- 16:08, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 26 - Receive Final Acceptance from KDOT
- 16:07, 14 September 2018 diff hist −117 Phase V - Construction →Task No. 22 - Project Completion Certification & Scheduling of the Final Inspection Prior to Expiration of 2 Year Maintenance Bond
- 16:02, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 16:01, 14 September 2018 diff hist −67 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 16:00, 14 September 2018 diff hist −41 Phase V - Construction →Task No. 21 - Receive Contractor Project Completion Certification
- 15:56, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 20 - Send Letter to Owners Regarding Sod Care, etc.
- 15:55, 14 September 2018 diff hist +7 Phase V - Construction →Task No. 17 - Complete Final Inspection and Prepare a Punch List
- 15:47, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:47, 14 September 2018 diff hist +1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:46, 14 September 2018 diff hist +73 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:44, 14 September 2018 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:41, 14 September 2018 diff hist +6 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:34, 14 September 2018 diff hist +94 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:28, 14 September 2018 diff hist −1 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:22, 14 September 2018 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:22, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:14, 14 September 2018 diff hist −1 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:13, 14 September 2018 diff hist −2 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:11, 14 September 2018 diff hist +7 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:05, 14 September 2018 diff hist 0 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 15:02, 14 September 2018 diff hist +82 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:53, 14 September 2018 diff hist −69 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 14:44, 14 September 2018 diff hist +2 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 14:22, 14 September 2018 diff hist +9 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 14:18, 14 September 2018 diff hist +54 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 14:13, 14 September 2018 diff hist −10 Phase V - Construction →Task No. 4 - Distribute Executed Contract Documents
- 14:08, 14 September 2018 diff hist −2 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:52, 14 September 2018 diff hist +8 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:49, 14 September 2018 diff hist −5 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 13:43, 14 September 2018 diff hist +2 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 13:42, 14 September 2018 diff hist +47 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 13:40, 14 September 2018 diff hist −6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:35, 14 September 2018 diff hist +6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 13:33, 14 September 2018 diff hist −12 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 13:14, 14 September 2018 diff hist +3 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 13:13, 14 September 2018 diff hist +1 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 13:13, 14 September 2018 diff hist +55 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 10:39, 14 September 2018 diff hist −2 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 10:31, 14 September 2018 diff hist +6 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 10:30, 14 September 2018 diff hist +129 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 10:21, 14 September 2018 diff hist +47 Phase II - Preliminary Design →Task No. 25 - Begin Field Check Plan Review
- 10:16, 14 September 2018 diff hist −4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:15, 14 September 2018 diff hist +77 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:08, 14 September 2018 diff hist +25 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 10:02, 14 September 2018 diff hist +49 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:50, 14 September 2018 diff hist +47 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 09:33, 14 September 2018 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:19, 14 September 2018 diff hist +17 Phase IV - Pre-Construction →Task No. 14 - Determine Disadvantaged Business Enterprises (DBE) Involvement
- 09:03, 14 September 2018 diff hist −58 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 16:13, 13 September 2018 diff hist −3 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 16:12, 13 September 2018 diff hist −5 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 16:10, 13 September 2018 diff hist −3 Phase III - Final Design →Task No. 1 - Schedule Third Utility Meeting
- 16:10, 13 September 2018 diff hist −3 Phase III - Final Design →Task No. 16 - Schedule Fourth Utility Meeting
- 16:09, 13 September 2018 diff hist −3 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 14:16, 13 September 2018 diff hist −12 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 13:55, 13 September 2018 diff hist +2 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 13:54, 13 September 2018 diff hist +7 Phase II - Preliminary Design →Task No. 7 - Schedule First Utility Meeting
- 08:30, 13 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 16:46, 6 September 2018 diff hist −19 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:43, 6 September 2018 diff hist −162 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:41, 6 September 2018 diff hist 0 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 16:40, 6 September 2018 diff hist −1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:39, 6 September 2018 diff hist +1 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:35, 6 September 2018 diff hist −15 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 16:22, 6 September 2018 diff hist +16 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 16:20, 6 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:19, 6 September 2018 diff hist −78 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:11, 6 September 2018 diff hist −37 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:06, 6 September 2018 diff hist +89 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 16:00, 6 September 2018 diff hist −43 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 16:45, 5 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 16:40, 5 September 2018 diff hist −98 Phase IV - Pre-Construction →Task No. 3 - Set Bid Opening Date - Schedule Room
- 15:07, 5 September 2018 diff hist −1 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 15:06, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 14:55, 5 September 2018 diff hist −77 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:43, 5 September 2018 diff hist −19 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 14:36, 5 September 2018 diff hist −2 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:35, 5 September 2018 diff hist −8 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:34, 5 September 2018 diff hist +3 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:32, 5 September 2018 diff hist −5 Phase III - Final Design →For CDBG projects, the City’s Standard Contract Documents shall be supplemented with the following:
- 14:28, 5 September 2018 diff hist +1 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:27, 5 September 2018 diff hist −27 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:22, 5 September 2018 diff hist +29 N File:III-11a-2a Bid items (eBid).xlsx Bid Items for electronic bids current
- 14:03, 5 September 2018 diff hist +24 Phase III - Final Design →Task No. 11 - Submit Contract Documents and Insurance
- 14:01, 5 September 2018 diff hist −17 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 13:44, 5 September 2018 diff hist +1 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 12:02, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 11:32, 5 September 2018 diff hist −6 Phase III - Final Design →Task No. 3 - Complete Environmental Process
- 11:22, 5 September 2018 diff hist +6 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:21, 5 September 2018 diff hist +12 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:20, 5 September 2018 diff hist +15 Phase II - Preliminary Design →Task No. 35 - Prepare R/W and Easement Documents
- 11:15, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 29 - Continue Environmental Process
- 11:14, 5 September 2018 diff hist +8 Phase II - Preliminary Design →Task No. 27 - Schedule Field Check Meeting
- 10:54, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 10:47, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 10:46, 5 September 2018 diff hist +3 Phase II - Preliminary Design →Task No. 12 - Other Agency Agreements (if Applicable)
- 10:45, 5 September 2018 diff hist +2 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 10:44, 5 September 2018 diff hist +8 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 10:24, 5 September 2018 diff hist −6 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 08:35, 5 September 2018 diff hist −12 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 08:31, 5 September 2018 diff hist −6 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 08:31, 5 September 2018 diff hist −6 Phase I - Vision →Task 12 - Obtain Priority Evaluation from KDOT
- 08:25, 5 September 2018 diff hist +12 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 08:18, 5 September 2018 diff hist +67 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 15:40, 4 September 2018 diff hist −5 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:38, 4 September 2018 diff hist +39 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:36, 4 September 2018 diff hist +62 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:33, 4 September 2018 diff hist −2 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 15:33, 4 September 2018 diff hist +4 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 15:28, 4 September 2018 diff hist +30 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:23, 4 September 2018 diff hist −9 Phase IV - Pre-Construction →Task No. 20 - Submit Letting Summary Document to KDOT
- 15:20, 4 September 2018 diff hist −7 Phase IV - Pre-Construction →Task No. 18 - Submit Staff Recommendation for Contract Award
- 15:17, 4 September 2018 diff hist +115 Phase IV - Pre-Construction →Task No. 16 - Receive Bid Approval from KDOT
- 15:15, 4 September 2018 diff hist +32 N File:IV-16b checklist for authority to award.pdf Checklist for Authority to Award current
- 14:39, 4 September 2018 diff hist +56 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 14:33, 4 September 2018 diff hist +108 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 14:27, 4 September 2018 diff hist −6 Template:LPA citation current
- 13:35, 4 September 2018 diff hist +2 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 13:34, 4 September 2018 diff hist −3 Phase IV - Pre-Construction →Task No. 13 - Evaluate Possible Contractor Collusion
- 12:05, 4 September 2018 diff hist +20 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 12:03, 4 September 2018 diff hist +34 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 12:00, 4 September 2018 diff hist −4 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 11:58, 4 September 2018 diff hist +4 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:54, 4 September 2018 diff hist +92 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:46, 4 September 2018 diff hist +1 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:43, 4 September 2018 diff hist +68 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:42, 4 September 2018 diff hist −1 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:41, 4 September 2018 diff hist +140 Phase IV - Pre-Construction →Task No. 12 - Determine and Approve the Lowest and Best Qualified Contractor and Subcontractor Percent of Work
- 11:31, 4 September 2018 diff hist +1 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 11:23, 4 September 2018 diff hist +261 Phase IV - Pre-Construction →Task No. 11 - Complete Detailed Bid Tabulation
- 11:07, 4 September 2018 diff hist +55 Phase IV - Pre-Construction →Task No. 10 - Complete Bid Opening
- 10:59, 4 September 2018 diff hist +3 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 10:58, 4 September 2018 diff hist −11 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 10:13, 4 September 2018 diff hist −9 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:36, 4 September 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:32, 4 September 2018 diff hist −64 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:31, 4 September 2018 diff hist +59 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:28, 4 September 2018 diff hist +31 Phase IV - Pre-Construction →Task No. 9 - Prepare Contract Addendum
- 09:22, 4 September 2018 diff hist +10 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:12, 4 September 2018 diff hist +4 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:10, 4 September 2018 diff hist +17 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:08, 4 September 2018 diff hist +102 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:02, 4 September 2018 diff hist +113 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 09:01, 4 September 2018 diff hist +390 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications - KDOT Projects
- 08:37, 4 September 2018 diff hist +407 Phase IV - Pre-Construction →Task No. 8 - Determine Contractor Qualifications
- 08:28, 4 September 2018 diff hist −2 Phase IV - Pre-Construction →Task No. 7 - Conduct Pre-Bid Conference
- 16:22, 31 August 2018 diff hist +113 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 16:15, 31 August 2018 diff hist −1 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 16:14, 31 August 2018 diff hist −90 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:58, 31 August 2018 diff hist +6 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:58, 31 August 2018 diff hist +31 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:34, 31 August 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:28, 31 August 2018 diff hist +216 Phase IV - Pre-Construction →Task No. 6 - Distribute Plans, Contract Documents and Estimate
- 15:15, 31 August 2018 diff hist +20 Phase IV - Pre-Construction →Task No. 5 - Notice to Contractors/DBE Firms
- 15:03, 31 August 2018 diff hist −6 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 15:02, 31 August 2018 diff hist −71 Phase IV - Pre-Construction →Task No. 4 - Publish Legal Advertisement
- 11:20, 31 August 2018 diff hist −1 Phase IV - Pre-Construction →Introduction
- 11:03, 31 August 2018 diff hist −6 Phase V - Construction →Task No. 23 - Submit Notice of Acceptance to KDOT
- 09:56, 31 August 2018 diff hist +7 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 09:55, 31 August 2018 diff hist +196 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 09:13, 31 August 2018 diff hist +188 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 09:08, 31 August 2018 diff hist +719 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 08:26, 31 August 2018 diff hist −3 Phase V - Construction →Task No. 16 - On-Going Construction Administration
- 15:38, 29 August 2018 diff hist +184 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:26, 29 August 2018 diff hist +157 Phase V - Construction →Task No. 15 - On-Going Change Orders
- 15:15, 29 August 2018 diff hist +48 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:56, 29 August 2018 diff hist +330 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:49, 29 August 2018 diff hist +6 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:49, 29 August 2018 diff hist −35 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:47, 29 August 2018 diff hist +145 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:31, 29 August 2018 diff hist +354 Phase V - Construction →Task No. 14 - On-Going Contractor Payments
- 14:23, 29 August 2018 diff hist −74 Phase V - Construction →Task No. 12 - On-Going Inspections
- 14:21, 29 August 2018 diff hist +263 Phase V - Construction →Task No. 12 - On-Going Inspections
- 14:12, 29 August 2018 diff hist −4 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:11, 29 August 2018 diff hist +18 N File:Sample Hold letter to Black & McDonald.pdf Sample hold letter current
- 14:06, 29 August 2018 diff hist −11 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:06, 29 August 2018 diff hist +22 N File:Sample Letter to KCP&L.pdf Sample letter to KCP&L current
- 14:02, 29 August 2018 diff hist +13 Phase V - Construction →Task No. 11a - Coordinate Removal of Streetlights Purchased from KCP&L
- 14:01, 29 August 2018 diff hist +37 N File:Sample Release to Construction letter to Black & McDonald.pdf Sample release to construction letter current
- 11:10, 29 August 2018 diff hist +99 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 11:08, 29 August 2018 diff hist +175 Phase V - Construction →Task No. 11 - Complete Submittals Review
- 10:57, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 10:56, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 10 - Issue Notice to Proceed
- 10:54, 29 August 2018 diff hist −3 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:53, 29 August 2018 diff hist +30 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:47, 29 August 2018 diff hist +6 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:39, 29 August 2018 diff hist +29 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:37, 29 August 2018 diff hist +12 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting
- 10:35, 29 August 2018 diff hist +30 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 10:34, 29 August 2018 diff hist +52 Phase V - Construction →Task No. 7 - Schedule Pre-Construction Conference/Project Sign Confirmation
- 10:27, 29 August 2018 diff hist +59 Phase V - Construction →Task No. 5 - Complete Sales Tax Exemption Forms
- 09:19, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 3 - Submit Cash Flow Projection to City Finance Department
- 09:19, 29 August 2018 diff hist −6 Phase V - Construction →Task No. 2 - Submit Agency Cash Flow Projection
- 09:02, 29 August 2018 diff hist +26 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:01, 29 August 2018 diff hist +27 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:00, 29 August 2018 diff hist +27 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 08:59, 29 August 2018 diff hist −31 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 08:55, 29 August 2018 diff hist +2 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:49, 29 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 08:48, 29 August 2018 diff hist +12 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:47, 29 August 2018 diff hist −90 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:46, 29 August 2018 diff hist +90 Phase III - Final Design →Task No. 18 - Schedule Optional Public Information Meeting
- 08:42, 29 August 2018 diff hist +82 Phase III - Final Design →Task No. 15 - PS&E Review
- 08:32, 29 August 2018 diff hist +84 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 08:21, 29 August 2018 diff hist +101 Phase III - Final Design →For KDOT (Federally Funded) projects, the City’s Standard Contract Documents shall be supplemented with the following required contract provisions:
- 07:48, 29 August 2018 diff hist +6 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 07:46, 29 August 2018 diff hist +27 Phase III - Final Design →Task No. 10 - Submit Specifications and Special Provisions
- 07:37, 29 August 2018 diff hist +6 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:37, 29 August 2018 diff hist 0 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:36, 29 August 2018 diff hist +112 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:33, 29 August 2018 diff hist +55 N File:15.0 LPA-Administered Procedures 2018.pdf Chapter 15 of the KDOT's LPA Project Development Manual current
- 07:30, 29 August 2018 diff hist +10 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:29, 29 August 2018 diff hist −4 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 07:28, 29 August 2018 diff hist +120 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 16:59, 28 August 2018 diff hist −6 Phase III - Final Design →Task No. 9 - Submit Final Check Plans for Review
- 16:57, 28 August 2018 diff hist +6 Phase III - Final Design →Task No. 9 - Submit Final Plans for Review
- 16:56, 28 August 2018 diff hist −6 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:55, 28 August 2018 diff hist +41 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 16:54, 28 August 2018 diff hist +6 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 16:54, 28 August 2018 diff hist +135 Phase III - Final Design →Task No. 8 - Acquire Right-of-Way / Easements - Submit KDOT Forms 1306 and 1304
- 16:50, 28 August 2018 diff hist +50 N File:7.0 Status of Utilities 2018.pdf Chapter 7 of KDOT's LPA Project Development Manual current
- 16:46, 28 August 2018 diff hist +67 Phase III - Final Design →Task No. 7 - Complete Condemnation Process
- 16:41, 28 August 2018 diff hist +16 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:32, 28 August 2018 diff hist −1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:31, 28 August 2018 diff hist −1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:30, 28 August 2018 diff hist −1 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:28, 28 August 2018 diff hist −4 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:27, 28 August 2018 diff hist +52 N File:6.0 Right of Way 2018.pdf Chapter 6.0 of KDOT's LPA Project Development Manual current
- 16:17, 28 August 2018 diff hist +25 Phase III - Final Design →Task No. 5 - Begin Right-of-Way / Easement Negotiations
- 16:16, 28 August 2018 diff hist +148 Phase III - Final Design →Task No. 4 - Complete NEPA Documentation
- 16:15, 28 August 2018 diff hist +147 Phase III - Final Design →Task No. 3 - Complete Environmental Process
- 14:13, 28 August 2018 diff hist +17 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 14:12, 28 August 2018 diff hist +46 N File:II-32i.dot Irina Idelson moved page File:II-32i.dot to File:II-34i appraisal review.dot current
- 14:12, 28 August 2018 diff hist 0 m File:II-34i appraisal review.dot Irina Idelson moved page File:II-32i.dot to File:II-34i appraisal review.dot current
- 13:57, 28 August 2018 diff hist +87 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:52, 28 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:51, 28 August 2018 diff hist +37 N File:II-34h Ranking sheet rw proposals.pdf Ranking Sheet for Appraisal Proposals current
- 13:49, 28 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:47, 28 August 2018 diff hist +52 N File:II-32g Proposal for Appraisal.pdf Irina Idelson moved page File:II-32g Proposal for Appraisal.pdf to File:II-34g Proposal for Appraisal.pdf current
- 13:47, 28 August 2018 diff hist 0 m File:II-34g Proposal for Appraisal.pdf Irina Idelson moved page File:II-32g Proposal for Appraisal.pdf to File:II-34g Proposal for Appraisal.pdf current
- 13:46, 28 August 2018 diff hist +28 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:46, 28 August 2018 diff hist +33 N File:II-34f Memo to Selection Committee.pdf Memorandum to Selection Committee current
- 13:29, 28 August 2018 diff hist −14 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:28, 28 August 2018 diff hist −1 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:27, 28 August 2018 diff hist +40 N File:II-34e Appraiser Agreement over $10K rev 4-25-18.pdf Appraisal Agreement for Fee over $10,000 current
- 13:26, 28 August 2018 diff hist −1 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 13:25, 28 August 2018 diff hist +41 N File:II-34d Appraiser Agreement under 10K rev 4-25-18.pdf Appraisal Agreement for fee under $10,000 current
- 12:05, 28 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 12:04, 28 August 2018 diff hist +18 N File:II-34c summary of takings.xlsx Summary of Takings current
- 12:00, 28 August 2018 diff hist +19 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 11:55, 28 August 2018 diff hist +37 N File:II-34b RFP for Appraisal.docx Example of RFP for Appraisal Services current
- 11:45, 28 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Hire Appraiser
- 11:40, 28 August 2018 diff hist +30 N File:II-32a.docx Irina Idelson moved page File:II-32a.docx to File:II-34a.docx current
- 11:40, 28 August 2018 diff hist 0 m File:II-34a.docx Irina Idelson moved page File:II-32a.docx to File:II-34a.docx
- 11:36, 28 August 2018 diff hist +24 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:35, 28 August 2018 diff hist +45 N File:II-36c Public Meeting Handout.docx Example of Public Information Meeting handout current
- 11:34, 28 August 2018 diff hist +45 N File:II-36c Public Meeting Handout.doc Example of Public Information Meeting handout current
- 11:29, 28 August 2018 diff hist +30 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 11:28, 28 August 2018 diff hist +40 N File:II-36b public meeting sign-in sheet.docx Public Information Meeting Sign-in Sheet current
- 09:00, 28 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 09:00, 28 August 2018 diff hist +22 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 08:59, 28 August 2018 diff hist +36 N File:II-36a public meeting notice.pdf Notice of Public Information Meeting current
- 08:50, 28 August 2018 diff hist −26 Phase II - Preliminary Design →Task No. 36 - Schedule Second Public Information Meeting
- 08:49, 28 August 2018 diff hist +37 N File:II-36.docx Example of Public Meeting Invittation current
- 16:42, 27 August 2018 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of "File:IV-5b.docx"
- 16:31, 27 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 16:30, 27 August 2018 diff hist +29 N File:II-31c.pdf Irina Idelson moved page File:II-31c.pdf to File:II-33c.pdf current
- 16:30, 27 August 2018 diff hist 0 m File:II-33c.pdf Irina Idelson moved page File:II-31c.pdf to File:II-33c.pdf current
- 16:29, 27 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 16:28, 27 August 2018 diff hist +29 N File:II-31b.pdf Irina Idelson moved page File:II-31b.pdf to File:II-33b.pdf current
- 16:28, 27 August 2018 diff hist 0 m File:II-33b.pdf Irina Idelson moved page File:II-31b.pdf to File:II-33b.pdf
- 16:25, 27 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 16:23, 27 August 2018 diff hist +29 N File:II-31a.pdf Irina Idelson moved page File:II-31a.pdf to File:II-33a.pdf current
- 16:23, 27 August 2018 diff hist 0 m File:II-33a.pdf Irina Idelson moved page File:II-31a.pdf to File:II-33a.pdf current
- 16:17, 27 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Submit Right-of-Way Plans/Legal Descriptions
- 16:17, 27 August 2018 diff hist +43 N File:II-33.pdf Example of Legal Descriptions and Tract Map current
- 15:36, 27 August 2018 diff hist −5 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 15:24, 27 August 2018 diff hist +14 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:10, 27 August 2018 diff hist +2 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:09, 27 August 2018 diff hist −65 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:06, 27 August 2018 diff hist +5 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 14:56, 27 August 2018 diff hist +63 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 14:54, 27 August 2018 diff hist +45 N File:Design Exception Request Summary Form 2018.pdf Design Exception Request Form_2018 LPA Manual current
- 14:48, 27 August 2018 diff hist +18 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 14:47, 27 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 14:46, 27 August 2018 diff hist +4 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 14:44, 27 August 2018 diff hist +35 Phase II - Preliminary Design →Task No. 10 - Standard Details
- 14:18, 27 August 2018 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 14:17, 27 August 2018 diff hist −9 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 14:05, 27 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:28, 27 August 2018 diff hist −3 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 09:21, 27 August 2018 diff hist −9 Phase I - Vision →Task 6 - Submit MARC Five Year Plan
- 09:18, 27 August 2018 diff hist −15 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 09:16, 27 August 2018 diff hist +50 Phase I - Vision →Task 6 - Submit MARC Five Year Plan
- 16:35, 24 August 2018 diff hist +7 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:34, 24 August 2018 diff hist 0 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:34, 24 August 2018 diff hist +21 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:32, 24 August 2018 diff hist +20 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:31, 24 August 2018 diff hist −1 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:30, 24 August 2018 diff hist +3 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:15, 24 August 2018 diff hist −2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 16:14, 24 August 2018 diff hist +73 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 14:58, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 35 - Prepare R/W and Easement Documents
- 14:57, 24 August 2018 diff hist +52 Phase II - Preliminary Design →Task No. 35 - Prepare R/W and Easement Documents
- 14:41, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 14:41, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 33 - Prepare R/W and Easement Documents
- 14:41, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 32 - Hire Appraiser
- 14:39, 24 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 32 - NHS Approval Procedure
- 14:38, 24 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 14:38, 24 August 2018 diff hist −1 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 14:37, 24 August 2018 diff hist +2 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 14:36, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 31 - Submit Right-of-Way Plans/Legal Descriptions
- 14:36, 24 August 2018 diff hist +315 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 14:32, 24 August 2018 diff hist +8 Phase II - Preliminary Design →Task No. 31 - Complete Public Interest Finding
- 14:26, 24 August 2018 diff hist +1 Phase II - Preliminary Design →Task No.31 - Complete Public Interest Finding
- 14:24, 24 August 2018 diff hist +313 Phase II - Preliminary Design →Task No. 30 - Obtain Decision for Design Exception from KDOT
- 14:15, 24 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 29 - Continue Environmental Process
- 14:13, 24 August 2018 diff hist −205 Phase II - Preliminary Design →Task No. 28 - Execute Official Agreement with KDOT
- 14:08, 24 August 2018 diff hist +297 Phase II - Preliminary Design →Task No. 27 - Schedule Field Check Meeting
- 13:58, 24 August 2018 diff hist +24 Phase II - Preliminary Design →Task No. 26 - Coordinate Electrical Service for Traffic Signals and Street Lighting
- 13:55, 24 August 2018 diff hist +12 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:53, 24 August 2018 diff hist +18 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:52, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:30, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 13:27, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 20 - Distribute Plans to Utility Companies. Schedule Second Utility Meeting.
- 12:43, 24 August 2018 diff hist −91 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 12:05, 24 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:57, 24 August 2018 diff hist +83 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:54, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:54, 24 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:53, 24 August 2018 diff hist −5 Phase II - Preliminary Design →Task No. 18 - Submit Request for Design Exception to KDOT
- 11:49, 24 August 2018 diff hist +69 N File:5.0 Plan Development 2018.pdf Chapter 5.0 Plan Development of KDOT's LPA Project Development Manual current
- 11:45, 24 August 2018 diff hist −13 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 11:39, 24 August 2018 diff hist −3 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 11:38, 24 August 2018 diff hist −190 Phase II - Preliminary Design →Task No. 17 - Begin Geotechnical Report Process
- 11:34, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:32, 24 August 2018 diff hist −9 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:30, 24 August 2018 diff hist +24 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 11:29, 24 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 14 - Continue Environmental Process
- 11:26, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 11:25, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 12 - Other Agency Agreements (if Applicable)
- 11:25, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 11 - SMAC Preliminary Study
- 10:29, 24 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:24, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:24, 24 August 2018 diff hist −5 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:23, 24 August 2018 diff hist +699 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 10:04, 24 August 2018 diff hist +5 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:59, 24 August 2018 diff hist +16 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:57, 24 August 2018 diff hist +10 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:52, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:51, 24 August 2018 diff hist +18 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:49, 24 August 2018 diff hist +12 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:43, 24 August 2018 diff hist +2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:40, 24 August 2018 diff hist +197 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:22, 24 August 2018 diff hist −2 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 09:21, 24 August 2018 diff hist −99 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:56, 24 August 2018 diff hist +28 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:54, 24 August 2018 diff hist +24 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:52, 24 August 2018 diff hist +24 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:50, 24 August 2018 diff hist +14 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:47, 24 August 2018 diff hist +35 N File:2018 LPA Manual.pdf 2018 LPA Project Development Manual current
- 08:45, 24 August 2018 diff hist −21 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:42, 24 August 2018 diff hist +6 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:42, 24 August 2018 diff hist −56 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:39, 24 August 2018 diff hist 0 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:38, 24 August 2018 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:29, 24 August 2018 diff hist +5 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:23, 24 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:22, 24 August 2018 diff hist −1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:22, 24 August 2018 diff hist −18 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:17, 24 August 2018 diff hist +18 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:15, 24 August 2018 diff hist −12 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:14, 24 August 2018 diff hist −47 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:13, 24 August 2018 diff hist +41 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:12, 24 August 2018 diff hist +19 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:09, 24 August 2018 diff hist +40 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 07:51, 24 August 2018 diff hist −3 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 07:46, 24 August 2018 diff hist +7 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 07:19, 24 August 2018 diff hist +1 Phase I - Vision →Task 5 - Obtain City Council Approval - CIP
- 16:05, 23 August 2018 diff hist +4 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 16:04, 23 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 16:04, 23 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 16:00, 23 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 15:59, 23 August 2018 diff hist +52 N File:8.0 CE Consultant Selection and Agreement 2018.pdf Chapter 8.0 of KDOT's LPA Project Development Manual current
- 15:57, 23 August 2018 diff hist −4 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 15:56, 23 August 2018 diff hist +57 N File:4.0 Environmental 2018.pdf Chapter 4.0 of KDOT's LPA Project Development Manual 2018 current
- 15:54, 23 August 2018 diff hist −4 Phase I - Vision →Task 14 - Receive Project Authorization from KDOT. Begin Environmental Process.
- 15:54, 23 August 2018 diff hist −4 Phase I - Vision →Task 13 - Submit KDOT Form 1302 for Project Request. Submit City's Request to Administer the Project
- 15:53, 23 August 2018 diff hist −4 Phase I - Vision →Task 12 - Obtain Priority Evaluation from KDOT
- 15:52, 23 August 2018 diff hist +57 N File:2.0 Programming 2018.pdf Chapter 2.0 of KDOT's LPA Project Development Manual 2018 current
- 15:50, 23 August 2018 diff hist −4 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 15:49, 23 August 2018 diff hist +53 N File:3.0 PE Consultant Selection and Agreement 2018.pdf Chapter 03.0 of KDOT's LPA Project Development Manual current
- 15:42, 23 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 15:42, 23 August 2018 diff hist +19 Phase II - Preliminary Design →Task No. 13 - Conduct Field Surveys
- 14:52, 23 August 2018 diff hist +46 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 12:18, 23 August 2018 diff hist −3 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 12:17, 23 August 2018 diff hist +70 N File:17.0 Bridge Design 2018.pdf Chapter 17.0 Bridge Design of KDOT LPA Project Development Manual 2018 current
- 08:08, 23 August 2018 diff hist −9 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 08:00, 23 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 07:59, 23 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 07:56, 23 August 2018 diff hist +1 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 07:55, 23 August 2018 diff hist +21 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 07:54, 23 August 2018 diff hist +22 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 07:49, 23 August 2018 diff hist +20 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 16:13, 2 August 2018 diff hist 0 File:Project Submittal Form concrete work.pdf Irina Idelson uploaded a new version of "File:Project Submittal Form concrete work.pdf" current
- 16:08, 2 August 2018 diff hist 0 File:Project Submittal Form concrete work.pdf Irina Idelson uploaded a new version of "File:Project Submittal Form concrete work.pdf"
- 16:43, 26 July 2018 diff hist 0 File:IV-5h.docx Irina Idelson uploaded a new version of "File:IV-5h.docx"
- 13:15, 25 July 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 11:49, 13 July 2018 diff hist +9 Phase III - Final Design →Task No. 19 - Receive Obligation of Funds from KDOT
- 10:58, 13 July 2018 diff hist 0 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 10:57, 13 July 2018 diff hist +30 Phase III - Final Design →Task No. 22 - Confirm Construction Engineering Responsibility
- 13:32, 9 July 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 11:57, 9 July 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 11:54, 9 July 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 15:20, 26 June 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 15:15, 26 June 2018 diff hist +1 Phase V - Construction →Task No. 18 - Notify Permitting Agencies
- 15:31, 15 June 2018 diff hist +39 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:17, 15 June 2018 diff hist +4 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 15:13, 15 June 2018 diff hist +216 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:45, 15 June 2018 diff hist +1 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:44, 15 June 2018 diff hist +2 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:43, 15 June 2018 diff hist −1 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:42, 15 June 2018 diff hist +28 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 11:38, 15 June 2018 diff hist +52 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:35, 15 June 2018 diff hist +45 N File:II-24 KDWPT Notification Letter.pdf example of KDWPT environmental review request current
- 10:34, 15 June 2018 diff hist +67 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 10:22, 15 June 2018 diff hist +16 Phase II - Preliminary Design →Task No. 24 - Submit Required Permit Applications
- 14:23, 4 June 2018 diff hist 0 File:IV-5i.docx Irina Idelson uploaded a new version of "File:IV-5i.docx"
- 16:58, 23 May 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 16:57, 23 May 2018 diff hist 0 File:IV-5i.docx Irina Idelson uploaded a new version of "File:IV-5i.docx"
- 09:04, 7 May 2018 diff hist −3 Phase II - Preliminary Design →Task No. 34 - Schedule Second Public Information Meeting
- 16:37, 3 May 2018 diff hist −3 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:36, 3 May 2018 diff hist +44 N File:II-3b Engineering Architectural Services Agreement rev 4-25-18.docx Engineering Architectural Services Agreement current
- 16:34, 3 May 2018 diff hist +41 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 16:33, 3 May 2018 diff hist +35 N File:IV-2g Testing Services Agreement - rev 4-25-18.docx Material Testing Services Agreement current
- 16:30, 3 May 2018 diff hist −4 Phase II - Preliminary Design →Task No. 32 - Hire Appraiser
- 16:29, 3 May 2018 diff hist +40 N File:II-32e Appraiser Agreement over $10K rev 4-25-18.docx Appraiser Agreement for fee over $10,000 current
- 16:28, 3 May 2018 diff hist −7 Phase II - Preliminary Design →Task No. 32 - Hire Appraiser
- 16:28, 3 May 2018 diff hist +2 Phase II - Preliminary Design →Task No. 32 - Hire Appraiser
- 16:27, 3 May 2018 diff hist +41 N File:II-32d Appraiser Agreement under 10K rev 4-25-18.docx Appraiser Agreement for fee under $10,000 current
- 16:26, 3 May 2018 diff hist 0 File:II-32d Appraiser Agreement under 10K 6-3-13.docx Irina Idelson uploaded a new version of "File:II-32d Appraiser Agreement under 10K 6-3-13.docx" current
- 16:23, 3 May 2018 diff hist 0 File:II-32d Appraiser Agreement under $10K updated 12-20-17.pdf Irina Idelson uploaded a new version of "File:II-32d Appraiser Agreement under $10K updated 12-20-17.pdf" current
- 16:21, 3 May 2018 diff hist −4 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:20, 3 May 2018 diff hist +44 N File:II-3c Consultant Agreement-non design rev 4-25-18.docx Consultant Agreement fro non-design projects current
- 16:13, 3 May 2018 diff hist +1 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:13, 3 May 2018 diff hist +15 Phase II - Preliminary Design →Task No. 3 - Consultant Selection/Certification
- 16:12, 3 May 2018 diff hist 0 File:II-3b Engineering Architectural Services Agreement updated 8-1-13.docx Irina Idelson uploaded a new version of "File:II-3b Engineering Architectural Services Agreement updated 8-1-13.docx" current
- 13:09, 24 April 2018 diff hist +2 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 12:06, 24 April 2018 diff hist +4 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 12:05, 24 April 2018 diff hist −161 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 12:02, 24 April 2018 diff hist +51 N File:V-6b.pdf Sample Letter to Material Testing Firm not selected current
- 11:58, 24 April 2018 diff hist +123 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 11:28, 24 April 2018 diff hist +6 Phase V - Construction →Task No. 6 - Complete Material Testing Contracts
- 14:45, 20 April 2018 diff hist 0 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 14:43, 20 April 2018 diff hist +39 N File:IV-2b.doc RFP for Testing and Inspection Services current
- 11:54, 20 April 2018 diff hist 0 File:IV-2h.docx Irina Idelson uploaded a new version of "File:IV-2h.docx" current
- 11:51, 20 April 2018 diff hist 0 File:IV-2g.docx Irina Idelson uploaded a new version of "File:IV-2g.docx" current
- 11:47, 20 April 2018 diff hist +48 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 11:46, 20 April 2018 diff hist +47 N File:IV-2e Testing Specifications Exhibit C - rev 12-21-15.pdf Material and Testing Specifications (Exhibit C) current
- 11:25, 20 April 2018 diff hist −16 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 11:24, 20 April 2018 diff hist −107 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 15:51, 19 April 2018 diff hist 0 File:IV-2 Testing Proposal Exhibit A - rev 4-4-14.docx Irina Idelson uploaded a new version of "File:IV-2 Testing Proposal Exhibit A - rev 4-4-14.docx" current
- 15:48, 19 April 2018 diff hist 0 File:IV-2 Testing Proposal Exhibit A - rev 4-4-14.docx Irina Idelson uploaded a new version of "File:IV-2 Testing Proposal Exhibit A - rev 4-4-14.docx"
- 09:56, 18 April 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 09:04, 18 April 2018 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of "File:IV-5c.docx"
- 08:59, 18 April 2018 diff hist 0 File:II-3o.xlsx Irina Idelson uploaded a new version of "File:II-3o.xlsx"
- 10:48, 16 April 2018 diff hist −110 Phase IV - Pre-Construction →Task No. 2 - Selection of Material Testing Firm
- 08:05, 9 April 2018 diff hist 0 File:IV-5i.docx Irina Idelson uploaded a new version of "File:IV-5i.docx"
- 08:03, 9 April 2018 diff hist 0 File:IV-5c.docx Irina Idelson uploaded a new version of "File:IV-5c.docx"
- 08:01, 9 April 2018 diff hist 0 File:IV-5b.docx Irina Idelson uploaded a new version of "File:IV-5b.docx"
- 07:59, 9 April 2018 diff hist 0 File:IV-5a.docx Irina Idelson uploaded a new version of "File:IV-5a.docx"
- 08:44, 14 March 2018 diff hist +3 Contractor Submittal Forms
- 08:44, 14 March 2018 diff hist +39 N File:Project Submittal Form storm drainage.pdf Project Submittal Form - Storm Drainage current
- 08:42, 14 March 2018 diff hist 0 File:Project Submittal Form sediment control.pdf Irina Idelson uploaded a new version of "File:Project Submittal Form sediment control.pdf" current
- 08:39, 14 March 2018 diff hist 0 File:Project Submittal Form guardrail.pdf Irina Idelson uploaded a new version of "File:Project Submittal Form guardrail.pdf" current
- 08:37, 14 March 2018 diff hist 0 File:Project Submittal Form concrete work.pdf Irina Idelson uploaded a new version of "File:Project Submittal Form concrete work.pdf"
- 08:34, 14 March 2018 diff hist 0 File:Project Submittal Form bridge items.pdf Irina Idelson uploaded a new version of "File:Project Submittal Form bridge items.pdf" current
- 08:25, 14 March 2018 diff hist +3 Contractor Submittal Forms
- 11:40, 7 March 2018 diff hist 0 File:Phase III Checklist.docx Irina Idelson uploaded a new version of "File:Phase III Checklist.docx"
- 11:40, 7 March 2018 diff hist 0 File:Phase III Checklist.docx Irina Idelson uploaded a new version of "File:Phase III Checklist.docx"
- 11:31, 7 March 2018 diff hist −1 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting.
- 15:52, 6 March 2018 diff hist 0 File:Maintenance Plan Review Process.docx Irina Idelson uploaded a new version of "File:Maintenance Plan Review Process.docx" current
- 15:31, 6 March 2018 diff hist −24 Phase II - Preliminary Design →Task No. 23 - Distribute Plans for Field Check
- 14:37, 6 March 2018 diff hist −19 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting.
- 14:36, 6 March 2018 diff hist −38 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 3rd Public Information Meeting.
- 14:35, 6 March 2018 diff hist +22 N File:Exhibit No. V-9c Handout.pdf Public Meeting Handout current
- 14:31, 6 March 2018 diff hist 0 Phase V - Construction →Task No. 9 - Send Information Letter to Residents. Schedule 4th Public Information Meeting.
- 14:15, 6 March 2018 diff hist +7 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 14:15, 6 March 2018 diff hist +23 N File:Reject letter.pdf Sample Rejection Letter current
- 14:14, 6 March 2018 diff hist +6 Phase IV - Pre-Construction →Task No. 19 - Award Contract by City Council
- 14:13, 6 March 2018 diff hist +27 N File:Award letter.pdf Sample Project Award Letter current
- 14:05, 6 March 2018 diff hist +3 Phase III - Final Design →Task No. 18 - Schedule Third Public Information Meeting
- 12:52, 6 March 2018 diff hist +13 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 12:51, 6 March 2018 diff hist +20 N File:Exhibit No. II-15c.docx Citizen Comment Form current
- 12:46, 6 March 2018 diff hist +12 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 12:46, 6 March 2018 diff hist +36 N File:Exhibit No. II-15a.pdf Notice of Public Information Meeting current
- 12:44, 6 March 2018 diff hist +13 Phase II - Preliminary Design →Task No. 15 - Schedule First Public Information Meeting
- 12:43, 6 March 2018 diff hist +40 N File:Exhibit No. II-15.docx Invitation to Public Information Meeting current
- 14:32, 23 February 2018 diff hist +22 Phase II - Preliminary Design →Task No. 9 - Design Criteria
- 14:31, 23 February 2018 diff hist +20 N File:2018 Bridge Inventory SOP.pdf Bridge Inventory SOP current