consultant/Project Manager shall issue the “Notice to Proceed”. This notice shall state the date the work is to begin, intermediate completion dates if applicable and, the date the work is to be completed. The Notice to Proceed shall not be issued prior to the Pre-Construction meeting.  For KDOT projects, a copy of the Notice to Proceed is to be forwarded to the District One office, the Kansas City Metro office and BLP.&lt;br /&gt;
&lt;br /&gt;
Prior to issuing Notice to Proceed, the Contract Specialist will request and receive from the contractor copies of all DBE subcontracts and at least one randomly select non-DBE subcontract. The Contract Specialist will verify that each of these subcontracts contain FHWA 1273 documents. &lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must request and receive a &amp;quot;Notice to Proceed&amp;quot; from the Johnson County Director of Infrastructure before initiating construction on a project. see Phase V, Task No.4.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-10 is a sample Notice to Proceed to the contractor.&lt;br /&gt;
&lt;br /&gt;
At this time project photos should begin.  The project photos should include &amp;quot;before&amp;quot;, &amp;quot;during&amp;quot;, and &amp;quot;after&amp;quot; shots of significant work areas and items.  To best depict progress the photos should be taken from the same vantage points throughout construction.  Example project photos Metcalf Avenue at 115th Street  looking north.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 11 - Complete Submittals Review ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall assign personnel to review Contractor submittals. The objective is to respond to these submittals within 7 calendar days if a City designed project and 14 calendar days if a Consultant designed project.  The submittal checklist is to be updated as submittals are reviewed and approved.  It is very important that material certifications and mix designs be received and approved prior to placement.&lt;br /&gt;
&lt;br /&gt;
Rather than the Contractor submitting catalog cuts for items on the Approved Materials List, they can complete the Project Submittal Forms. The City or Consulting Engineer will review the forms against the approved list.  Items which are not on the approved list will need to be submitted with catalog cuts, sample of product and specifications for review.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. IV-1a is a contractor submittals checklist. (from Phase IV, Task 1)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11a is a storm sewer structure shop drawing checklist.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11b is a copy of the City&#039;s Concrete Mix Design Requirements with approval letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-11c is a transmittal letter to the contractor for completed submittals review.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 12 - On-Going Inspections ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Inspector will be identified/assigned early in the preliminary design process and will be a member of the City Project Team.  Other inspectors may be assigned to the project on a full or part time basis depending upon the construction activity occurring. An inspector may be assigned to more than one project. The inspector(s) shall keep a daily journal/log for each project. This journal/log shall record the temperature, weather, contractor activities, material testing performed, utility relocation information, contact with citizens, visitors to the site, and any important daily communication between the Contractor’s Superintendent and the inspector(s).  Excellence in Construction, Contractor  Evaluation shall also be tracked throughout construction.&lt;br /&gt;
 &lt;br /&gt;
If applicable, see Electrical Service Permit Procedures for Street Lighting Controllers or Traffic Signals Controllers.&lt;br /&gt;
&lt;br /&gt;
*See Commercial Building Permit Application.&lt;br /&gt;
*See sample Inspection Record and fax transmittal.&lt;br /&gt;
*See Blank Inspection Record Form.&lt;br /&gt;
&lt;br /&gt;
Refer to Land Disturbance Permit and Erosion and Sediment Control Process as it pertains to initial installation and inspection of erosion and sediment control measures, the SWPPP notebook, and ongoing inspection of control measures throughout construction. &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
On KDOT projects the assigned inspector(s) will be KDOT Certified Inspector(s).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12a is a copy of the City&#039;s Daily Inspection Report (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12b is a copy of the City&#039;s Daily Inspection Report in (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12c is a copy of the City&#039;s Concrete Inspection Requirements.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12d is a copy of the City&#039;s Summary of Cold Weather Concrete Procedures (11/22/00).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12e is a copy of the City&#039;s Sidewalk Ramp Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12f is a copy of the City&#039;s Initial Erosion and Sediment Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12g is a copy of the City&#039;s Weekly Erosion and Sediment Control Inspection Report Forms, Amendments Log and BMP Inspection Checklist. Contractor may use their own inspection forms, subject to review and approval by the Project Team.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12h is a copy of the City&#039;s Erosion and Sediment Control Quality Assurance Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-12i is a copy of the City&#039;s Erosion and Sediment Control Final Inspection Form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7a  Excellence in Construction information document.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-7b  Excellence in Construction evaluation form (Attachment &amp;quot;A&amp;quot;).&lt;br /&gt;
&lt;br /&gt;
As-Built Plan Procedure Flow Chart is to be followed once construction activities begin.&lt;br /&gt;
&lt;br /&gt;
KDOT can performed construction audits on City Administered Projects at any time. See KDOT Construction Oversight Questionnaire for a list of items that will be of interest during an audit and shall be used in gathering information when preparing for an audit.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 13 - On-Going Material Testing ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will prepare and provide the selected Material Testing Laboratory with a Project Data Sheet for project coordination and communication. The guidelines for quality control/material testing will be performed using the guidelines as described/outlined in the Sampling and Testing Frequency Chart.&lt;br /&gt;
 &lt;br /&gt;
All sampling will be performed at random locations in accordance with the KDOT Construction Manual, Part V, Section 5.17.06. &lt;br /&gt;
See Exhibit No. IV-2f for the Material Sampling and Testing Frequency Chart.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13b is an example of a transmittal letter and the City&#039;s Project Data Sheet.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13c is the City&#039;s Material Testing Log Sheet (excel format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13d is the City&#039;s Material Testing Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13e is the City&#039;s Material Testing Recap Log Sheet (word format).&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-13f is a spreadsheet used to calculate concrete unit weight based on supplier mix design and field test results.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 14 - On-Going Contractor Payments ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City pays Contractors and Consultants, if applicable, on a monthly basis. Ten percent is withheld from Contractor payments until the project is completed. The Consultant will be paid monthly based upon the terms of the agreement.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in consultation with the Project Inspector will prepare the Contractor’s monthly payments based upon work completed by the 25th day of the month. Payments will be forwarded to the Contract Specialist for further handling.&lt;br /&gt;
&lt;br /&gt;
If Consultant payments are necessary, the Consultant shall invoice the City according to the terms of the agreement. These invoices shall be directed to the Project Manager.&lt;br /&gt;
&lt;br /&gt;
On KDOT projects, reimbursement vouchers must be submitted to the KDOT Area Engineer&#039;s Office on a monthly basis for processing through the CMS System.  Note:  The City no longer needs to calculate a reimbursement rate.  KDOT current practice is to pay project charges at the 80/20 ratio until federal funds are all spent and the remaining costs are charged 100% to the City.&lt;br /&gt;
&lt;br /&gt;
Current contact is:&lt;br /&gt;
&lt;br /&gt;
Alma Ocasio&lt;br /&gt;
&lt;br /&gt;
Office Coordinator&lt;br /&gt;
&lt;br /&gt;
Kansas Department of Transportation&lt;br /&gt;
&lt;br /&gt;
District One&lt;br /&gt;
&lt;br /&gt;
1290 South Enterprise&lt;br /&gt;
&lt;br /&gt;
Olathe, Kansas 66061-5355&lt;br /&gt;
&lt;br /&gt;
Appropriate documentation must be provided to justify the payment. Documentation will be copy of the invoice, the pay estimate and the check to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14a is a template with instructions for creating a Monthly Pay Estimate.&lt;br /&gt;
&lt;br /&gt;
{{Note|Each month that a DBE subcontractor works, the City must receive a &amp;quot;DBE Payment Affidavit&amp;quot; and a &amp;quot;Certificate of Subcontract Work and Payment&amp;quot;.   These documents are to ensure payment in full was made by the prime contractor to the DBE subcontractor within 10 days of payment to the prime contractor.  The &amp;quot;DBE Payment Affidavit&amp;quot; is to be completed by the DBE subcontractor.  The &amp;quot;Certificate of Subcontract Work and Payment&amp;quot; is to be completed by the prime contractor.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14b is a DOT Form 1008:  DBE Payment Affidavit.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14c is the Certificate of Subcontract Work and Payment.&lt;br /&gt;
&lt;br /&gt;
{{Note|On all KDOT projects, the Project Manager in conjunction with the Project Inspector shall conduct Wage Rate Interviews and complete KDOT Form No. 209.}}&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-14d is KDOT Form No. 209 and requirements on conducting Wage Rate Interviews.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 15 - On-Going Change Orders ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a change order to construct additional items of work, modify the contract time, or change the character and scope of the work. Each change order shall include a change to the contract time, or indicate that no change in the contract time is included. The change order shall be signed by the contractor prior to execution by the City. Refer to COP 247&lt;br /&gt;
&lt;br /&gt;
A final change order shall be prepared at the end of each project indicating final quantities (overruns and underruns).&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
For KDOT projects, see Exhibit No. V-15e which summarizes the procedure for processing construction change orders.  All change orders shall be forwarded to KDOT’s Area Engineer in charge of the project, prior to execution by the City.&lt;br /&gt;
&lt;br /&gt;
For CARS projects, the City must receive written approval of Johnson County for change orders and project scope modifications if CARS program participation is anticipated in the change order cost.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15a is a blank change order form. (Word Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15b is a blank change order form. (Excel Format)&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15c is a sample completed change order form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15d is a sample change order transmittal letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-15e summarizes the procedure for processing construction change orders for KDOT projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 16 - On-Going Construction Administration ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall be responsible for Construction Administration. These duties shall include, but not be limited to the following:&lt;br /&gt;
&lt;br /&gt;
Visit the Construction site weekly when construction activity is occurring. &lt;br /&gt;
&lt;br /&gt;
Hold regular progress meetings. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve monthly Contractor/Consultant pay estimates as well as change orders. &lt;br /&gt;
&lt;br /&gt;
For KDOT projects, submit all required information, paper work and forms to BLP/Resident Engineer. &lt;br /&gt;
&lt;br /&gt;
For CARS and SMAC projects, complete project status reports at the request of the Johnson County Director of Infrastructure. &lt;br /&gt;
&lt;br /&gt;
Update Project Journal in the Project Database. &lt;br /&gt;
&lt;br /&gt;
Receive telephone inquires and respond accordingly. &lt;br /&gt;
&lt;br /&gt;
Handle project correspondence. &lt;br /&gt;
&lt;br /&gt;
Prepare/approve payment for material testing. &lt;br /&gt;
&lt;br /&gt;
Approve partial acceptance for certain work items, i.e. streetlights and traffic signals. &lt;br /&gt;
&lt;br /&gt;
Conduct final inspection. &lt;br /&gt;
&lt;br /&gt;
Approve final Contractor/Consultant payment. &lt;br /&gt;
&lt;br /&gt;
Submit annual staff billing reports to the Finance Department for projects which staff time is reimbursable. This also includes Improvement Districts.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16a is a sample progress meeting agenda.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16b is a sample progress meeting minutes.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-16c is a sample of a Staff Billing Report to finance.&lt;br /&gt;
&lt;br /&gt;
{{Note|The City will accept certain project work items prior to final project acceptance. As an example, streetlights that have been burning for the required contract time period.}}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 17 - Complete Final Inspection and Prepare a Punch List ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall schedule a final inspection when the project is complete and the Contractor/City inspector concurs that a final inspection is appropriate. The inspection party shall be the members of the City Design Team, the Consultant/Project Manager, Contractor/Sub-Contractors representatives and all other funding sources representative such as KDOT, CARS and SMAC.&lt;br /&gt;
&lt;br /&gt;
As a result of this inspection, a “Punch List” will be prepared by the Consultant/Project Manager and forwarded to the Contractor.  All items on the &amp;quot;Punch List&amp;quot; are to be addressed by the Contractor before final payment is approved.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
If the project is complete except for sod/seeding due to season restrictions, the Contractor will be advised of the next time period when this work will be completed. An amount of money to perform this work shall be held from the Contractor until this work is complete.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-17 is a sample “Punch List” for the Contractor to complete.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 18 - Notify Permitting Agencies ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager shall notify all permitting agencies when the project is complete.&lt;br /&gt;
Exhibit No. V-18a is a sample Notice of Termination letter for Stormwater Runoff from Construction Activities.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18b is an link to KDHE&#039;s Notice of Termination form.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18c is a sample KDOT Highway Permit release letter.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-18d is an example with permit enclosure.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 19 - Prepare Revisions/As-Built Plans ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare revision/as-built plans subsequent to final inspection.&lt;br /&gt;
&lt;br /&gt;
See As-Built Plan Procedure Flow Chart.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 20 - Send Letter to Owners Regarding Sod Care, etc. ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Project Manager, subsequent to the final inspection, will provide all property owners a letter explaining that the project has been completed. The primary message is to convey to the property owners that the sod/seed and tree care (watering and fertilizing) is now the property owners responsibility. The letter should suggest guidelines for taking care of the sod/seed and trees.&lt;br /&gt;
Exhibit No. V-20a is a sample letter to property owners regarding sod/seed care.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-20b is a sample letter to property owners regarding tree care.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 21 - Receive Contractor Project Completion Certification ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist is responsible for obtaining two signed copies of the &amp;quot;Project Completion Certificates&amp;quot; from the Contractor.&lt;br /&gt;
The Contract Specialist will enter the actual project completion date on the Kansas Department of Revenue’s website,&lt;br /&gt;
&lt;br /&gt;
http://www.ksrevenue.org/pecwelcome.htm to discontinue the Contractor’s Tax Exemption number.  &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21a is a sample transmittal letter to the Contractor.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-21b is a State of Kansas Project Completion Certification.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 22 - Project Completion Certification &amp;amp; Scheduling of the Final Inspection Prior to Expiration of 2 Year Performance Bond ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall execute a &amp;quot;Certificate of Engineer as to Completion&amp;quot;. This shall not be signed until all “Punch List” items have been completed and acknowledged by the Project Inspector. For CARS projects, the City will submit certification of project acceptance to Johnson County within thirty days of project completion.&lt;br /&gt;
See Land Disturbance Permit Process as it pertains to the final inspection with the Erosion and Sediment Control Field Reviewer and close out of the LDP.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22a is a sample “Certificate of Engineer as to Completion” form.&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager shall prepare a final inspection letter stating when the maintenance period for the 2 Year Performance Bond will begin.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-22b is a sample final inspection letter.  The final inspection letter is to be copied to the following people for inventory updates:&lt;br /&gt;
&lt;br /&gt;
*Contract Specialist:  For scheduling end of 2 year Performance Bond meeting.&lt;br /&gt;
*Bryce Pittman:  Street network inventory.&lt;br /&gt;
*Bill Heatherman:  Storm Sewer inventory and Bar Grate inventory.&lt;br /&gt;
*Janet Luessenheide:  Snow map updates, Sidewalk inventory, Street Light Projects and Traffic Signal Projects.&lt;br /&gt;
*Public Works Management&lt;br /&gt;
*Public Works Maintenance Supervisors&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
The Contract Specialist will schedule the final inspection prior to expiration of 2 year Performance Bond following the steps below:   &lt;br /&gt;
&lt;br /&gt;
Request the date to be used for the end of the 2 year Performance Bond period and the employees to be included in the final inspections from the Project Manager. &lt;br /&gt;
&lt;br /&gt;
Schedule a meeting using Outlook for 2 months prior to the expiration of the 2 year Performance Bond to give involved employees time to make a final inspection prior to expiration of the bond. &lt;br /&gt;
&lt;br /&gt;
This meeting will be scheduled in Outlook under Public Folders, All Public Folders, Public Works, Public Works Projects.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 23 - Submit Notice of Acceptance to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
When the Contractor has completed all the “Punch List” items the City will be responsible for acceptance of the completed work, as specified in Section 105.17 of KDOT Standard Specifications. The City will use City Form V-2398 to document Notice of Acceptance from the Contractor.  The City is also required by KDOT to submit a DBE Summary Report stating amount paid and work performed by DBE contractor(s) and final breakdown of construction costs by work type.&lt;br /&gt;
Exhibit No. V-23 is a transmittal letter to KDOT regarding completion of project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23a is a copy of the Notice to Acceptance, City Form V-2398.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23b is a copy of KDOT form 270 Final DBE Payment Affidavit. This form is to be completed by the Contractor and returned to the City. The City will utilize form 270 during the preparation of the DBE Summary Report shown below.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23c is a copy of the DBE Summary Report to be completed by the City and submitted to KDOT.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-23d is a sample Final Breakdown of Construction Cost by Work Type.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 24 - Submit Material Certification to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City is responsible for material certifications as documented in Section 2.08 of KDOT’s Construction Manual and Section 2600 KDOT’s Standard Specifications. These certifications are the Contractor’s assurance that the furnished materials/products meet specified requirements.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 25 - Submit Construction Summary Document to KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for submitting the “Construction Summary Document” to KDOT when the project has been accepted from the Contractor. Included with the document will be a statement that the contractor has provided appropriate materials/products certifications for the project.&lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-25 is a copy of the Construction Summary Document form.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 26 - Receive Final Acceptance from KDOT ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The City will be responsible for acceptance of the project for all contracts for completion of the plan requirements and material certification. This will be documented on City Form V-2698. The City will complete a “Final Statement of Cost” for submittal to KDOT.&lt;br /&gt;
Exhibit No. V-26 is a copy of the Final Acceptance of Federal Aid Project, City Form V-2698.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 27 - Approve Consultant Final Pay ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
Subsequent to completing all required Consultant duties and responsibilities, the final pay will be submitted for payment in accordance with the Consultant Agreement.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Task No. 28 - Approve Contractor Final Pay and Surety Release ==&lt;br /&gt;
{{Top}}&lt;br /&gt;
&lt;br /&gt;
The Consultant/Project Manager in conjunction with the Contract Specialist will prepare the Contractor’s final pay and the final change order.&lt;br /&gt;
&lt;br /&gt;
The following will accompany this final pay document to the Finance Department:&lt;br /&gt;
&lt;br /&gt;
Consent of Surety to Final Payment, &lt;br /&gt;
&lt;br /&gt;
Contractor Project Completion Certification (see Phase V, Task No. 21), and &lt;br /&gt;
&lt;br /&gt;
Certificate of Engineer as to Completion (see Phase V, Task No. 22). &lt;br /&gt;
&lt;br /&gt;
Exhibit No. V-28 is a sample transmittal letter with final Change Order/Explanation, Final Contractor Pay Estimate, Certificate of Engineer as to Completion and Surety Release.&lt;/div&gt;</summary>